Combined Notice of Filings #1, 2209-2210 [2019-01168]
Download as PDF
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 12,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–01155 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
[Docket No. ER19–847–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: San Pablo Raceway,
LLC
This is a supplemental notice in the
above-referenced proceeding of San
Pablo Raceway, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 12,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–01163 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
2209
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–50–000.
Applicants: Frontier Utilities
Northeast LLC, NextEra Energy Services,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Frontier
Utilities Northeast LLC, et al.
Filed Date: 1/25/19.
Accession Number: 20190125–5181.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: EC19–51–000.
Applicants: Bloom Energy
Corporation, Diamond State Generation
Partners, LLC, Yellow Jacket Energy,
LLC, 2014 ESA Project Company, LLC,
2015 ESA Project Company, LLC,
Canada Pension Plan Investment Board.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Bloom
Energy Corporation, et al.
Filed Date: 1/28/19.
Accession Number: 20190128–5109.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–52–000.
Applicants: Crystal Lake Wind Energy
I, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy I, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128–5120.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: EG19–53–000.
Applicants: Crystal Lake Wind Energy
II, LLC.
Description: Self-Certification of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy II, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128–5121.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–615–003;
ER10–2184–027; ER10–2192–032;
ER10–2178–032; ER11–2014–025;
ER11–2013–025 ER13–1536–016; ER11–
2005–025.
Applicants: Albany Green Energy,
LLC, CER Generation, LLC,
E:\FR\FM\06FEN1.SGM
06FEN1
amozie on DSK3GDR082PROD with NOTICES1
2210
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
Constellation Energy Commodities
Group Maine, LLC, Constellation
NewEnergy, Inc., Cow Branch Wind
Power, LLC, CR Clearing, LLC, Exelon
Generation Company, LLC, Wind
Capital Holdings, LLC.
Description: Supplement to December
22, 2017 Updated Market Power
Analysis for the Southeast Region of the
Exelon Southeast Entities.
Filed Date: 1/24/19.
Accession Number: 20190124–5212.
Comments Due: 5 p.m. ET 2/7/19.
Docket Numbers: ER17–2386–001.
Applicants: Great Bay Solar I, LLC.
Description: Report Filing: Refund
Report (ER17–2386 and EL18–8) to be
effective N/A.
Filed Date: 1/28/19.
Accession Number: 20190128–5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18–1708–001.
Applicants: Copenhagen Wind Farm,
LLC.
Description: Notice of Non-Material
Change in Status of Copenhagen Wind
Farm, LLC.
Filed Date: 1/24/19.
Accession Number: 20190124–5229.
Comments Due: 5 p.m. ET 2/14/19.
Docket Numbers: ER18–1954–002.
Applicants: Gulf Power Company.
Description: Compliance filing: Notice
of Effective Date & Compliance Filing
(NITSA/NOA) ER18–1954 to be effective
1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5141.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER18–2352–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–01–28_Amendment to Real-Time
Buybacks of Spinning and Offline
Supplemental to be effective 2/14/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5041.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–871–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–ETEC Contracting Services
Agreements (Monitor, Op, Dispatch) to
be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5113.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER19–872–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_SA 1925 ITC MidwestInterstate Power and Light 4th Rev DTIA
to be effective 3/30/2019.
Filed Date: 1/28/19.
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
Accession Number: 20190128–5104.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–873–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Lighthouse EC-Golden Spread
EC Interconnection Agreement to be
effective 1/15/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5108.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–874–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5260; Queue
No. AD1–060 to be effective 1/2/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5119.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–875–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_Cyber Security
Coordination to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5135.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10684–000]
Lansing Board of Water and Light;
Notice of Existing Licensee’s Failure
To File a Notice of Intent To File a
Subsequent License Application, and
Soliciting Notices of Intent To File a
License Application and PreApplication Documents
The current license for the Lansing
Board of Water and Light’s Moores Park
Project No. 10684 (Moores Park Project)
was issued on January 5, 1994, for a
term of 30 years, ending December 31,
2023.1 The 600-kilowatt (kW) project is
located on the Grand River in the City
of Lansing, in Ingham County,
Michigan.
The principal project works consist
of: (1) A 240-acre reservoir with 2,000acre-feet of storage at a normal water
surface elevation of 833.6 feet National
Geodetic Vertical Datum; (2) a 190-footlong, 21-foot-high reinforced concrete
gravity dam divided into a 120-foot-long
flashboard-crested spillway section and
a 70-foot-long, three-bay Taintor-gate
section, each gate measuring 20-footlong by 10-foot-high; (3) a 110-foot-long,
50- to 83-foot-wide, 61-foot-high integral
water-impounding powerhouse
constructed of reinforced concrete and
brick masonry containing one horizontal
axis turbine-generator unit rated at 600
kW; (4) a 200-foot-long, 4,160-volt
underground transmission line
connected to a step-up transformer; and
(5) appurtenant equipment and
facilities.
At least five years before the
expiration of a license for a minor water
power project in which sections 14 and
15 of the Federal Power Act were
waived, the Commission’s regulations
require the licensee to file with the
Commission a notice of intent (NOI) that
contains an unequivocal statement of
the licensee’s intention to file or not to
file an application for a subsequent
license, details on the principal project
works and installed plant capacity, and
other information.2
If such a licensee does not inform the
Commission that it intends to file an
application for, in this case, a
subsequent license for the project, the
licensee may not file an application for
a subsequent license, either individually
or in conjunction with an entity or
[FR Doc. 2019–01168 Filed 2–5–19; 8:45 am]
1 Lansing Board of Water and Light, 66 FERC
62,002 (1994).
2 18 CFR 16.19(b) (2018) (citing 18 CFR 16.6(b)
(2018)).
BILLING CODE 6717–01–P
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 84, Number 25 (Wednesday, February 6, 2019)]
[Notices]
[Pages 2209-2210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01168]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-50-000.
Applicants: Frontier Utilities Northeast LLC, NextEra Energy
Services, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Frontier Utilities Northeast LLC, et al.
Filed Date: 1/25/19.
Accession Number: 20190125-5181.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: EC19-51-000.
Applicants: Bloom Energy Corporation, Diamond State Generation
Partners, LLC, Yellow Jacket Energy, LLC, 2014 ESA Project Company,
LLC, 2015 ESA Project Company, LLC, Canada Pension Plan Investment
Board.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Bloom Energy Corporation, et al.
Filed Date: 1/28/19.
Accession Number: 20190128-5109.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-52-000.
Applicants: Crystal Lake Wind Energy I, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Crystal Lake Wind Energy I, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128-5120.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: EG19-53-000.
Applicants: Crystal Lake Wind Energy II, LLC.
Description: Self-Certification of Self-Certification of Exempt
Wholesale Generator Status of Crystal Lake Wind Energy II, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128-5121.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-615-003; ER10-2184-027; ER10-2192-032; ER10-
2178-032; ER11-2014-025; ER11-2013-025 ER13-1536-016; ER11-2005-025.
Applicants: Albany Green Energy, LLC, CER Generation, LLC,
[[Page 2210]]
Constellation Energy Commodities Group Maine, LLC, Constellation
NewEnergy, Inc., Cow Branch Wind Power, LLC, CR Clearing, LLC, Exelon
Generation Company, LLC, Wind Capital Holdings, LLC.
Description: Supplement to December 22, 2017 Updated Market Power
Analysis for the Southeast Region of the Exelon Southeast Entities.
Filed Date: 1/24/19.
Accession Number: 20190124-5212.
Comments Due: 5 p.m. ET 2/7/19.
Docket Numbers: ER17-2386-001.
Applicants: Great Bay Solar I, LLC.
Description: Report Filing: Refund Report (ER17-2386 and EL18-8) to
be effective N/A.
Filed Date: 1/28/19.
Accession Number: 20190128-5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18-1708-001.
Applicants: Copenhagen Wind Farm, LLC.
Description: Notice of Non-Material Change in Status of Copenhagen
Wind Farm, LLC.
Filed Date: 1/24/19.
Accession Number: 20190124-5229.
Comments Due: 5 p.m. ET 2/14/19.
Docket Numbers: ER18-1954-002.
Applicants: Gulf Power Company.
Description: Compliance filing: Notice of Effective Date &
Compliance Filing (NITSA/NOA) ER18-1954 to be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125-5141.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER18-2352-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-01-28_Amendment to Real-Time
Buybacks of Spinning and Offline Supplemental to be effective 2/14/
2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5041.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-871-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: SWEPCO-ETEC Contracting
Services Agreements (Monitor, Op, Dispatch) to be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125-5113.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER19-872-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-28_SA 1925 ITC
Midwest-Interstate Power and Light 4th Rev DTIA to be effective 3/30/
2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5104.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-873-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Lighthouse EC-Golden
Spread EC Interconnection Agreement to be effective 1/15/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5108.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-874-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5260;
Queue No. AD1-060 to be effective 1/2/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5119.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-875-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-28_Cyber Security
Coordination to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5135.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-01168 Filed 2-5-19; 8:45 am]