Combined Notice of Filings #2, 2207-2208 [2019-01152]

Download as PDF Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices with physical disabilities or special needs. If you require special accommodations due to a disability, please contact Brad Bugger at least seven days in advance of the meeting at the phone number listed above. Written statements may be filed with the Board either before or after the meeting. Individuals who wish to make oral presentations pertaining to agenda items should contact Brad Bugger at the address or telephone number listed above. The request must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Brad Bugger, Federal Coordinator, at the address and phone number listed above. Minutes will also be available at the following website: https://energy.gov/em/icpcab/listings/ cab-meetings. Signed in Washington, DC on January 31, 2019. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2019–01236 Filed 2–5–19; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–837–000] amozie on DSK3GDR082PROD with NOTICES1 C.P. Crane LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of C.P. Crane LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. VerDate Sep<11>2014 18:09 Feb 05, 2019 Jkt 247001 Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 11, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link above. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 22, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–01158 Filed 2–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–910–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: APCo-Gulf TFCAT Amended and Restated Service Agreements Filing to be effective 1/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5088. Comments Due: 5 p.m. ET 2/20/19. PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 2207 Docket Numbers: ER19–911–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2019–01–30 SPS Wholesale Real Power Losses-Filing to be effective 4/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5089. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–912–000. Applicants: Georgia Power Company. Description: § 205(d) Rate Filing: GPCGulf Scherer 3 TFCAT Amended and Restated Service Agreement Filing to be effective 1/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5091. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–913–000. Applicants: PacifiCorp. Description: Tariff Cancellation: Termination of EWEB Non-Conf PTP Agreement to be effective 2/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5123. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–914–000. Applicants: San Diego Gas & Electric Company. Description: § 205(d) Rate Filing: Service Agreement No. 59 FERC Electric Tariff Volume No. 11 Mesquite Solar 5 to be effective 2/3/2019. Filed Date: 1/30/19. Accession Number: 20190130–5124. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–915–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–01–30_RAN Outage Coordination Filing to be effective 4/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5125. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–916–000. Applicants: Selmer Farm, LLC. Description: Compliance filing: Compliance Filing—Category 2 Seller to be effective 3/31/2019. Filed Date: 1/30/19. Accession Number: 20190130–5130. Comments Due: 5 p.m. ET 2/20/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\06FEN1.SGM 06FEN1 2208 Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 30, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–01152 Filed 2–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–55–000] amozie on DSK3GDR082PROD with NOTICES1 Notice of Request Under Blanket Authorization: Southern Natural Gas Company, LLC Take notice that on January 22, 2019, Southern Natural Gas Company, LLC (Southern) 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, filed in Docket No. CP19–55–000 a prior notice request pursuant to sections 157.205 and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA), and Southern’s blanket certificate issued in Docket No. CP82–406–000, seeking authorization to replace a tap and suction line tied to its North Main System in order to increase capacity (North Main Upgrade Project). Southern states that as a result of Southern’s open season posted on September 18, 2018, the shipper Southern Company Services, Inc. amended their Service Agreement with Southern to provide an additional 5,000 dekatherm per day of firm transportation on Southern’s North Main System. Southern determined that operational capacity is available on a short term basis at this location, however, additional facilities will be required to provide this service throughout the term of the agreement. Specifically, Southern proposes to replace the 12-inch tap and suction line located at its McConnells Compressor Station with a 20-inch tap and suction line. This tap and suction line connects to Southern’s 22-inch North Main System at Milepost 260.742 in Tuscaloosa County, Alabama. This proposed tap and suction line replacement will take place entirely within the footprint of Southern’s property located at its McConnells Compressor Station. The North Main Upgrade Project will increase the efficiency of Southern’s North Main VerDate Sep<11>2014 18:09 Feb 05, 2019 Jkt 247001 System without the need for additional compression or pipeline looping. Southern estimates the cost of the Project to be $1.7 million, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to T. Brooks Henderson, Director, Rates & Regulatory Affairs Department, PO Box 2563, Birmingham, Alabama 35202–2563, by telephone at (205)325–3843, or by email at brooks_henderson@ kindermorgan.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: January 30, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–01149 Filed 2–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–846–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Antelope DSR 3, LLC This is a supplemental notice in the above-referenced proceeding of Antelope DSR 3, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\06FEN1.SGM 06FEN1

Agencies

[Federal Register Volume 84, Number 25 (Wednesday, February 6, 2019)]
[Notices]
[Pages 2207-2208]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01152]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-910-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: APCo-Gulf TFCAT Amended and 
Restated Service Agreements Filing to be effective 1/1/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5088.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-911-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: 2019-01-30 SPS Wholesale 
Real Power Losses-Filing to be effective 4/1/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5089.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-912-000.
    Applicants: Georgia Power Company.
    Description: Sec.  205(d) Rate Filing: GPC-Gulf Scherer 3 TFCAT 
Amended and Restated Service Agreement Filing to be effective 1/1/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5091.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-913-000.
    Applicants: PacifiCorp.
    Description: Tariff Cancellation: Termination of EWEB Non-Conf PTP 
Agreement to be effective 2/1/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5123.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-914-000.
    Applicants: San Diego Gas & Electric Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 59 
FERC Electric Tariff Volume No. 11 Mesquite Solar 5 to be effective 2/
3/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5124.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-915-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-01-30_RAN Outage 
Coordination Filing to be effective 4/1/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5125.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER19-916-000.
    Applicants: Selmer Farm, LLC.
    Description: Compliance filing: Compliance Filing--Category 2 
Seller to be effective 3/31/2019.
    Filed Date: 1/30/19.
    Accession Number: 20190130-5130.
    Comments Due: 5 p.m. ET 2/20/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

[[Page 2208]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-01152 Filed 2-5-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.