Combined Notice of Filings #1, 2211-2213 [2019-01151]
Download as PDF
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
entities that are not currently licensees
of the project.3
Because the existing license expires
on December 31, 2023, the NOI was due
to be filed by the close of business on
December 31, 2018. The Lansing Board
of Water and Light, the existing licensee
for the Moores Park Project, failed to file
an NOI for the project by this date.4
Any party interested in filing a license
application for the Moores Park Project
No. 10684 must first file a NOI 5 and
pre-application document (PAD) 6
pursuant to Part 5 of the Commission’s
regulations. Although the integrated
licensing process (ILP) is the default
pre-filing process, section 5.3(b) of the
Commission’s regulations allows a
potential license applicant to request to
use the traditional licensing process or
alternative procedures when it files its
NOI.7
This notice sets a deadline of 120
days from the date of this notice for
interested applicants, other than the
existing licensee, to file NOIs, PADs,
and requests to use the traditional
licensing process or alternative
procedures.
Applications for a subsequent license
from potential applicants must be filed
with the Commission at least 24 months
prior to the expiration of the existing
license.8 Because the existing license
expires on December 31, 2023,
applications for license for this project
must be filed by December 31, 2021.9
Questions concerning this notice
should be directed to Lee Emery at (202)
502–8379 or lee.emery@ferc.gov.
Dated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–01189 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
3 18
CFR 16.24(b) (2018).
CFR 16.23(b) (2018).
5 18 CFR 5.5 (2018).
6 18 CFR 5.6 (2018).
7 18 CFR 5.3(b) (2018).
8 18 CFR 16.20 (2018).
9 To the extent an interested applicant files an
NOI and PAD and elects or is required to use the
Commission’s ILP, a process plan will be issued
within 180 days of this notice, which accelerates
the steps of the ILP to allow for filing a timely
subsequent license application by the December 31,
2021 deadline.
amozie on DSK3GDR082PROD with NOTICES1
4 18
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
Docket Numbers: ER11–4507–010.
Applicants: Canastota Windpower,
LLC.
Description: Notice of Non-Material
Change in Status of Canastota
Windpower, LLC.
Filed Date: 1/29/19.
Accession Number: 20190129–5250.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER14–1421–001.
Applicants: Diamond State
Generation Partners, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT & Request
for Waiver to be effective N/A.
Filed Date: 1/29/19.
Accession Number: 20190129–5186.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18–1934–001.
Applicants: Alabama Power
Company.
Description: Compliance filing: OATT
Compliance Filing (Relating to Sale of
Gulf Power) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5084.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER18–1938–001.
Applicants: Alabama Power
Company.
Description: Compliance filing:
Transmission Facility Cost Allocation
Tariff Compliance Filing to be effective
1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5085.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–256–002.
Applicants: Wisconsin Power and
Light Company.
Description: Tariff Amendment:
Amendment to WPL Wholesale Formula
Rate Application to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5209.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–257–002.
Applicants: Interstate Power and
Light Company.
Description: Tariff Amendment:
Amendment to IPL Wholesale Formula
Rate Application to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5212.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–361–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
International Transmission Company,
Michigan Electric Transmission
Company, LLC, ITC Midwest LLC.
Description: Report Filing: 2019–01–
29_Refund Report for ITC Companies re
Transco Adder (EL18–140) to be
effective N/A.
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
2211
Filed Date: 1/29/19.
Accession Number: 20190129–5163.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–541–001.
Applicants: ITC Midwest LLC.
Description: Tariff Amendment:
Amendment to Filing of JUA with JoCarroll Energy to be effective 2/11/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5201.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–846–000.
Applicants: Antelope DSR 3, LLC.
Description: Supplement to January
22, 2019 Antelope DSR 3, LLC tariff
filing.
Filed Date: 1/29/19.
Accession Number: 20190129–5239.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19–847–000.
Applicants: San Pablo Raceway, LLC.
Description: Supplement to January
22, 2019 San Pablo Raceway, LLC tariff
filing.
Filed Date: 1/29/19.
Accession Number: 20190129–5243.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19–884–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: DECSoCo Amended and Restated
Interconnection Contract Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–886–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: DEFSoCo Amended and Restated
Interconnection Contract Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5139.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–887–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Filing of Interchange Contract
Amendments (to remove Gulf) to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5141.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–888–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Filing of NITSA Amendments (to
remove Gulf) to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5143.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–889–000.
E:\FR\FM\06FEN1.SGM
06FEN1
amozie on DSK3GDR082PROD with NOTICES1
2212
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
Applicants: Alabama Power
Company.
Description: Tariff Cancellation: FPU
NITSA Termination Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5144.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–890–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
PowerSouth Long-Term Firm PTP
Agreement Filing to be effective 1/1/
2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5146.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–891–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
PowerSouth NITSA 2019 Rollover
Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5150.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–892–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
PowerSouth Amended and Restated
NITSA Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5154.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–893–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
SEPA Network Agreement Amendment
Filing (Revision Nos. 5 & 6) to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5159.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–894–000.
Applicants: Black Hills Colorado
Electric, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession (OATT) to be
effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5165.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–895–000.
Applicants: Black Hills Colorado
Electric, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession (WestConnect
Point-to-Point) to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5166.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–896–000.
Applicants: Black Hills Colorado
Electric, LLC.
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
Description: § 205(d) Rate Filing:
Notice of Succession (Agreements and
Rate Schedules) to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5167.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–897–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
20190129 Joint Dispatch Agreement_
Black Hills Name Change to be effective
12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5168.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–898–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Alliant Energy Corporate Services, Inc.
Description: § 205(d) Rate Filing:
2019–01–29_SA 2605 Termination of
IPL-City of Guttenberg DAFC to be
effective 3/31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5171.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–899–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Alliant Energy Corporate Services, Inc.
Description: § 205(d) Rate Filing:
2019–01–29_SA 2604 IPL-City of
Guttenberg 1st Rev IFA to be effective 3/
31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5198.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–900–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to Engineering and
Permitting Agrmt with CA High Speed
Rail (RS 247) to be effective 1/30/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5202.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–901–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4184; Queue No. Z2–106 to be effective
12/10/2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5207.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–902–000.
Applicants: Valcour Wind Energy,
LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective 3/15/
2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5214.
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–903–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Alliant Energy Corporate Services, Inc.
Description: § 205(d) Rate Filing:
2019–01–29_SA 2636 IPL–RPGI 1st Rev
DAFC to be effective 3/31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5215.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–904–000.
Applicants: Mulberry Farm, LLC.
Description: Compliance filing:
Compliance Filing—Category 2 Seller to
be effective 3/30/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5001.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–905–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Southern Power (Franklin 3) LGIA
Amendment Filing to be effective 1/1/
2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5006.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–906–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
LGIA Amendments Filing #1 (to
Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5007.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–907–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
LGIA Amendments Filing #2 (to
Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5008.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–908–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
LGIA Amendments Filing #3 (to
Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5009.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–909–000.
Applicants: Georgia Power Company,
Alabama Power Company, Mississippi
Power Company.
Description: Notice of Cancellation of
Umbrella Service Agreements of
Alabama Power Company, et al.
Filed Date: 1/29/19.
Accession Number: 20190129–5240.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
E:\FR\FM\06FEN1.SGM
06FEN1
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–01151 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–902–000]
Dated: January 30, 2019.
Kimberly D. Bose,
Secretary.
amozie on DSK3GDR082PROD with NOTICES1
Valcour Wind Energy, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2019–01147 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Valcour
Wind Energy, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 19,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2669–085]
Bear Swamp Power Company, LLC;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric license application has
been filed with the Commission and is
available for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2669–085.
c. Date filed: March 30, 2018.
d. Applicant: Bear Swamp Power
Company, LLC (Bear Swamp).
e. Name of Project: Bear Swamp
Project.
f. Location: On the Deerfield River, in
Berkshire and Franklin Counties,
Massachusetts. There are no federal or
tribal lands within the project boundary.
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
2213
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Steven P.
Murphy, Director of Licensing,
Brookfield Renewable Energy Group, 33
West 1st Street South, Fulton, NY
13069; Telephone at (315) 593–3118.
i. FERC Contact: Amy Chang, (202)
502–8250 or amy.chang@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2669–085.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The existing Bear Swamp Project
consists of a pumped storage
development, the Bear Swamp Pumped
Storage Development, and a
conventional hydropower development,
the Fife Brook Development, with a
combined authorized capacity of 676
megawatts (MW). The project generates
an average of 483,863 megawatt-hours
(MWh) annually, and uses an average of
618,293 MWh annually to operate the
pumped storage development.
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 84, Number 25 (Wednesday, February 6, 2019)]
[Notices]
[Pages 2211-2213]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01151]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-4507-010.
Applicants: Canastota Windpower, LLC.
Description: Notice of Non-Material Change in Status of Canastota
Windpower, LLC.
Filed Date: 1/29/19.
Accession Number: 20190129-5250.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER14-1421-001.
Applicants: Diamond State Generation Partners, LLC.
Description: Compliance filing: Informational Filing Pursuant to
Schedule 2 of the PJM OATT & Request for Waiver to be effective N/A.
Filed Date: 1/29/19.
Accession Number: 20190129-5186.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18-1934-001.
Applicants: Alabama Power Company.
Description: Compliance filing: OATT Compliance Filing (Relating to
Sale of Gulf Power) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5084.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER18-1938-001.
Applicants: Alabama Power Company.
Description: Compliance filing: Transmission Facility Cost
Allocation Tariff Compliance Filing to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5085.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-256-002.
Applicants: Wisconsin Power and Light Company.
Description: Tariff Amendment: Amendment to WPL Wholesale Formula
Rate Application to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5209.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-257-002.
Applicants: Interstate Power and Light Company.
Description: Tariff Amendment: Amendment to IPL Wholesale Formula
Rate Application to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5212.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-361-000.
Applicants: Midcontinent Independent System Operator, Inc.,
International Transmission Company, Michigan Electric Transmission
Company, LLC, ITC Midwest LLC.
Description: Report Filing: 2019-01-29_Refund Report for ITC
Companies re Transco Adder (EL18-140) to be effective N/A.
Filed Date: 1/29/19.
Accession Number: 20190129-5163.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-541-001.
Applicants: ITC Midwest LLC.
Description: Tariff Amendment: Amendment to Filing of JUA with Jo-
Carroll Energy to be effective 2/11/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5201.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-846-000.
Applicants: Antelope DSR 3, LLC.
Description: Supplement to January 22, 2019 Antelope DSR 3, LLC
tariff filing.
Filed Date: 1/29/19.
Accession Number: 20190129-5239.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19-847-000.
Applicants: San Pablo Raceway, LLC.
Description: Supplement to January 22, 2019 San Pablo Raceway, LLC
tariff filing.
Filed Date: 1/29/19.
Accession Number: 20190129-5243.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19-884-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: DEC-SoCo Amended and
Restated Interconnection Contract Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-886-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: DEF-SoCo Amended and
Restated Interconnection Contract Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5139.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-887-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Filing of Interchange
Contract Amendments (to remove Gulf) to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5141.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-888-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Filing of NITSA Amendments
(to remove Gulf) to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5143.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-889-000.
[[Page 2212]]
Applicants: Alabama Power Company.
Description: Tariff Cancellation: FPU NITSA Termination Filing to
be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5144.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-890-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: PowerSouth Long-Term Firm
PTP Agreement Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5146.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-891-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: PowerSouth NITSA 2019
Rollover Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5150.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-892-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: PowerSouth Amended and
Restated NITSA Filing to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5154.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-893-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: SEPA Network Agreement
Amendment Filing (Revision Nos. 5 & 6) to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5159.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-894-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession (OATT)
to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5165.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-895-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession
(WestConnect Point-to-Point) to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5166.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-896-000.
Applicants: Black Hills Colorado Electric, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession
(Agreements and Rate Schedules) to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5167.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-897-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 20190129 Joint Dispatch
Agreement_Black Hills Name Change to be effective 12/31/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5168.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-898-000.
Applicants: Midcontinent Independent System Operator, Inc., Alliant
Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-29_SA 2605
Termination of IPL-City of Guttenberg DAFC to be effective 3/31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5171.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-899-000.
Applicants: Midcontinent Independent System Operator, Inc., Alliant
Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-29_SA 2604 IPL-City
of Guttenberg 1st Rev IFA to be effective 3/31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5198.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-900-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Amendment to Engineering and
Permitting Agrmt with CA High Speed Rail (RS 247) to be effective 1/30/
2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5202.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-901-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4184; Queue No. Z2-106 to be effective 12/10/2018.
Filed Date: 1/29/19.
Accession Number: 20190129-5207.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-902-000.
Applicants: Valcour Wind Energy, LLC.
Description: Baseline eTariff Filing: MBR Application to be
effective 3/15/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5214.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-903-000.
Applicants: Midcontinent Independent System Operator, Inc., Alliant
Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-29_SA 2636 IPL-RPGI
1st Rev DAFC to be effective 3/31/2019.
Filed Date: 1/29/19.
Accession Number: 20190129-5215.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-904-000.
Applicants: Mulberry Farm, LLC.
Description: Compliance filing: Compliance Filing--Category 2
Seller to be effective 3/30/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5001.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-905-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Southern Power (Franklin 3)
LGIA Amendment Filing to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5006.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-906-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: LGIA Amendments Filing #1
(to Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5007.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-907-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: LGIA Amendments Filing #2
(to Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5008.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-908-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: LGIA Amendments Filing #3
(to Remove Gulf) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130-5009.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19-909-000.
Applicants: Georgia Power Company, Alabama Power Company,
Mississippi Power Company.
Description: Notice of Cancellation of Umbrella Service Agreements
of Alabama Power Company, et al.
Filed Date: 1/29/19.
Accession Number: 20190129-5240.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the Commission's eLibrary system by
[[Page 2213]]
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-01151 Filed 2-5-19; 8:45 am]