Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests; Brookfield White Pine Hydro, LLC, 1722-1723 [2019-00964]
Download as PDF
1722
Federal Register / Vol. 84, No. 24 / Tuesday, February 5, 2019 / Notices
Filed Date: 1/28/19.
Accession Number: 20190128–5149.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–877–000.
Applicants: Commonwealth Edison
Company, Commonwealth Edison
Company of Indiana, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ComEd submits revisions to Letter
Agreement, Service Agreement No. 3747
to be effective 3/29/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5153.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–878–000.
Applicants: Enel Green Power
Hilltopper Wind, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 3/30/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5036.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–879–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Blountstown Long-Term Firm PTP
Agreement Filing to be effective 1/1/
2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5069.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–880–000.
Applicants: Alabama Power
Company.
Description: Tariff Cancellation:
Blountstown NITSA Termination Filing
to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5070.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–881–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Calhoun Power Interconnection
Agreement Amendment Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5075.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–882–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: CER
Generation Interconnection Agreement
Amendment Filing to be effective 1/1/
2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5079.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–883–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
VerDate Sep<11>2014
17:22 Feb 04, 2019
Jkt 247001
4267; Queue No. Z1–091 to be effective
12/15/2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5089.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–13–000.
Applicants: Kingsport Power
Company.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Kingsport Power Company.
Filed Date: 1/28/19.
Accession Number: 20190128–5211.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–00992 Filed 2–4–19; 8:45 am]
BILLING CODE 6717–01–P
operated by Lone Star between Mont
Belvieu, Texas and Nederland, Texas,
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on February 22, 2019.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2019–00962 Filed 2–4–19; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. OR19–17–000]
Notice of Request for Temporary
Waiver; Lone Star NGL Mont Belvieu
LP
Take notice that on January 25, 2019,
Lone Star NGL Mont Belvieu LP (Lone
Star) filed a petition seeking a
temporary waiver of the tariff filing and
reporting requirements of sections 6 and
20 of the Interstate Commerce Act and
parts 341 and 357 of the Commission’s
regulations. This request pertains to
transportation service on certain natural
gas liquids pipeline facilities currently
being developed and to be owned and
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2528–104]
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests;
Brookfield White Pine Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
E:\FR\FM\05FEN1.SGM
05FEN1
Federal Register / Vol. 84, No. 24 / Tuesday, February 5, 2019 / Notices
a. Application Type: Application for
Non-Capacity Amendment of license.
b. Project No: 2528–104.
c. Date Filed: January 4, 2019.
d. Applicant: Brookfield White Pine
Hydro, LLC.
e. Name of Project: Cataract
Hydroelectric Project.
f. Location: The project is located on
the Saco River in the cities of Saco and
Biddeford, York County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kelly Maloney,
License Compliance Manager, 150 Main
Street, Lewiston, ME 04240, (207) 755–
5605 or kelly.maloney@
brookfieldrenewable.com.
i. FERC Contact: Diana Shannon (202)
502–6136 or diana.shannon@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
February 28, 2019.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2528–104.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to remove the existing
hinged flashboards on top of the East
Channel (Cataract) dam spillway and
install 5-foot-high pneumatic crest gates.
A control building would be installed
above the powerhouse intake to house
the associated control equipment.
VerDate Sep<11>2014
17:22 Feb 04, 2019
Jkt 247001
Construction is planned from July to
October 2019. A 1-foot drawdown from
the normal full pond elevation (i.e., 44
feet USGS) is necessary to complete the
work. The drawdown is expected to last
from July through October 2019. No
permanent changes to project
operations, headpond elevation, or
spillway capacity are proposed (after
crest gate construction has been
completed). The licensee provided
documentation of consultation with
resource agencies and stakeholders with
its application.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
1723
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–00964 Filed 2–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–38–000]
Notice of Complaint; City and County
of San Francisco v. Pacific Gas and
Electric Company
Take notice that on January 28, 2019,
City and County of San Francisco (San
Francisco or Complainant) filed a formal
complaint (complaint) against Pacific
Gas and Electric Company (PG&E or
Respondent) pursuant to sections 206,
306, and 309 of the Federal Power Act 1
(FPA) and Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure,2 alleging that PG&E has
violated its open-access Wholesale
Distribution Tariff (WDT) and that it is
implementing its WDT in a manner that
is unjust, unreasonable, and unduly
discriminatory. San Francisco requests
that the Commission (1) direct PG&E to
comply with its Tariff by offering San
Francisco the secondary and primaryplus wholesale distribution service
provided for by the WDT; (2) direct
PG&E to pay refunds to San Francisco
consistent with the filed rate; and (3)
take any such other actions that the
Commission finds necessary or
appropriate to address PG&E’s tariff
violations and to assure that the WDT
and PG&E’s implementation of that
Tariff are just, reasonable, and not
unduly discriminatory, all as more fully
explained in the complaint.
San Francisco certifies that copies of
the complaint were served on contacts
for PG&E as listed on the Commission’s
list of Corporate Officials.
1 16
2 18
E:\FR\FM\05FEN1.SGM
U.S.C. 824e, 825e, and 825h.
CFR 385.206.
05FEN1
Agencies
[Federal Register Volume 84, Number 24 (Tuesday, February 5, 2019)]
[Notices]
[Pages 1722-1723]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-00964]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2528-104]
Notice of Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Protests; Brookfield White Pine
Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
[[Page 1723]]
a. Application Type: Application for Non-Capacity Amendment of
license.
b. Project No: 2528-104.
c. Date Filed: January 4, 2019.
d. Applicant: Brookfield White Pine Hydro, LLC.
e. Name of Project: Cataract Hydroelectric Project.
f. Location: The project is located on the Saco River in the cities
of Saco and Biddeford, York County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kelly Maloney, License Compliance Manager,
150 Main Street, Lewiston, ME 04240, (207) 755-5605 or
kelly.maloney@brookfieldrenewable.com.
i. FERC Contact: Diana Shannon (202) 502-6136 or
diana.shannon@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: February 28, 2019.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2528-104. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee proposes to remove the
existing hinged flashboards on top of the East Channel (Cataract) dam
spillway and install 5-foot-high pneumatic crest gates. A control
building would be installed above the powerhouse intake to house the
associated control equipment. Construction is planned from July to
October 2019. A 1-foot drawdown from the normal full pond elevation
(i.e., 44 feet USGS) is necessary to complete the work. The drawdown is
expected to last from July through October 2019. No permanent changes
to project operations, headpond elevation, or spillway capacity are
proposed (after crest gate construction has been completed). The
licensee provided documentation of consultation with resource agencies
and stakeholders with its application.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-00964 Filed 2-4-19; 8:45 am]