Combined Notice of Filings #1, 1117-1118 [2019-00604]
Download as PDF
Federal Register / Vol. 84, No. 22 / Friday, February 1, 2019 / Notices
or 202–208–1659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
For more information about the EQR
Users Group meeting, please contact Jeff
Sanders of the Commission’s Office of
Enforcement at (202) 502–6455, or send
an email to EQRUsersGroup@ferc.gov.
Dated: January 11, 2019.
Kimberly D. Bose,
Secretary.
AGENDA
EQR Users Group Meeting—Commission
Meeting Room
February 14, 2019
1:00–1:15 p.m.—Welcome, Introductions,
and Logistics
1:15–1:45 p.m.—Updates Since Last Meeting
1:45–2:15 p.m.—Discussion on EQR Product
Fields
2:15–2:45 p.m.—Large Data Files
2:45–3:00 p.m.—Break
3:00–3:30 p.m.—EQR Self-Reports
3:30–4:30 p.m.—EQR Reassessment Project
4:30–5:00 p.m.—Open Discussion
5:00 p.m.—End of Meeting—Closing Remarks
[FR Doc. 2019–00762 Filed 1–31–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–50–000.
Applicants: Frontier Utilities
Northeast LLC, NextEra Energy Services,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Frontier
Utilities Northeast LLC, et al.
Filed Date: 1/25/19.
Accession Number: 20190125–5181.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: EC19–51–000.
Applicants: Bloom Energy
Corporation, Diamond State Generation
Partners, LLC, Yellow Jacket Energy,
LLC, 2014 ESA Project Company, LLC,
2015 ESA Project Company, LLC,
Canada Pension Plan Investment Board.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Bloom
Energy Corporation, et al.
Filed Date: 1/28/19.
Accession Number: 20190128–5109.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
VerDate Sep<11>2014
21:23 Jan 31, 2019
Jkt 247001
Docket Numbers: EG19–52–000.
Applicants: Crystal Lake Wind Energy
I, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy I, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128–5120.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: EG19–53–000.
Applicants: Crystal Lake Wind Energy
II, LLC.
Description: Self-Certification of SelfCertification of Exempt Wholesale
Generator Status of Crystal Lake Wind
Energy II, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128–5121.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–615–003;
ER10–2184–027; ER10–2192–032;
ER10–2178–032; ER11–2014–025;
ER11–2013–025; ER13–1536–016;
ER11–2005–025.
Applicants: Albany Green Energy,
LLC, CER Generation, LLC,
Constellation Energy Commodities
Group Maine, LLC, Constellation
NewEnergy, Inc., Cow Branch Wind
Power, LLC, CR Clearing, LLC, Exelon
Generation Company, LLC, Wind
Capital Holdings, LLC.
Description: Supplement to December
22, 2017 Updated Market Power
Analysis for the Southeast Region of the
Exelon Southeast Entities.
Filed Date: 1/24/19.
Accession Number: 20190124–5212.
Comments Due: 5 p.m. ET 2/7/19.
Docket Numbers: ER17–2386–001.
Applicants: Great Bay Solar I, LLC.
Description: Report Filing: Refund
Report (ER17–2386 and EL18–8) to be
effective N/A.
Filed Date: 1/28/19.
Accession Number: 20190128–5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18–1708–001.
Applicants: Copenhagen Wind Farm,
LLC.
Description: Notice of Non-Material
Change in Status of Copenhagen Wind
Farm, LLC.
Filed Date: 1/24/19.
Accession Number: 20190124–5229.
Comments Due: 5 p.m. ET 2/14/19.
Docket Numbers: ER18–1954–002.
Applicants: Gulf Power Company.
Description: Compliance filing: Notice
of Effective Date & Compliance Filing
(NITSA/NOA) ER18–1954 to be effective
1/1/2019.
Filed Date: 1/25/19.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
1117
Accession Number: 20190125–5141.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER18–2352–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–01–28_Amendment to Real-Time
Buybacks of Spinning and Offline
Supplemental to be effective 2/14/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5041.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–871–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–ETEC Contracting Services
Agreements (Monitor, Op, Dispatch) to
be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5113.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER19–872–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_SA 1925 ITC MidwestInterstate Power and Light 4th Rev DTIA
to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5104.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–873–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Lighthouse EC-Golden Spread
EC Interconnection Agreement to be
effective 1/15/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5108.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–874–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5260; Queue
No. AD1–060 to be effective 1/2/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5119.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–875–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_Cyber Security
Coordination to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5135.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\01FEN1.SGM
01FEN1
1118
Federal Register / Vol. 84, No. 22 / Friday, February 1, 2019 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–00604 Filed 1–31–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: January 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Combined Notice of Filings
[FR Doc. 2019–00605 Filed 1–31–19; 8:45 am]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19–43–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Application of
Transcontinental Gas Pipe Line
Company, LLC under Section 7(b) to
abandon certain firm transportation
services.
Filed Date: 1/11/19.
Accession Number: 20190111–5164.
Comments Due: 5 p.m. ET 2/1/19.
Docket Numbers: RP19–577–000.
Applicants: Big Sandy Pipeline, LLC.
Description: Compliance filing Big
Sandy Fuel Filing effective 3/1/2019.
Filed Date: 1/24/19.
Accession Number: 20190124–5125.
Comments Due: 5 p.m. ET 2/5/19.
Docket Numbers: RP19–578–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—ConEd to Pay Less
#798588 to be effective 1/26/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5033.
Comments Due: 5 p.m. ET 2/6/19.
Docket Numbers: RP19–579–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2019
Subsystem & Pooling Revisions to be
effective 3/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5036.
VerDate Sep<11>2014
21:23 Jan 31, 2019
Comments Due: 5 p.m. ET 2/6/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Jkt 247001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Further information may be found at:
https://www.nyiso.com/
espwg?meetingDate=2019-02-11.
Business Issues Committee Meeting
February 13, 2019, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/business-issuescommittee-bic-?meetingDate=2019-0213.
Operating Committee Meeting
February 14, 2019, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/operatingcommittee-oc-?meetingDate=2019-0214.
Management Committee Meeting
Federal Energy Regulatory
Commission
February 27, 2019, 10:00 a.m.–2:00 p.m.
(EST)
Notice of Commission Staff
Attendance
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/managementcommittee-mc-?meetingDate=2019-0227.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER15–2059.
New York Independent System
Operator, Inc., Docket No. ER17–2327.
New York Independent System
Operator, Inc., Docket No. ER19–528.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc. (NYISO):
Transmission Planning Advisory
Subcommittee and Electric System
Planning Working Group Meeting
February 1, 2019, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/
tpas?meetingDate=2019-02-01.
Electric System Planning Working
Group Meeting
February 11, 2019, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
PO 00000
Frm 00072
Fmt 4703
Sfmt 9990
Dated: January 24, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–00542 Filed 1–31–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 84, Number 22 (Friday, February 1, 2019)]
[Notices]
[Pages 1117-1118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-00604]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-50-000.
Applicants: Frontier Utilities Northeast LLC, NextEra Energy
Services, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Frontier Utilities Northeast LLC, et al.
Filed Date: 1/25/19.
Accession Number: 20190125-5181.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: EC19-51-000.
Applicants: Bloom Energy Corporation, Diamond State Generation
Partners, LLC, Yellow Jacket Energy, LLC, 2014 ESA Project Company,
LLC, 2015 ESA Project Company, LLC, Canada Pension Plan Investment
Board.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Bloom Energy Corporation, et al.
Filed Date: 1/28/19.
Accession Number: 20190128-5109.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-52-000.
Applicants: Crystal Lake Wind Energy I, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Crystal Lake Wind Energy I, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128-5120.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: EG19-53-000.
Applicants: Crystal Lake Wind Energy II, LLC.
Description: Self-Certification of Self-Certification of Exempt
Wholesale Generator Status of Crystal Lake Wind Energy II, LLC.
Filed Date: 1/28/19.
Accession Number: 20190128-5121.
Comments Due: 5 p.m. ET 2/19/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-615-003; ER10-2184-027; ER10-2192-032; ER10-
2178-032; ER11-2014-025; ER11-2013-025; ER13-1536-016; ER11-2005-025.
Applicants: Albany Green Energy, LLC, CER Generation, LLC,
Constellation Energy Commodities Group Maine, LLC, Constellation
NewEnergy, Inc., Cow Branch Wind Power, LLC, CR Clearing, LLC, Exelon
Generation Company, LLC, Wind Capital Holdings, LLC.
Description: Supplement to December 22, 2017 Updated Market Power
Analysis for the Southeast Region of the Exelon Southeast Entities.
Filed Date: 1/24/19.
Accession Number: 20190124-5212.
Comments Due: 5 p.m. ET 2/7/19.
Docket Numbers: ER17-2386-001.
Applicants: Great Bay Solar I, LLC.
Description: Report Filing: Refund Report (ER17-2386 and EL18-8) to
be effective N/A.
Filed Date: 1/28/19.
Accession Number: 20190128-5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18-1708-001.
Applicants: Copenhagen Wind Farm, LLC.
Description: Notice of Non-Material Change in Status of Copenhagen
Wind Farm, LLC.
Filed Date: 1/24/19.
Accession Number: 20190124-5229.
Comments Due: 5 p.m. ET 2/14/19.
Docket Numbers: ER18-1954-002.
Applicants: Gulf Power Company.
Description: Compliance filing: Notice of Effective Date &
Compliance Filing (NITSA/NOA) ER18-1954 to be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125-5141.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER18-2352-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-01-28_Amendment to Real-Time
Buybacks of Spinning and Offline Supplemental to be effective 2/14/
2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5041.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-871-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: SWEPCO-ETEC Contracting
Services Agreements (Monitor, Op, Dispatch) to be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125-5113.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER19-872-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-28_SA 1925 ITC
Midwest-Interstate Power and Light 4th Rev DTIA to be effective 3/30/
2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5104.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-873-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Lighthouse EC-Golden
Spread EC Interconnection Agreement to be effective 1/15/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5108.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-874-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5260;
Queue No. AD1-060 to be effective 1/2/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5119.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19-875-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-01-28_Cyber Security
Coordination to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128-5135.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's
[[Page 1118]]
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-00604 Filed 1-31-19; 8:45 am]
BILLING CODE 6717-01-P