Combined Notice of Filings #1, 705-706 [2019-00523]

Download as PDF 705 Federal Register / Vol. 84, No. 21 / Thursday, January 31, 2019 / Notices FERC–725—CERTIFICATION OF ELECTRIC RELIABILITY ORGANIZATION; PROCEDURES FOR ELECTRIC RELIABILITY STANDARDS—Continued Type of reporting requirement Type of respondent Number of respondents Annual number of responses per respondent Total number of responses Average burden hours & cost ($) per response (rounded) Estimated total annual burden hrs. & cost ($) (rounded) (A) (B) 5 (A) × (B) = (C) (D) (C) × (D) Registered Entities, Sub-Total. ....................................... ........................ ........................ ........................ .............................................. 565,854 hrs.; $45,098,596. Total Burden Hrs. and Cost. ....................................... ........................ ........................ ........................ .............................................. 1,117,730 hrs.; $89,083,113. * Estimated. As indicated in the table, there was a decrease from eight to seven in the number of Regional Entities because the Southwest Power Pool dissolved in 2018. Other changes from previous estimates are based on new data in the proposed NERC 2019 Business Plan and Budget to reflect changes in the number of FTEs (full-time equivalent employees) working in applicable areas. Reviewing the NERC Compliance database, we determined the number of unique U.S. entities is 1,409 (compared to the previous value of 1,446). Lastly, in several instances, the amount of time an FTE devotes to a given function may have been increased or decreased. Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: January 9, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–00452 Filed 1–30–19; 8:45 am] BILLING CODE 6717–01–P amozie on DSK3GDR082PROD with NOTICES1 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–48–000. VerDate Sep<11>2014 20:21 Jan 30, 2019 Jkt 247001 Applicants: American Electric Power Service Corporation, AEP Ohio Transmission Company, Inc. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of American Electric Power Service Corporation, on behalf of affiliate AEP Ohio Transmission Company, Inc. Filed Date: 1/23/19. Accession Number: 20190123–5081. Comments Due: 5 p.m. ET 2/13/19. Docket Numbers: EC19–49–000. Applicants: Oklahoma Gas and Electric Company. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Oklahoma Gas and Electric Company. Filed Date: 1/23/19. Accession Number: 20190123–5082. Comments Due: 5 p.m. ET 2/13/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–50–000. Applicants: Innolith Snook LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Innolith Snook LLC. Filed Date: 1/23/19. Accession Number: 20190123–5070. Comments Due: 5 p.m. ET 2/13/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3307–000. Applicants: NRG Energy Center Dover LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 1/23/19. Accession Number: 20190123–5017. Comments Due: 5 p.m. ET 2/13/19. Docket Numbers: ER17–706–006. Applicants: GridLiance West LLC. Description: Compliance filing: GLW 206 Compliance Filing [EL18–158] to be effective 6/27/2018. Filed Date: 1/22/19. Accession Number: 20190122–5209. Comments Due: 5 p.m. ET 2/12/19. PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 Docket Numbers: ER19–537–001; ER14–608–002; ER16–1644–002; ER17– 1214–001. Applicants: MRP San Joaquin Energy, LLC, High Desert Power Project, LLC, MRP Generation Holdings, LLC, Coso Geothermal Power Holdings, LLC. Description: Supplement to December 13, 2018 Notice of Change in Status of MRP San Joaquin Energy, LLC, et. al. Filed Date: 1/22/19. Accession Number: 20190122–5301. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–840–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Second Revised ISA, SA No. 2136; Queue No. AC1–038/AC2–172 to be effective 12/22/2018. Filed Date: 1/22/19. Accession Number: 20190122–5202. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–841–000. Applicants: Energy Center Dover LLC. Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, Request for Administrative Cancellation & Waivers to be effective 1/23/2019. Filed Date: 1/22/19. Accession Number: 20190122–5203. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–842–000. Applicants: Energy Center Paxton LLC. Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, Request for Administrative Cancellation & Waivers to be effective 1/23/2019. Filed Date: 1/22/19. Accession Number: 20190122–5204. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–843–000. Applicants: Solar Blythe LLC. Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, Request for Administrative Cancellation & Waivers to be effective 1/23/2019. Filed Date: 1/22/19. Accession Number: 20190122–5205. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–844–000. E:\FR\FM\31JAN1.SGM 31JAN1 amozie on DSK3GDR082PROD with NOTICES1 706 Federal Register / Vol. 84, No. 21 / Thursday, January 31, 2019 / Notices Applicants: Solar Roadrunner LLC. Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, Request for Administrative Cancellation & Waivers to be effective 1/23/2019. Filed Date: 1/22/19. Accession Number: 20190122–5206. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–853–000. Applicants: Consolidated Edison Energy, Inc. Description: Request for Additional Cost Recovery of Consolidated Edison Energy, Inc. Filed Date: 1/18/19. Accession Number: 20190118–5210. Comments Due: 5 p.m. ET 2/8/19. Docket Numbers: ER19–854–000. Applicants: Innolith Snook LLC. Description: Baseline eTariff Filing: Innolith Snook LLC MBR Tariff to be effective 1/24/2019. Filed Date: 1/23/19. Accession Number: 20190123–5061. Comments Due: 5 p.m. ET 2/13/19. Docket Numbers: ER19–856–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ComEd submits revisions to Att. H–13 re: Sun-Mountain Hilltop WDC to be effective 1/24/2019. Filed Date: 1/23/19. Accession Number: 20190123–5077. Comments Due: 5 p.m. ET 2/13/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–9–000; ES19– 10–000; ES19–11–000; ES19–12–000. Applicants: Transource Maryland, LLC, Transource Missouri, LLC, Transource Pennsylvania, LLC, Transource West Virginia, LLC. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of Transource Maryland, LLC, et al. Filed Date: 1/22/19. Accession Number: 20190122–5302. Comments Due: 5 p.m. ET 2/12/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Sep<11>2014 20:21 Jan 30, 2019 Jkt 247001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 23, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–00523 Filed 1–30–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1585–014; ER10–1594–014; ER10–1597–007; ER10–1617–014; ER10–1624–007; ER10–1628–014; ER10–1632–016; ER12–60–016; ER16–1148–005; ER16– 733–005. Applicants: Alabama Electric Marketing, LLC, California Electric Marketing, LLC, Kiowa Power Partners, LLC, LQA, LLC, New Mexico Electric Marketing, LLC, Tenaska Energı´a de Mexico, S. de R. L. de C.V., Tenaska Gateway Partners, Ltd., Tenaska Power Management, LLC, Tenaska Power Services Co., Texas Electric Marketing, LLC. Description: Updated Market Power Analysis of the Tenaska SPP MBR Sellers. Filed Date: 12/27/18. Accession Number: 20181227–5143. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER10–2757–007; ER11–3051–003. Applicants: Arlington Valley, LLC, Macho Springs Power I, LLC. Description: Notice of Change in Status of Arlington Valley, LLC, et al. Filed Date: 12/27/18. Accession Number: 20181227–5136. Comments Due: 5 p.m. ET 1/17/19. Docket Numbers: ER10–2794–026; ER12–1825–024; ER14–2672–011. Applicants: EDF Trading North America, LLC, EDF Energy Services, LLC, EDF Industrial Power Services (CA), LLC. Description: Updated Market Power Analysis for the SPP Region of the EDF Sellers. Filed Date: 12/27/18. Accession Number: 20181227–5171. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER10–3063–002. Applicants: Green Country Energy, LLC. PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 Description: Triennial Market Power Update for the SPP Region of Green Country Energy, LLC. Filed Date: 12/27/18. Accession Number: 20181227–5172. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER15–2131–005; ER15–2130–005; ER15–2129–005; ER12–2037–012; ER12–2314–008. Applicants: Spinning Spur Wind LLC, Spearville 3, LLC, Slate Creek Wind Project, LLC, Roosevelt Wind Project, LLC, Milo Wind Project, LLC. Description: Triennial Market Power Update for the SPP Region of the EDFR SPP Sellers. Filed Date: 12/26/18. Accession Number: 20181226–5182. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER16–2360–006. Applicants: Great Western Wind Energy, LLC. Description: Market-Based Triennial Review Filing: 2018 Triennial Market Power Update for the SPP Region— Great Western Wind to be effective 2/ 25/2019. Filed Date: 12/26/18. Accession Number: 20181226–5171. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER17–2258–003. Applicants: Rock Falls Wind Farm LLC. Description: Triennial Market Power Update for the Southwest Region of Tucson Electric Power Company, et al. Filed Date: 12/26/18. Accession Number: 20181226–5172. Comments Due: 5 p.m. ET 2/25/19. Docket Numbers: ER19–463–001. Applicants: Duke Energy Progress, LLC. Description: Tariff Amendment: DEC– DEP State ADIT Errata Filing to be effective 1/1/2019. Filed Date: 12/27/18. Accession Number: 20181227–5026. Comments Due: 5 p.m. ET 1/17/19. Docket Numbers: ER19–688–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended and Restated Agreement for Interconnection Service Harbor Cogeneration to be effective 12/21/2018. Filed Date: 12/26/18. Accession Number: 20181226–5173. Comments Due: 5 p.m. ET 1/16/19. Docket Numbers: ER19–689–000. Applicants: The Connecticut Light and Power Company. Description: Initial rate filing: Clear River Energy LLC Related Facilities Agreement to be effective 2/26/2019. Filed Date: 12/27/18. Accession Number: 20181227–5087. Comments Due: 5 p.m. ET 1/17/19. E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 84, Number 21 (Thursday, January 31, 2019)]
[Notices]
[Pages 705-706]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-00523]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-48-000.
    Applicants: American Electric Power Service Corporation, AEP Ohio 
Transmission Company, Inc.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of American Electric Power Service 
Corporation, on behalf of affiliate AEP Ohio Transmission Company, Inc.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5081.
    Comments Due: 5 p.m. ET 2/13/19.

    Docket Numbers: EC19-49-000.
    Applicants: Oklahoma Gas and Electric Company.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of Oklahoma Gas and Electric Company.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5082.
    Comments Due: 5 p.m. ET 2/13/19.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-50-000.
    Applicants: Innolith Snook LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Innolith Snook LLC.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5070.
    Comments Due: 5 p.m. ET 2/13/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-3307-000.
    Applicants: NRG Energy Center Dover LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5017.
    Comments Due: 5 p.m. ET 2/13/19.

    Docket Numbers: ER17-706-006.
    Applicants: GridLiance West LLC.
    Description: Compliance filing: GLW 206 Compliance Filing [EL18-
158] to be effective 6/27/2018.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5209.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-537-001; ER14-608-002; ER16-1644-002; ER17-
1214-001.
    Applicants: MRP San Joaquin Energy, LLC, High Desert Power Project, 
LLC, MRP Generation Holdings, LLC, Coso Geothermal Power Holdings, LLC.
    Description: Supplement to December 13, 2018 Notice of Change in 
Status of MRP San Joaquin Energy, LLC, et. al.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5301.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-840-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Second Revised ISA, SA No. 
2136; Queue No. AC1-038/AC2-172 to be effective 12/22/2018.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5202.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-841-000.
    Applicants: Energy Center Dover LLC.
    Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, 
Request for Administrative Cancellation & Waivers to be effective 1/23/
2019.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5203.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-842-000.
    Applicants: Energy Center Paxton LLC.
    Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, 
Request for Administrative Cancellation & Waivers to be effective 1/23/
2019.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5204.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-843-000.
    Applicants: Solar Blythe LLC.
    Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, 
Request for Administrative Cancellation & Waivers to be effective 1/23/
2019.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5205.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-844-000.

[[Page 706]]

    Applicants: Solar Roadrunner LLC.
    Description: Baseline eTariff Filing: Baseline MBR Tariff Refiling, 
Request for Administrative Cancellation & Waivers to be effective 1/23/
2019.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5206.
    Comments Due: 5 p.m. ET 2/12/19.

    Docket Numbers: ER19-853-000.
    Applicants: Consolidated Edison Energy, Inc.
    Description: Request for Additional Cost Recovery of Consolidated 
Edison Energy, Inc.
    Filed Date: 1/18/19.
    Accession Number: 20190118-5210.
    Comments Due: 5 p.m. ET 2/8/19.

    Docket Numbers: ER19-854-000.
    Applicants: Innolith Snook LLC.
    Description: Baseline eTariff Filing: Innolith Snook LLC MBR Tariff 
to be effective 1/24/2019.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5061.
    Comments Due: 5 p.m. ET 2/13/19.

    Docket Numbers: ER19-856-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: ComEd submits revisions to 
Att. H-13 re: Sun-Mountain Hilltop WDC to be effective 1/24/2019.
    Filed Date: 1/23/19.
    Accession Number: 20190123-5077.
    Comments Due: 5 p.m. ET 2/13/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-9-000; ES19-10-000; ES19-11-000; ES19-12-000.
    Applicants: Transource Maryland, LLC, Transource Missouri, LLC, 
Transource Pennsylvania, LLC, Transource West Virginia, LLC.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Transource Maryland, LLC, et 
al.
    Filed Date: 1/22/19.
    Accession Number: 20190122-5302.
    Comments Due: 5 p.m. ET 2/12/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-00523 Filed 1-30-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.