Information Collection: Disposal of High-Level Radioactive Wastes in Geologic Repositories, 821-822 [2019-00382]

Download as PDF Federal Register / Vol. 84, No. 21 / Thursday, January 31, 2019 / Notices III. Specific Requests for Comments The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the estimate of the burden of the information collection accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated at Rockville, Maryland, this 3rd day of January 2019. For the Nuclear Regulatory Commission. David C. Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2019–00383 Filed 1–30–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–382; NRC–2018–0021] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal by applicant. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Entergy Operations, Inc. (Entergy, the licensee), to withdraw its application dated December 6, 2017, as supplemented by letter dated June 29, 2018, for a proposed amendment to the Waterford Steam Electric Station, Unit 3 (Waterford 3), Facility Operating License No. 50–382. The proposed amendment would have revised the Waterford 3 Technical Specifications (TS) 3/4.3.2 Table 4.3–2, ‘‘Engineered Safety Features Actuation System [ESFAS] Instrumentation Surveillance Requirements.’’ Specifically, the proposed amendment would have removed Note 3 of the table, the exemption from testing ESFAS relays K114, K305, and K313 at power. DATES: January 31, 2019. ADDRESSES: Please refer to Docket ID NRC–2018–0021 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: amozie on DSK3GDR082PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 20:21 Jan 30, 2019 Jkt 247001 • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0021. Address questions about Docket IDs in Regulations.gov to Krupskaya Castellon; telephone: 301–287–9221; email: Krupskaya.Castellon@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: April L. Pulvirenti, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 1390, email: April.Pulvirenti@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of Entergy to withdraw its application dated December 6, 2017 (ADAMS Accession No. ML17340B321), as supplemented by letter dated June 29, 2018 (ADAMS Accession No. ML18180A271), for a proposed amendment to Facility Operating License No. NPF–38 for the Waterford Steam Electric Station, Unit 3, located in St. Charles Parish, Louisiana. The proposed amendment would have revised TS 3/4.3.2 Table 4.3–2, ‘‘Engineered Safety Features Actuation System Instrumentation Surveillance Requirements.’’ The amendment would have removed from Note 3 of the table, the exemption from testing ESFAS relays K114, K305, and K313 at power. Implementation of the amendment would have required a modification to plant circuitry to allow testing for these relays while at power. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on February 13, 2018 PO 00000 Frm 00176 Fmt 4703 Sfmt 4703 821 (83 FR 6222). However, by letter dated December 20, 2018 (ADAMS Accession No. ML18354B283), the licensee requested to withdraw the proposed amendment. Dated at Rockville, Maryland, this 24th day of January 2019. For the Nuclear Regulatory Commission. April L Pulvirenti, Project Manager, Plant Licensing Branch IV, Division of Operator Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2019–00390 Filed 1–30–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2018–0240] Information Collection: Disposal of High-Level Radioactive Wastes in Geologic Repositories Nuclear Regulatory Commission. ACTION: Renewal of existing information collection; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ‘‘Disposal of High-Level Radioactive Wastes in Geologic Repositories.’’ DATES: Submit comments by April 1, 2019. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0240. Address questions about dockets in Regulations.gov to Krupskaya Castellon; telephone: 301–287–9221; email: Krupskaya.Castellon@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: David Cullison, Office of the Chief Information Officer, Mail Stop: T–2 F43, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. SUMMARY: E:\FR\FM\31JAN1.SGM 31JAN1 822 Federal Register / Vol. 84, No. 21 / Thursday, January 31, 2019 / Notices FOR FURTHER INFORMATION CONTACT: David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2084; email: Infocollects.Resource@ nrc.gov. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments amozie on DSK3GDR082PROD with NOTICES1 A. Obtaining Information Please refer to Docket ID NRC–2018– 0240 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0240. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Document collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The supporting statement is available in ADAMS under Accession No. ML18255A345. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting NRC’s Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2084; email: Infocollects.Resource@ nrc.gov. B. Submitting Comments Please include Docket ID NRC–2018– 0240 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https:// www.regulations.gov as well as enter the comment submissions into ADAMS, and the NRC does not routinely edit VerDate Sep<11>2014 20:21 Jan 30, 2019 Jkt 247001 comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the NRC is requesting public comment on its intention to request the OMB’s approval for the information collection summarized below. 1. The title of the information collection: Title 10 of the Code of Federal Regulations (CFR) part 60, ‘‘Disposal of High-Level Radioactive Wastes in Geologic Repositories.’’ 2. OMB approval number: 3150–0127. 3. Type of submission: Extension. 4. The form number, if applicable: Not applicable. 5. How often the collection is required or requested: The information need only be submitted one time. 6. Who will be required or asked to respond: State or Indian Tribes, or their representatives, requesting consultation with the NRC staff regarding review of a potential high-level radioactive waste geologic repository site, or wishing to participate in a license application review for a potential geologic repository (other than a potential geologic repository site at Yucca Mountain, Nevada, which is regulated under 10 CFR part 63). 7. The estimated number of annual responses: 6; however, none are expected in the next three years. 8. The estimated number of annual respondents: 6; however, none are expected in the next three years. 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 726, however, none are expected in the next three years. 10. Abstract: Part 60 of 10 CFR requires States and Indian Tribes to submit certain information to the NRC if they request consultation with the NRC staff concerning the review of a potential repository site, or wish to participate in a license application review for a potential repository (other than the Yucca Mountain, Nevada site, which is regulated under 10 CFR part PO 00000 Frm 00177 Fmt 4703 Sfmt 4703 63). States and Indian Tribes are required to submit information regarding requests for consultation with the NRC and participation in the review of a site characterization plan and/or license application, but only if they wish to obtain NRC consultation services and/or participate in the reviews. The information submitted by the States and Indian Tribes is used by the Director of the Office of Nuclear Material Safety and Safeguards as a basis for decisions about the commitment of NRC staff resources to the consultation and participation efforts. The NRC anticipates conducting a public rulemaking to revise portions of 10 CFR part 60 in the future. If, as part of this rulemaking, revisions are made affecting the information collection requirements, the NRC will follow OMB requirements for obtaining approval for any revised information collection requirements. [Note: All of the information collection requirements pertaining to Yucca Mountain were included in 10 CFR part 63, and were approved by OMB under control number 3150–0199. The Yucca Mountain site is regulated under 10 CFR part 63 (66 FR 55792, November 2, 2001).] III. Specific Requests for Comments The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the estimate of the burden of the information collection accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated at Rockville, Maryland, this 16th day of January 2019. For the Nuclear Regulatory Commission. David C. Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2019–00382 Filed 1–30–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2019–0001] Sunshine Act Meetings Weeks of January 7, 14, 21, 28, February 4, 11, 2019. TIME AND DATE: E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 84, Number 21 (Thursday, January 31, 2019)]
[Notices]
[Pages 821-822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-00382]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2018-0240]


Information Collection: Disposal of High-Level Radioactive Wastes 
in Geologic Repositories

AGENCY: Nuclear Regulatory Commission.

ACTION: Renewal of existing information collection; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) invites public 
comment on the renewal of Office of Management and Budget (OMB) 
approval for an existing collection of information. The information 
collection is entitled, ``Disposal of High-Level Radioactive Wastes in 
Geologic Repositories.''

DATES: Submit comments by April 1, 2019. Comments received after this 
date will be considered if it is practical to do so, but the Commission 
is able to ensure consideration only for comments received on or before 
this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0240. Address 
questions about dockets in Regulations.gov to Krupskaya Castellon; 
telephone: 301-287-9221; email: Krupskaya.Castellon@nrc.gov. For 
technical questions, contact the individual listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     Mail comments to: David Cullison, Office of the Chief 
Information Officer, Mail Stop: T-2 F43, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

[[Page 822]]


FOR FURTHER INFORMATION CONTACT: David Cullison, Office of the Chief 
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2084; email: 
Infocollects.Resource@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0240 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0240.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Document collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, contact the NRC's Public Document 
Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email 
to pdr.resource@nrc.gov. The supporting statement is available in ADAMS 
under Accession No. ML18255A345.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     NRC's Clearance Officer: A copy of the collection of 
information and related instructions may be obtained without charge by 
contacting NRC's Clearance Officer, David Cullison, Office of the Chief 
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2084; email: 
Infocollects.Resource@nrc.gov.

B. Submitting Comments

    Please include Docket ID NRC-2018-0240 in the subject line of your 
comment submission, in order to ensure that the NRC is able to make 
your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed in your comment submission. The NRC will post all comment 
submissions at https://www.regulations.gov as well as enter the comment 
submissions into ADAMS, and the NRC does not routinely edit comment 
submissions to remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 
Chapter 35), the NRC is requesting public comment on its intention to 
request the OMB's approval for the information collection summarized 
below.
    1. The title of the information collection: Title 10 of the Code of 
Federal Regulations (CFR) part 60, ``Disposal of High-Level Radioactive 
Wastes in Geologic Repositories.''
    2. OMB approval number: 3150-0127.
    3. Type of submission: Extension.
    4. The form number, if applicable: Not applicable.
    5. How often the collection is required or requested: The 
information need only be submitted one time.
    6. Who will be required or asked to respond: State or Indian 
Tribes, or their representatives, requesting consultation with the NRC 
staff regarding review of a potential high-level radioactive waste 
geologic repository site, or wishing to participate in a license 
application review for a potential geologic repository (other than a 
potential geologic repository site at Yucca Mountain, Nevada, which is 
regulated under 10 CFR part 63).
    7. The estimated number of annual responses: 6; however, none are 
expected in the next three years.
    8. The estimated number of annual respondents: 6; however, none are 
expected in the next three years.
    9. The estimated number of hours needed annually to comply with the 
information collection requirement or request: 726, however, none are 
expected in the next three years.
    10. Abstract: Part 60 of 10 CFR requires States and Indian Tribes 
to submit certain information to the NRC if they request consultation 
with the NRC staff concerning the review of a potential repository 
site, or wish to participate in a license application review for a 
potential repository (other than the Yucca Mountain, Nevada site, which 
is regulated under 10 CFR part 63). States and Indian Tribes are 
required to submit information regarding requests for consultation with 
the NRC and participation in the review of a site characterization plan 
and/or license application, but only if they wish to obtain NRC 
consultation services and/or participate in the reviews. The 
information submitted by the States and Indian Tribes is used by the 
Director of the Office of Nuclear Material Safety and Safeguards as a 
basis for decisions about the commitment of NRC staff resources to the 
consultation and participation efforts. The NRC anticipates conducting 
a public rulemaking to revise portions of 10 CFR part 60 in the future. 
If, as part of this rulemaking, revisions are made affecting the 
information collection requirements, the NRC will follow OMB 
requirements for obtaining approval for any revised information 
collection requirements. [Note: All of the information collection 
requirements pertaining to Yucca Mountain were included in 10 CFR part 
63, and were approved by OMB under control number 3150-0199. The Yucca 
Mountain site is regulated under 10 CFR part 63 (66 FR 55792, November 
2, 2001).]

III. Specific Requests for Comments

    The NRC is seeking comments that address the following questions:
    1. Is the proposed collection of information necessary for the NRC 
to properly perform its functions? Does the information have practical 
utility?
    2. Is the estimate of the burden of the information collection 
accurate?
    3. Is there a way to enhance the quality, utility, and clarity of 
the information to be collected?
    4. How can the burden of the information collection on respondents 
be minimized, including the use of automated collection techniques or 
other forms of information technology?

    Dated at Rockville, Maryland, this 16th day of January 2019.

    For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2019-00382 Filed 1-30-19; 8:45 am]
 BILLING CODE 7590-01-P