2018 – Federal Register Recent Federal Regulation Documents
Results 2,251 - 2,300 of 27,748
Proposed Agency Information Collection Activities; Comment Request
The Board of Governors of the Federal Reserve System (Board) invites comment on a proposal to extend for three years, without revision, the Domestic Branch Notification (FR 4001; OMB No. 7100- 0097).
Registration Review; Draft Human Health and/or Ecological Risk Assessments for Several Pesticides; Notice of Availability
This notice announces the availability of EPA's draft human health and ecological risk assessments for the registration review of amitraz, bispyribac-sodium, bromoxynil, captan, chloropicrin, dazomet, diclosulam, florasulam, flucarbazone-sodium, fluroxypyr, formetanate, imazalil, imazamox, imazapic, imazaquin, imazethapyr, MCPA, metam sodium, metam potassium, methyl isothiocyanate (MITC), o-benzyl-p- chlorophenol, starlicide, tri-n butyl tetradecyl phosphonium chloride (TTPC), triphenyltin hydroxide (TPTH), and zinc salts. This notice also announces the availability of EPA's draft human health risk assessments for the registration review of para-dichlorobenzene and penoxsulam.
Notice of Orders Issued Under Section 3 of the Natural Gas Act During October 2018
The Office of Fossil Energy (FE) of the Department of Energy gives notice that during October 2018, it issued orders granting authority to import and export natural gas, to import and export liquefied natural gas (LNG), and vacating prior authorization. These orders are summarized in the attached appendix and may be found on the FE website at https://www.energy.gov/fe/listing- doefe-authorizationsorders-issued-2018-0. They are also available for inspection and copying in the U.S. Department of Energy (FE-34), Division of Natural Gas Regulation, Office of Regulation, Analysis, and Engagement, Office of Fossil Energy, Docket Room 3E-033, Forrestal Building, 1000 Independence Avenue SW, Washington, DC 20585, (202) 586-9478. The Docket Room is open between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday, except Federal holidays.
TSCA Science Advisory Committee on Chemicals (SACC); Notice of Public Meetings
This notice announces the peer review of the draft Risk Evaluation for Colour Index (C.I.) Pigment Violet 29 (PV29) and associated documents developed under EPA's existing chemical substance process under the Toxic Substances Control Act (TSCA). The peer review panel deliberations will be conducted during a 4-day, in-person, public meeting of the TSCA Science Advisory Committee on Chemicals (SACC). This in-person meeting will also include a general TSCA orientation for the TSCA SACC. A portion of the in-person meeting will be closed to the public for the committee's discussion of information claimed as confidential business information (CBI). Prior to the in-person meeting, there will be a public, 2-hour preparatory virtual meeting to consider the scope and clarity of the draft charge questions for this peer review. During these upcoming meetings, the public is invited to provide oral comments for the peer review on the draft risk evaluation for PV29 and related documents. Comments on the draft charge questions will be accepted prior to and during the 2-hour preparatory virtual meeting. The TSCA SACC peer review panel will consider these comments during their discussions.
Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces
In this action, the EPA proposes to amend the 2015 New Source Performance Standards (NSPS) for new residential hydronic heaters and new forced-air furnaces by adding a two-year ``sell-through'' period for all affected new hydronic heaters and forced-air furnaces that are manufactured or imported before the May 2020 compliance date to be sold at retail through May 2022. This will allow retailers additional time, after the May 2020 effective date of the ``Step 2'' standards, for the sale of ``Step 1'' compliant hydronic heaters and forced-air furnaces remaining in inventory. The EPA is also taking comment on whether a sell-through period for all affected new residential wood heaters is appropriate following the May 2020 compliance date and, if so, how long a sell-through period is needed and why. In addition, this action is taking comment on whether the current minimum pellet fuel requirements should be retained and, if so, whether they should be revised.
Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces
In this action, the Environmental Protection Agency (EPA) is soliciting comment on several aspects of the 2015 Standards of Performance for New Residential Wood Heaters, New Residential Hydronic Heaters and Forced-Air Furnaces (2015 NSPS) in order to inform future rulemaking to improve these standards and related test methods. This action does not propose any changes to the 2015 NSPS, but does take comment on a number of aspects of the rule, including the compliance date for the Step 2 emission limits, Step 2 emission limits for forced- air furnaces, hydronic heaters and wood heaters, Step 2 emission limits based on weighted averages versus individual burn rates, transitioning to cord wood certification test methods, compliance audit testing, third-party review, electronic reporting tool, and warranty requirements.
Information Collection Request Submitted To OMB for Review and Approval; Comment Request; NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (EPA ICR No. 2028.09, OMB Control No. 2060-0551), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017, during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Meeting of the Advisory Commission on Childhood Vaccines
The Advisory Commission on Childhood Vaccines (ACCV) has scheduled a public meeting. Information about the ACCV and the agenda for this meeting can be found on the ACCV website at: https:// www.hrsa.gov/advisorycommittees/childhoodvaccines/. This notice is being published less than 15 days prior to the meeting date due to unexpected administrative delays.
Medicare Program: Changes to Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Correction
This document corrects an error that appeared in the final rule with comment period published in the Federal Register on November 21, 2018, entitled ``Medicare Program: Changes to Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs.'' Specifically, this document corrects the public comment period end date. The corrected date is January 2, 2019.
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Form ETA-9142-B-CAA-2, Attestation for Employers Seeking To Employ H-2B Nonimmigrant Workers Under Section 205 of Division M of the Consolidated Appropriations Act, 2018 Public Law 115-141
The Department of Labor (DOL or Department) is submitting the Employment and Training Administration (ETA) sponsored Information Collection Request (ICR), titled, ``Attestation for Employers Seeking to Employ H-2B Nonimmigrant Workers Under Section 205 of Division M of the Consolidated Appropriations Act, 2018 Public Law 115-141 (March 23, 2018),'' to the Office of Management and Budget (OMB) for review and approval for continued use in accordance with the Paperwork Reduction Act (PRA) of 1995. Public comments on the ICR are invited.
Notice of OFAC Sanctions Actions
The Department of the Treasury's Office of Foreign Assets Control (OFAC) is publishing the names of one or more persons that have been placed on OFAC's Specially Designated Nationals and Blocked Persons List based on OFAC's determination that one or more applicable legal criteria were satisfied. All property and interests in property subject to U.S. jurisdiction of these persons are blocked, and U.S. persons are generally prohibited from engaging in transactions with them.
Notice of Availability of the Draft Environmental Impact Statement for the Sevier Playa Potash Project, Utah
In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Federal Land Policy and Management Act of 1976, as amended, the Mineral Leasing Act of 1920, as amended, and Secretarial Order 3355, the Bureau of Land Management (BLM) is releasing the Draft Environmental Impact Statement (EIS) for Crystal Peak Minerals Inc.'s (CPM) Sevier Playa Potash Project (Project), and by this notice is announcing the opening of the comment period.
Office of Commercial Space Transportation: Notice of Availability and Request for Comment on the Draft Environmental Assessment for Issuing SpaceX a Launch License for an In-Flight Dragon Abort Test, Kennedy Space Center, Brevard County, Florida
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), Council on Environmental Quality NEPA implementing regulations, and FAA Order 1050.1F, Environmental Impacts: Policies and Procedures, the FAA is announcing the availability of and requesting comment on the Draft Environmental Assessment for Issuing SpaceX a Launch License for an In-flight Dragon Abort Test, Kennedy Space Center, Brevard County, Florida (Draft EA).
Approval and Promulgation of Implementation Plans; Arkansas; Approval of Regional Haze State Implementation Plan Revision and Partial Withdrawal of Federal Implementation Plan
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is proposing to approve a portion of the revision to the Arkansas State Implementation Plan (SIP) that addresses certain requirements of the CAA and the EPA's regional haze rules for the protection of visibility in mandatory Class I Federal areas (Class I areas) for the first implementation period. The EPA is proposing to approve the portions of the SIP revision addressing the best available retrofit technology (BART) requirements for sulfur dioxide (SO2), particulate matter (PM) and nitrogen oxide (NOX) for seven electric generating units (EGUs) in Arkansas. The EPA is also proposing to approve the determination that no additional controls at any Arkansas sources are necessary under reasonable progress; calculation of the revised reasonable progress goals (RPGs) for Arkansas' Class I areas; certain components of the long-term strategy for making reasonable progress; the clarification that both the 6A and 9A Boilers at the Georgia-Pacific Crossett Mill are BART-eligible; and the additional information and technical analysis in support of the determination that the Georgia-Pacific Crossett Mill 6A and 9A Boilers are not subject to BART. In conjunction with our proposed approval of portions of the SIP revision, we are proposing to withdraw the corresponding federal implementation plan (FIP) provisions established in a prior action to address regional haze requirements for Arkansas.
Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Georges Bank Cod Trip Limit Adjustment for the Common Pool Fishery
This action adjusts the possession and trip limits of Georges Bank cod for Northeast multispecies common pool vessels for the remainder of the 2018 fishing year, in order to ensure that the common pool fishery is able to harvest, but not exceed, its annual quota for the stock. These changes are intended to provide the common pool fishery with additional fishing opportunities.
Airworthiness Directives; Leonardo S.p.A. (Type Certificate Previously Held by Finmeccanica S.p.A. and AgustaWestland S.p.A.) Helicopters
We are adopting a new airworthiness directive (AD) for Leonardo S.p.A. (Leonardo) Model AW189 helicopters. This AD requires replacing the tail plane lower fitting with an improved tail plane lower fitting. This AD was prompted by reports of cracks on the tail plane fittings of Model AW189 helicopters. The actions of this AD are intended to correct an unsafe condition on these products.
Meeting of the Regional Energy Resource Council
The TVA Regional Energy Resource Council (RERC) will hold a meeting on Tuesday, December 18, 2018, to discuss the metrics and evaluation criteria that TVA is establishing for the 2019 Integrated Resource Plan (IRP). The RERC was established to advise TVA on its energy resource activities and the priority to be placed among competing objectives and values. Notice of this meeting is given under the Federal Advisory Committee Act (FACA).
Environmental Impact Statement; Cattle Fever Tick Control Barrier in South Texas: Record of Decision
This notice advises the public of the Animal and Plant Health Inspection Service's record of decision for the final environmental impact statement titled ``Cattle Fever Tick Eradication ProgramTick Control Barrier: Maverick, Starr, Webb, and Zapata Counties, Texas.''
Procurement List; Additions and Deletions
This action adds services to the Procurement List that will be provided by nonprofit agencies employing persons who are blind or have other severe disabilities, and deletes products and services from the Procurement List previously furnished by such agencies.
Procurement List; Proposed Deletions
The Committee is proposing to delete a product and services from the Procurement List that was previously furnished by nonprofit agencies employing persons who are blind or have other severe disabilities.
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Multiple Bureau of the Fiscal Service Information Collection Requests
The Department of the Treasury will submit the following information collection requests to the Office of Management and Budget (OMB) for review and clearance in accordance with the Paperwork Reduction Act of 1995, on or after the date of publication of this notice. The public is invited to submit comments on these requests.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2016 Chevrolet Equinox Multipurpose Passenger Vehicles Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2016 Chevrolet Equinox multipurpose passenger vehicles (MPVs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS), are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and were certified by their manufacturer as complying with the safety standards (the U.S.-certified 2016 Chevrolet Equinox MPVs) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2015 Ferrari 458 Speciale Aperta Passenger Cars Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2015 Ferrari 458 Speciale Aperta Passenger Cars (PCs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS) are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and that were certified by their manufacturer as complying with the safety standards (the U.S.-certified version of the MY 2015 Ferrari 458 Speciale Aperta PCs) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2016 Mercedes-Benz GL500 Multipurpose Passenger Vehicles Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2016 Mercedes-Benz GL500 multipurpose passenger vehicles (MPVs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS), are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and were certified by their manufacturer as complying with the safety standards (the U.S.-certified 2016 Mercedes-Benz GL550 MPV) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2005 Chevrolet Corvette Passenger Cars Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2005 Chevrolet Corvette passenger cars (PCs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS) are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and that were certified by their manufacturer as complying with the safety standards (the U.S.- certified version of the MY 2005 Chevrolet Corvette PCs) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Certain Nonconforming Model Year 2011 Mercedes-Benz GL550 Multipurpose Passenger Vehicles Originally Certified to the Canadian Motor Vehicle Safety Standards Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2011 Mercedes-Benz GL550 multipurpose passenger vehicles (MPVs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS), but that are certified by their original manufacturer as complying with all applicable Canadian motor vehicle safety standards (CMVSS), are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and that were certified by their manufacturer as complying with the safety standards (the U.S.-certified 2011 Mercedes-Benz GL550 MPVs and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2015 Chevrolet Silverado Trucks Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2015 Chevrolet Silverado trucks that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS), are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and were certified by their manufacturer as complying with the safety standards (the U.S.-certified 2015 Chevrolet Silverado trucks) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision That Nonconforming Model Year 2008 Jeep Grand Cherokee Multipurpose Passenger Vehicles Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2008 Jeep Grand Cherokee multipurpose passenger vehicles (MPVs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS), are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and that were certified by their manufacturer as complying with the safety standards (the U.S.-certified 2008 Jeep Grand Cherokee MPV) and are capable of being readily altered to conform to the standards.
Notice of Receipt of Petition for Decision that Nonconforming Model Year 2015 Bentley Continental Passenger Cars Are Eligible for Importation
This document announces receipt by the National Highway Traffic Safety Administration (NHTSA) of a petition for a decision that certain model year (MY) 2015 Bentley Continental passenger cars (PCs) that were not originally manufactured to comply with all applicable Federal motor vehicle safety standards (FMVSS) are eligible for importation into the United States because they are substantially similar to vehicles that were originally manufactured for sale in the United States and were certified by their manufacturer as complying with the safety standards (the U.S.-certified version of the MY 2015 Bentley Continental PCs) and are capable of being readily altered to conform to the standards.
Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Industrial Minerals Surveys
In accordance with the Paperwork Reduction Act of 1995, the U.S. Geological Survey is proposing to renew an information collection.
Agency Information Collection Activities: Proposed Collection; Comment Request
The Centers for Medicare & Medicaid Services (CMS) is announcing an opportunity for the public to comment on CMS' intention to collect information from the public. Under the Paperwork Reduction Act of 1995 (the PRA), federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information (including each proposed extension or reinstatement of an existing collection of information) and to allow 60 days for public comment on the proposed action. Interested persons are invited to send comments regarding our burden estimates or any other aspect of this collection of information, including the necessity and utility of the proposed information collection for the proper performance of the agency's functions, the accuracy of the estimated burden, ways to enhance the quality, utility, and clarity of the information to be collected, and the use of automated collection techniques or other forms of information technology to minimize the information collection burden.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Albemarle and Chesapeake Canal, Chesapeake, VA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the S168/Great Bridge bridge. This bridge carries SR168 (Battlefield Boulevard South) over the Atlantic Intracoastal Waterway (AICW), Albemarle and Chesapeake Canal, mile 12.0, at Chesapeake, VA. The deviation is necessary to facilitate the Annual Chesapeake Rotary Christmas Parade. This deviation allows the bridge to remain in the closed-to-navigation position.
Recurring Safety Zone; Steelers Fireworks, Pittsburgh, PA
The Coast Guard will enforce the safety zone for the Pittsburgh Steelers Fireworks to provide for the safety of persons, vessels, and the marine environment on the navigable waters of the Allegheny, Ohio, and Monongahela Rivers during this event. Our regulation for marine events within the Eighth Coast Guard District identifies the regulated area for this event in Pittsburgh, PA. During the enforcement periods, entry into this zone is prohibited unless authorized by the Captain of the Port Marine Safety Unit Pittsburgh or a designated representative.
Magnuson-Stevens Act Provisions; General Provisions for Domestic Fisheries; Pacific Coast Groundfish Fishery; Application for an Exempted Fishing Permit
NMFS announces the receipt of an exempted fishing permit application titled, ``Year-round Coastwide Midwater Rockfish EFP: Monitoring and Minimizing Salmon Bycatch When Targeting Rockfish in the Shorebased IFQ Fishery.'' The application, submitted by the West Coast Seafood Processors Association, Environmental Defense Fund, Oregon Trawl Commission, and Midwater Trawlers Cooperative, requests a permit to test whether removing certain gear, time, and area restrictions for vessels fishing under the Trawl Rationalization Program's Shorebased Individual Fishing Quota Program may impact the nature and extent of bycatch of prohibited species (e.g., Chinook salmon). This exempted fishing permit would allow participating groundfish bottom and midwater trawl vessels more flexibility than allowed in current regulations to target pelagic rockfish species, such as widow, chilipepper, and yellowtail rockfish. Regulations under the Magnuson-Stevens Fishery Conservation and Management Act require publication of this notification to provide interested parties the opportunity to comment on applications for proposed exempted fishing permits.
NASA International Space Station Advisory Committee; Meeting
In accordance with the Federal Advisory Committee Act, as amended, the National Aeronautics and Space Administration announces a meeting of the NASA International Space Station (ISS) Advisory Committee. The purpose of the meeting is to review all aspects related to the safety and operational readiness of the ISS, and to assess the possibilities for using the ISS for future space exploration.
Magnuson-Stevens Act Provisions; Fisheries Off West Coast States; Pacific Coast Groundfish Fishery; 2018 Tribal Fishery Allocations for Pacific Whiting; Reapportionment Between Tribal and Non-tribal Sectors
This document announces the reapportionment of 40,000 metric tons of Pacific whiting from the tribal allocation to the non-tribal commercial fishery sectors via automatic action on September 24, 2018. This reapportionment is to allow full utilization of the Pacific whiting resource.
Notice of Availability of the Western Energy Company's Rosebud Mine Area F Final Environmental Impact Statement; S1D1S SS08011000 SX064A000 190S180110; S2D2S SS08011000 SX064A000 19XS501520
In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Office of Surface Mining Reclamation and Enforcement (OSMRE) has prepared a Final Environmental Impact Statement (EIS) for the Western Energy Company's Rosebud Mine Area F (Project) in southeastern Montana. This notice is announcing its availability. The Montana Department of Environmental Quality (DEQ) is a co-lead on this EIS process.
Withdrawal of the Notice of Intent To Prepare a Draft Environmental Impact Statement (DEIS) in Cooperation With the North Carolina Department of Transportation and South Carolina Department of Transportation for Extending SC 31 (Carolina Bays Parkway), in Horry County, South Carolina, To Connect to US 17, in Brunswick County, North Carolina
The U.S. Army Corps of Engineers, Wilmington District, Wilmington Regulatory Division and the U.S. Army Corps of Engineers, Charleston District, Charleston Regulatory Division (collectively COE) are issuing this notice to advise the public that a State (North Carolina Department of Transportation [NCDOT] and South Carolina Department of Transportation [SCDOT]) funded Draft Environmental Impact Statement (DEIS) will no longer be prepared by the COE, while acting as lead federal agency, for improvements to SC 31 starting near Little River, Horry County, South Carolina and running northeast to US 17, in an area between Calabash and Shallotte, Brunswick County, North Carolina. On July 6, 2017 the COE issued a Notice of Intent to prepare a DEIS for the ``Carolina Bays Parkway Extension'', NCDOT Project 44604 and SCDOT Project P029554. Recent commitment of federal funds has altered various aspects of this project, including the designation of the lead federal agency. Due to these developments, the COE will no longer act in this capacity, but rather as a cooperating agency throughout the evaluation of the project. At the appropriate time, a separate notice will be issued within the Federal Register identifying the lead agency, describing the project, and detailing the evaluation process.
Notice of Availability of the Record of Decision for the Final Missouri River Recovery Management Plan and Environmental Impact Statement
The U.S. Army Corps of Engineers (USACE) announces the availability of the Record of Decision (ROD) for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-FEIS) published in the Federal Register on Friday, August 31, 2018. The USACE Northwestern Division Commander signed the ROD on November 20, 2018. Copies of the ROD along with the MRRMP-FEIS and other supporting documents are available for viewing on the Missouri River Recovery Program website at: https://www.nwo.usace.army.mil/mrrp/ mgmt-plan/.
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Multiple IRS Information Collection Requests
The Department of the Treasury will submit the following information collection requests to the Office of Management and Budget (OMB) for review and clearance in accordance with the Paperwork Reduction Act of 1995, on or after the date of publication of this notice. The public is invited to submit comments on these requests.
Airworthiness Directives; General Electric Company Turbofan Engines
We are adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GEnx-2B67, -2B67B, and -2B67/P turbofan engines. This AD was prompted by low-cycle fatigue (LCF) cracking of the fuel manifold leading to an engine fire. This AD requires removal from service of certain fuel manifolds at the next engine shop visit and their replacement with parts eligible for installation. We are issuing this AD to address the unsafe condition on these products.
Determination of Regulatory Review Period for Purposes of Patent Extension; PROVAYBLUE
The Food and Drug Administration (FDA or the Agency) has determined the regulatory review period for PROVAYBLUE and is publishing this notice of that determination as required by law. FDA has made the determination because of the submission of an application to the Director of the U.S. Patent and Trademark Office (USPTO), Department of Commerce, for the extension of a patent which claims that human drug product.
Blood Glucose Monitoring Test Systems for Prescription Point-of-Care Use; Draft Guidance for Industry and Food and Drug Administration Staff; Availability
The Food and Drug Administration (FDA or Agency) is announcing the availability of the draft guidance for industry and FDA staff entitled ``Blood Glucose Monitoring Test Systems for Prescription Point-of-Care Use.'' This draft guidance document describes studies and criteria that FDA recommends be used when submitting premarket notifications (510(k)s) for blood glucose monitoring systems (BGMSs) that are for prescription point-of-care use. This draft guidance is not final nor is it in effect at this time.
Determination of Regulatory Review Period for Purposes of Patent Extension; KEVZARA
The Food and Drug Administration (FDA or the Agency) has determined the regulatory review period for KEVZARA and is publishing this notice of that determination as required by law. FDA has made the determination because of the submission of applications to the Director of the U.S. Patent and Trademark Office (USPTO), Department of Commerce, for the extension of a patent which claims that human biological product.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.