Upper Peninsula Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 66700-66701 [2018-28057]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
66700
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 12/
18/2018.
Filed Date: 12/17/18.
Accession Number: 20181217–5335.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER19–580–000.
Applicants: Quilt Block Wind Farm
LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 12/
18/2018.
Filed Date: 12/17/18.
Accession Number: 20181217–5337.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER19–581–000.
Applicants: Turtle Creek Wind Farm
LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 12/
18/2018.
Filed Date: 12/17/18.
Accession Number: 20181217–5338.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER19–582–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–12–17 Custom Load Aggregation
Points Clarification Amendment to be
effective 3/1/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5000.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–583–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
760 4th Rev—NITSA with Beartooth
Electric Coop to be effective 3/1/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5001.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–584–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
792 2nd Rev—NITSA with Big Horn
County Electric Coop to be effective 3/
1/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5002.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–585–000.
Applicants: Quilt Block Wind Farm
LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 2/16/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5003.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–586–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 2810
City of Chanute and Westar Meter Agent
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
Agr Cancellation to be effective 1/1/
2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5008.
Comments Due: 5 p.m. ET 1/8/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27968 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10855–300]
Upper Peninsula Power Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
variance.
b. Project No: 10855–300.
c. Date Filed: December 17, 2018.
d. Applicant: Upper Peninsula Power
Company.
e. Name of Project: Dead River
Hydroelectric Project.
f. Location: The project is located on
the Dead River in Marquette County,
Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Virgil Schlorke,
Upper Peninsula Power Company, 800
Greenwood Street, Ishpeming, MI
49849. (906) 232–1431.
i. FERC Contact: Mark Pawlowski,
(202) 502–6052, mark.pawlowski@
ferc.gov.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
j. Deadline for filing comments,
motions to intervene, and protests:
January 18, 2019.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2503–161.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency
k. Description of Request: Upper
Peninsula Power Company (licensee)
proposes to modify the start of month
target reservoir surface elevation
requirements at the Silver Lake Storage
Basin (SLSB) and Dead River Storage
Basin (DRSB) for the year 2019. The
license proposes to raise the start of
month reservoir target elevation at SLSB
to 1,479.0 feet NGVD for the months of
February and March and raise the start
of month reservoir target elevation for
April, May, June, and July to 1,485.0
feet NGVD to allow for the capture of
the maximum amount of spring runoff
flows; and reduce the SLSB elevation by
2.5 feet in July and again by 2.5 feet
through the month of August. The
licensee proposes to raise the start of
month reservoir target elevation at Dead
River Storage Basin (DRSB) to 1,341 feet
NGVD for the month of May.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
E:\FR\FM\27DEN1.SGM
27DEN1
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–28057 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
66701
Comment Date: 5:00 p.m. Eastern time
on January 14, 2019.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: December 18, 2018.
Kimberly D. Bose,
Secretary.
[Docket No. OR19–11–000]
[FR Doc. 2018–27955 Filed 12–26–18; 8:45 am]
EnLink NGL Pipeline, LP; Notice of
Petition for Declaratory Order
December 18, 2018.
Take notice that on December 11,
2018, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2) (2018), EnLink NGL
Pipeline, LP (EnLink or Petitioner), filed
a petition for a Declaratory Order
approving the overall tariff and rate
structure for an expansion of Enlink’s
interstate pipeline system (Petition) that
transports natural gas liquids (NGLs)
from the vicinity of Mont Belvieu, Texas
to various NGL fractionation facilities
located in Acadia and Iberville Parishes,
Louisiana, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–26–000.
Applicants: Buckleberry Solar, LLC.
Description: Amendment to
November 9, 2018 Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Buckleberry
Solar, LLC.
Filed Date: 12/17/18.
Accession Number: 20181217–5404.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1107–006.
Applicants: Pacific Gas and Electric
Company.
Description: Updated Market Power
Analysis for the CAISO BAA Market of
Pacific Gas and Electric Company.
Filed Date: 12/19/18.
Accession Number: 20181219–5133.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER10–2835–009.
Applicants: Google Energy LLC.
Description: Triennial Market Power
Analysis for the SPP Region of Google
Energy LLC.
Filed Date: 12/18/18.
Accession Number: 20181218–5466.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER16–1258–002;
ER13–1266–019; ER15–2211–016;
ER16–438–004.
Applicants: Grande Prairie Wind,
LLC, Marshall Wind Energy LLC,
CalEnergy, LLC, MidAmerican Energy
Services, LLC.
Description: Triennial Market Power
Update for the Southwest Power Pool
Region of the BHE Renewables
Companies.
Filed Date: 12/18/18.
Accession Number: 20181218–5465.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER17–1376–006.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2018–
12–18_Stored Energy Resource—Type II
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66700-66701]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28057]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10855-300]
Upper Peninsula Power Company; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary variance.
b. Project No: 10855-300.
c. Date Filed: December 17, 2018.
d. Applicant: Upper Peninsula Power Company.
e. Name of Project: Dead River Hydroelectric Project.
f. Location: The project is located on the Dead River in Marquette
County, Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Virgil Schlorke, Upper Peninsula Power
Company, 800 Greenwood Street, Ishpeming, MI 49849. (906) 232-1431.
i. FERC Contact: Mark Pawlowski, (202) 502-6052,
mark.pawlowski@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: January 18, 2019.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2503-161. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency
k. Description of Request: Upper Peninsula Power Company (licensee)
proposes to modify the start of month target reservoir surface
elevation requirements at the Silver Lake Storage Basin (SLSB) and Dead
River Storage Basin (DRSB) for the year 2019. The license proposes to
raise the start of month reservoir target elevation at SLSB to 1,479.0
feet NGVD for the months of February and March and raise the start of
month reservoir target elevation for April, May, June, and July to
1,485.0 feet NGVD to allow for the capture of the maximum amount of
spring runoff flows; and reduce the SLSB elevation by 2.5 feet in July
and again by 2.5 feet through the month of August. The licensee
proposes to raise the start of month reservoir target elevation at Dead
River Storage Basin (DRSB) to 1,341 feet NGVD for the month of May.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling
[[Page 66701]]
(202) 502-8371. This filing may also be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-28057 Filed 12-26-18; 8:45 am]