Upper Peninsula Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 66700-66701 [2018-28057]

Download as PDF khammond on DSK30JT082PROD with NOTICES 66700 Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices Description: § 205(d) Rate Filing: Revised MBR Tariff to be effective 12/ 18/2018. Filed Date: 12/17/18. Accession Number: 20181217–5335. Comments Due: 5 p.m. ET 1/7/19. Docket Numbers: ER19–580–000. Applicants: Quilt Block Wind Farm LLC. Description: § 205(d) Rate Filing: Revised MBR Tariff to be effective 12/ 18/2018. Filed Date: 12/17/18. Accession Number: 20181217–5337. Comments Due: 5 p.m. ET 1/7/19. Docket Numbers: ER19–581–000. Applicants: Turtle Creek Wind Farm LLC. Description: § 205(d) Rate Filing: Revised MBR Tariff to be effective 12/ 18/2018. Filed Date: 12/17/18. Accession Number: 20181217–5338. Comments Due: 5 p.m. ET 1/7/19. Docket Numbers: ER19–582–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–12–17 Custom Load Aggregation Points Clarification Amendment to be effective 3/1/2019. Filed Date: 12/18/18. Accession Number: 20181218–5000. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–583–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 760 4th Rev—NITSA with Beartooth Electric Coop to be effective 3/1/2019. Filed Date: 12/18/18. Accession Number: 20181218–5001. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–584–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 792 2nd Rev—NITSA with Big Horn County Electric Coop to be effective 3/ 1/2019. Filed Date: 12/18/18. Accession Number: 20181218–5002. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–585–000. Applicants: Quilt Block Wind Farm LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 2/16/2019. Filed Date: 12/18/18. Accession Number: 20181218–5003. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–586–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2810 City of Chanute and Westar Meter Agent VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 Agr Cancellation to be effective 1/1/ 2019. Filed Date: 12/18/18. Accession Number: 20181218–5008. Comments Due: 5 p.m. ET 1/8/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 18, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–27968 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10855–300] Upper Peninsula Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance. b. Project No: 10855–300. c. Date Filed: December 17, 2018. d. Applicant: Upper Peninsula Power Company. e. Name of Project: Dead River Hydroelectric Project. f. Location: The project is located on the Dead River in Marquette County, Michigan. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Virgil Schlorke, Upper Peninsula Power Company, 800 Greenwood Street, Ishpeming, MI 49849. (906) 232–1431. i. FERC Contact: Mark Pawlowski, (202) 502–6052, mark.pawlowski@ ferc.gov. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 j. Deadline for filing comments, motions to intervene, and protests: January 18, 2019. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2503–161. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency k. Description of Request: Upper Peninsula Power Company (licensee) proposes to modify the start of month target reservoir surface elevation requirements at the Silver Lake Storage Basin (SLSB) and Dead River Storage Basin (DRSB) for the year 2019. The license proposes to raise the start of month reservoir target elevation at SLSB to 1,479.0 feet NGVD for the months of February and March and raise the start of month reservoir target elevation for April, May, June, and July to 1,485.0 feet NGVD to allow for the capture of the maximum amount of spring runoff flows; and reduce the SLSB elevation by 2.5 feet in July and again by 2.5 feet through the month of August. The licensee proposes to raise the start of month reservoir target elevation at Dead River Storage Basin (DRSB) to 1,341 feet NGVD for the month of May. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling E:\FR\FM\27DEN1.SGM 27DEN1 khammond on DSK30JT082PROD with NOTICES Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: December 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–28057 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 66701 Comment Date: 5:00 p.m. Eastern time on January 14, 2019. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: December 18, 2018. Kimberly D. Bose, Secretary. [Docket No. OR19–11–000] [FR Doc. 2018–27955 Filed 12–26–18; 8:45 am] EnLink NGL Pipeline, LP; Notice of Petition for Declaratory Order December 18, 2018. Take notice that on December 11, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2018), EnLink NGL Pipeline, LP (EnLink or Petitioner), filed a petition for a Declaratory Order approving the overall tariff and rate structure for an expansion of Enlink’s interstate pipeline system (Petition) that transports natural gas liquids (NGLs) from the vicinity of Mont Belvieu, Texas to various NGL fractionation facilities located in Acadia and Iberville Parishes, Louisiana, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–26–000. Applicants: Buckleberry Solar, LLC. Description: Amendment to November 9, 2018 Application for Authorization Under Section 203 of the Federal Power Act, et al. of Buckleberry Solar, LLC. Filed Date: 12/17/18. Accession Number: 20181217–5404. Comments Due: 5 p.m. ET 12/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1107–006. Applicants: Pacific Gas and Electric Company. Description: Updated Market Power Analysis for the CAISO BAA Market of Pacific Gas and Electric Company. Filed Date: 12/19/18. Accession Number: 20181219–5133. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER10–2835–009. Applicants: Google Energy LLC. Description: Triennial Market Power Analysis for the SPP Region of Google Energy LLC. Filed Date: 12/18/18. Accession Number: 20181218–5466. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER16–1258–002; ER13–1266–019; ER15–2211–016; ER16–438–004. Applicants: Grande Prairie Wind, LLC, Marshall Wind Energy LLC, CalEnergy, LLC, MidAmerican Energy Services, LLC. Description: Triennial Market Power Update for the Southwest Power Pool Region of the BHE Renewables Companies. Filed Date: 12/18/18. Accession Number: 20181218–5465. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER17–1376–006. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2018– 12–18_Stored Energy Resource—Type II E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66700-66701]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28057]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10855-300]


Upper Peninsula Power Company; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Temporary variance.
    b. Project No: 10855-300.
    c. Date Filed: December 17, 2018.
    d. Applicant: Upper Peninsula Power Company.
    e. Name of Project: Dead River Hydroelectric Project.
    f. Location: The project is located on the Dead River in Marquette 
County, Michigan.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Virgil Schlorke, Upper Peninsula Power 
Company, 800 Greenwood Street, Ishpeming, MI 49849. (906) 232-1431.
    i. FERC Contact: Mark Pawlowski, (202) 502-6052, 
mark.pawlowski@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: January 18, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2503-161. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency
    k. Description of Request: Upper Peninsula Power Company (licensee) 
proposes to modify the start of month target reservoir surface 
elevation requirements at the Silver Lake Storage Basin (SLSB) and Dead 
River Storage Basin (DRSB) for the year 2019. The license proposes to 
raise the start of month reservoir target elevation at SLSB to 1,479.0 
feet NGVD for the months of February and March and raise the start of 
month reservoir target elevation for April, May, June, and July to 
1,485.0 feet NGVD to allow for the capture of the maximum amount of 
spring runoff flows; and reduce the SLSB elevation by 2.5 feet in July 
and again by 2.5 feet through the month of August. The licensee 
proposes to raise the start of month reservoir target elevation at Dead 
River Storage Basin (DRSB) to 1,341 feet NGVD for the month of May.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling

[[Page 66701]]

(202) 502-8371. This filing may also be viewed on the Commission's 
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-28057 Filed 12-26-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.