Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 66694-66695 [2018-28055]

Download as PDF 66694 Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices Dated: December 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–27958 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSK30JT082PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1589–002. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.19a(b): Refund Report_RockGen Energy to be effective N/A. Filed Date: 12/18/18. Accession Number: 20181218–5299. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER18–642–002. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.19a(b): Refund Report_Settlers Trail Wind Farm to be effective N/A. Filed Date: 12/18/18. Accession Number: 20181218–5298. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER18–2477–000. Applicants: DXT Commodities North America LLC. Description: Response of DXT Commodities North America LLC to November 2, 2018 Deficiency Letter. Filed Date: 12/17/18. Accession Number: 20181217–5398. Comments Due: 5 p.m. ET 1/7/19. Docket Numbers: ER18–2520–002. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2018– 12–18 Aliso Canyon Phase 4 Compliance to be effective 11/30/2018. Filed Date: 12/18/18. Accession Number: 20181218–5284. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–328–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–12–18_Amendment to Schedule 28 revisions related to Order 831 to be effective 12/31/9998. Filed Date: 12/18/18. Accession Number: 20181218–5281. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–587–000. VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 Applicants: ALLETE, Inc., Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–12–18_SA 3210 MP–SWLP TALA to be effective 8/25/2010. Filed Date: 12/18/18. Accession Number: 20181218–5110. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–588–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revised SA No. 1313 NITSA Among PJM and Central Virginia Electric Cooperative to be effective 12/1/2018. Filed Date: 12/18/18. Accession Number: 20181218–5122. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–589–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 filing of SGIA among NYISO, LIPA and Riverhead SA No. 2436 to be effective 11/29/2018. Filed Date: 12/18/18. Accession Number: 20181218–5175. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–590–000. Applicants: The Connecticut Light and Power Company. Description: § 205(d) Rate Filing: Cricket Valley Energy Center Related Facilities Agreement to be effective 2/ 17/2019. Filed Date: 12/18/18. Accession Number: 20181218–5296. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–591–000. Applicants: Cedars Rapids Transmission Company Limit. Description: Tariff Cancellation: Notice of Cancellation of Market-Based Rate Tariff to be effective 2/17/2019. Filed Date: 12/18/18. Accession Number: 20181218–5330. Comments Due: 5 p.m. ET 1/8/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 18, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–27967 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2512–078] Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Recreation Flow Release Plan. b. Project No: 2512–078. c. Date Filed: November 1, 2018. d. Applicant: Hawks Nest Hydro, LLC. e. Name of Project: Hawks Nest Hydroelectric Project. f. Location: The project is located on the New River, just upstream of the confluence of the New and Gauley Rivers, near the Town of Ansted in Fayette County, West Virginia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Marshall Olson, Compliance Manager, 40325 Hoops Court, Albemarle, NC 28001, (865) 255– 4240. i. FERC Contact: Shawn Halerz, (202) 502–6360, Shawn.Halerz@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: January 21, 2019. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should E:\FR\FM\27DEN1.SGM 27DEN1 khammond on DSK30JT082PROD with NOTICES Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices include docket number P–2512–078. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: As required by Article 407 of the December 22, 2017 license, Hawks Nest Hydro, LLC (licensee) requests Commission approval of a proposed Recreation Flow Release Plan (plan) for the project. The plan incorporates the provisions and guidelines required by Article 407 and conditions of the West Virginia Department of Environmental Protection water quality certificate. The licensee proposes procedures for recreation flow releases, default schedules for recreation flow releases, procedures for annual meetings regarding recreation flow releases and post-release evaluation meetings, guidelines for participant safety, and a flow notification website. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: December 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–28055 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2153–041] United Water Conservation District; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Federal Energy Regulatory Commission and is available for public inspection: a. Application Type: Recreation Trail Plan Amendment. b. Project No: 2153–041. c. Date Filed: August 15, 2018. d. Applicant: United Water Conservation District. e. Name of Project: Santa Felicia Hydroelectric Project. f. Location: The project is located on Piru Creek, a tributary of the Santa Clara River, in Ventura County, California. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 66695 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Linda Purpus, Senior Environmental Scientist, United Water Conservation District, 106 North 8th Street, Santa Paula, CA 93060; phone (805) 525–4431. i. FERC Contact: Mark Ivy at (202) 502–6156, or mark.ivy@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: January 18, 2019. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, and comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2153–041. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: As required by ordering paragraph (B) of the January 6, 2017 Order Approving Trail Plan, United Water Conservation District requests Commission approval of an amendment to the recreation trail plan, to develop the Pothole Trailhead Parking Area. Background information regarding development of the recreation trail plan can be found in the November 2, 2017 progress report (accession # 20171102–5035) on eLibrary. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66694-66695]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28055]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2512-078]


Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Recreation Flow Release Plan.
    b. Project No: 2512-078.
    c. Date Filed: November 1, 2018.
    d. Applicant: Hawks Nest Hydro, LLC.
    e. Name of Project: Hawks Nest Hydroelectric Project.
    f. Location: The project is located on the New River, just upstream 
of the confluence of the New and Gauley Rivers, near the Town of Ansted 
in Fayette County, West Virginia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Marshall Olson, Compliance Manager, 40325 
Hoops Court, Albemarle, NC 28001, (865) 255-4240.
    i. FERC Contact: Shawn Halerz, (202) 502-6360, 
Shawn.Halerz@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: January 21, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should

[[Page 66695]]

include docket number P-2512-078. Comments emailed to Commission staff 
are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: As required by Article 407 of the 
December 22, 2017 license, Hawks Nest Hydro, LLC (licensee) requests 
Commission approval of a proposed Recreation Flow Release Plan (plan) 
for the project. The plan incorporates the provisions and guidelines 
required by Article 407 and conditions of the West Virginia Department 
of Environmental Protection water quality certificate. The licensee 
proposes procedures for recreation flow releases, default schedules for 
recreation flow releases, procedures for annual meetings regarding 
recreation flow releases and post-release evaluation meetings, 
guidelines for participant safety, and a flow notification website.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-28055 Filed 12-26-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.