Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 66694-66695 [2018-28055]
Download as PDF
66694
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
Dated: December 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27958 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSK30JT082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1589–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report_RockGen Energy to be
effective N/A.
Filed Date: 12/18/18.
Accession Number: 20181218–5299.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER18–642–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report_Settlers Trail Wind Farm
to be effective N/A.
Filed Date: 12/18/18.
Accession Number: 20181218–5298.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER18–2477–000.
Applicants: DXT Commodities North
America LLC.
Description: Response of DXT
Commodities North America LLC to
November 2, 2018 Deficiency Letter.
Filed Date: 12/17/18.
Accession Number: 20181217–5398.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER18–2520–002.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2018–
12–18 Aliso Canyon Phase 4
Compliance to be effective 11/30/2018.
Filed Date: 12/18/18.
Accession Number: 20181218–5284.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–328–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–12–18_Amendment to Schedule
28 revisions related to Order 831 to be
effective 12/31/9998.
Filed Date: 12/18/18.
Accession Number: 20181218–5281.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–587–000.
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
Applicants: ALLETE, Inc.,
Midcontinent Independent System
Operator, Inc.
Description: § 205(d) Rate Filing:
2018–12–18_SA 3210 MP–SWLP TALA
to be effective 8/25/2010.
Filed Date: 12/18/18.
Accession Number: 20181218–5110.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–588–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revised SA No. 1313 NITSA Among
PJM and Central Virginia Electric
Cooperative to be effective 12/1/2018.
Filed Date: 12/18/18.
Accession Number: 20181218–5122.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–589–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205
filing of SGIA among NYISO, LIPA and
Riverhead SA No. 2436 to be effective
11/29/2018.
Filed Date: 12/18/18.
Accession Number: 20181218–5175.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–590–000.
Applicants: The Connecticut Light
and Power Company.
Description: § 205(d) Rate Filing:
Cricket Valley Energy Center Related
Facilities Agreement to be effective 2/
17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5296.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–591–000.
Applicants: Cedars Rapids
Transmission Company Limit.
Description: Tariff Cancellation:
Notice of Cancellation of Market-Based
Rate Tariff to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5330.
Comments Due: 5 p.m. ET 1/8/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27967 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2512–078]
Hawks Nest Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation Flow
Release Plan.
b. Project No: 2512–078.
c. Date Filed: November 1, 2018.
d. Applicant: Hawks Nest Hydro, LLC.
e. Name of Project: Hawks Nest
Hydroelectric Project.
f. Location: The project is located on
the New River, just upstream of the
confluence of the New and Gauley
Rivers, near the Town of Ansted in
Fayette County, West Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Marshall Olson,
Compliance Manager, 40325 Hoops
Court, Albemarle, NC 28001, (865) 255–
4240.
i. FERC Contact: Shawn Halerz, (202)
502–6360, Shawn.Halerz@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 21, 2019.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
E:\FR\FM\27DEN1.SGM
27DEN1
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
include docket number P–2512–078.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by Article 407 of the December 22, 2017
license, Hawks Nest Hydro, LLC
(licensee) requests Commission
approval of a proposed Recreation Flow
Release Plan (plan) for the project. The
plan incorporates the provisions and
guidelines required by Article 407 and
conditions of the West Virginia
Department of Environmental Protection
water quality certificate. The licensee
proposes procedures for recreation flow
releases, default schedules for recreation
flow releases, procedures for annual
meetings regarding recreation flow
releases and post-release evaluation
meetings, guidelines for participant
safety, and a flow notification website.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–28055 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2153–041]
United Water Conservation District;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Application Type: Recreation Trail
Plan Amendment.
b. Project No: 2153–041.
c. Date Filed: August 15, 2018.
d. Applicant: United Water
Conservation District.
e. Name of Project: Santa Felicia
Hydroelectric Project.
f. Location: The project is located on
Piru Creek, a tributary of the Santa Clara
River, in Ventura County, California.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
66695
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Linda Purpus,
Senior Environmental Scientist, United
Water Conservation District, 106 North
8th Street, Santa Paula, CA 93060;
phone (805) 525–4431.
i. FERC Contact: Mark Ivy at (202)
502–6156, or mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 18, 2019.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2153–041.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by ordering paragraph (B) of the January
6, 2017 Order Approving Trail Plan,
United Water Conservation District
requests Commission approval of an
amendment to the recreation trail plan,
to develop the Pothole Trailhead
Parking Area. Background information
regarding development of the recreation
trail plan can be found in the November
2, 2017 progress report (accession #
20171102–5035) on eLibrary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66694-66695]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28055]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2512-078]
Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Recreation Flow Release Plan.
b. Project No: 2512-078.
c. Date Filed: November 1, 2018.
d. Applicant: Hawks Nest Hydro, LLC.
e. Name of Project: Hawks Nest Hydroelectric Project.
f. Location: The project is located on the New River, just upstream
of the confluence of the New and Gauley Rivers, near the Town of Ansted
in Fayette County, West Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Marshall Olson, Compliance Manager, 40325
Hoops Court, Albemarle, NC 28001, (865) 255-4240.
i. FERC Contact: Shawn Halerz, (202) 502-6360,
Shawn.Halerz@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: January 21, 2019.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should
[[Page 66695]]
include docket number P-2512-078. Comments emailed to Commission staff
are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: As required by Article 407 of the
December 22, 2017 license, Hawks Nest Hydro, LLC (licensee) requests
Commission approval of a proposed Recreation Flow Release Plan (plan)
for the project. The plan incorporates the provisions and guidelines
required by Article 407 and conditions of the West Virginia Department
of Environmental Protection water quality certificate. The licensee
proposes procedures for recreation flow releases, default schedules for
recreation flow releases, procedures for annual meetings regarding
recreation flow releases and post-release evaluation meetings,
guidelines for participant safety, and a flow notification website.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-28055 Filed 12-26-18; 8:45 am]
BILLING CODE 6717-01-P