United Water Conservation District; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 66695-66696 [2018-28054]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
include docket number P–2512–078.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by Article 407 of the December 22, 2017
license, Hawks Nest Hydro, LLC
(licensee) requests Commission
approval of a proposed Recreation Flow
Release Plan (plan) for the project. The
plan incorporates the provisions and
guidelines required by Article 407 and
conditions of the West Virginia
Department of Environmental Protection
water quality certificate. The licensee
proposes procedures for recreation flow
releases, default schedules for recreation
flow releases, procedures for annual
meetings regarding recreation flow
releases and post-release evaluation
meetings, guidelines for participant
safety, and a flow notification website.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–28055 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2153–041]
United Water Conservation District;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Application Type: Recreation Trail
Plan Amendment.
b. Project No: 2153–041.
c. Date Filed: August 15, 2018.
d. Applicant: United Water
Conservation District.
e. Name of Project: Santa Felicia
Hydroelectric Project.
f. Location: The project is located on
Piru Creek, a tributary of the Santa Clara
River, in Ventura County, California.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
66695
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Linda Purpus,
Senior Environmental Scientist, United
Water Conservation District, 106 North
8th Street, Santa Paula, CA 93060;
phone (805) 525–4431.
i. FERC Contact: Mark Ivy at (202)
502–6156, or mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 18, 2019.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2153–041.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by ordering paragraph (B) of the January
6, 2017 Order Approving Trail Plan,
United Water Conservation District
requests Commission approval of an
amendment to the recreation trail plan,
to develop the Pothole Trailhead
Parking Area. Background information
regarding development of the recreation
trail plan can be found in the November
2, 2017 progress report (accession #
20171102–5035) on eLibrary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
E:\FR\FM\27DEN1.SGM
27DEN1
khammond on DSK30JT082PROD with NOTICES
66696
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL09–61–004]
[Docket No. CP19–11–000]
Entergy Services, LLC; Notice of Filing
Sabine Pass LNG, L.P.; Notice of
Schedule for Environmental Review of
the SPLNG Third Berth Expansion
Project
Take notice that on December 17,
2018, Entergy Services, LLC submitted a
Compliance Refund Report providing
the final calculation of refunds due from
Entergy Arkansas, Inc. to other Entergy
Operating Companies, pursuant to the
Federal Energy Regulatory
Commission’s October 18, 2018 Order.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 7, 2019.
Dated: December 18, 2018.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
17:14 Dec 26, 2018
DEPARTMENT OF ENERGY
[FR Doc. 2018–27957 Filed 12–26–18; 8:45 am]
[FR Doc. 2018–28054 Filed 12–26–18; 8:45 am]
VerDate Sep<11>2014
DEPARTMENT OF ENERGY
Jkt 247001
1 La. Pub. Serv. Comm’n v. Entergy Corp., et al.,
165 FERC ¶ 61,022 (October 18, 2018).
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
On October 29, 2018, Sabine Pass
LNG, L.P. (SPLNG) filed an application
in Docket No. CP19–11–000 requesting
authorization pursuant to section 3(a) of
the Natural Gas Act to construct and
operate certain liquefied natural gas
(LNG) facilities in Sabine Pass,
Louisiana. The proposed project is
known as the SPLNG Third Birth
Expansion Project (Project) and would
include an expansion of the existing
Sabine Pass LNG facility (Terminal),
located in Cameron Parish, Louisiana on
the Sabine Pass Channel.
On November 7, 2018, the Federal
Energy Regulatory Commission (FERC
or Commission) issued its Notice of
Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
the request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for completion of the
EA for the Project. The forecasted
schedule for the EA is based upon
SPLNG providing complete and timely
responses to any data requests. In
addition, the schedule assumes that the
cooperating agencies will provide input
on their areas of responsibility on a
timely basis.
Schedule for Environmental Review
Issuance of EA: (August 23, 2019).
90-day Federal Authorization
Decision Deadline: (November 21,
2019).
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The proposed expansion of the
Terminal consists of the addition of a
third marine berth (Third Berth) and
supporting facilities. The Third Berth
would be used to load LNG carriers for
export and would be sized to
accommodate vessels with a capacity of
125,000 cubic meters (m3) to 180,000
m3. The supporting facilities would
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66695-66696]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28054]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2153-041]
United Water Conservation District; Notice of Application
Accepted for Filing, Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Federal Energy Regulatory Commission and is available
for public inspection:
a. Application Type: Recreation Trail Plan Amendment.
b. Project No: 2153-041.
c. Date Filed: August 15, 2018.
d. Applicant: United Water Conservation District.
e. Name of Project: Santa Felicia Hydroelectric Project.
f. Location: The project is located on Piru Creek, a tributary of
the Santa Clara River, in Ventura County, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Linda Purpus, Senior Environmental Scientist,
United Water Conservation District, 106 North 8th Street, Santa Paula,
CA 93060; phone (805) 525-4431.
i. FERC Contact: Mark Ivy at (202) 502-6156, or mark.ivy@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: January 18, 2019.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, and comments using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2153-041. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: As required by ordering paragraph (B) of
the January 6, 2017 Order Approving Trail Plan, United Water
Conservation District requests Commission approval of an amendment to
the recreation trail plan, to develop the Pothole Trailhead Parking
Area. Background information regarding development of the recreation
trail plan can be found in the November 2, 2017 progress report
(accession # 20171102-5035) on eLibrary.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be
[[Page 66696]]
viewed on the Commission's website at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-28054 Filed 12-26-18; 8:45 am]