Combined Notice of Filings #1, 66701-66703 [2018-28043]

Download as PDF khammond on DSK30JT082PROD with NOTICES Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: December 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–28057 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 66701 Comment Date: 5:00 p.m. Eastern time on January 14, 2019. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: December 18, 2018. Kimberly D. Bose, Secretary. [Docket No. OR19–11–000] [FR Doc. 2018–27955 Filed 12–26–18; 8:45 am] EnLink NGL Pipeline, LP; Notice of Petition for Declaratory Order December 18, 2018. Take notice that on December 11, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2018), EnLink NGL Pipeline, LP (EnLink or Petitioner), filed a petition for a Declaratory Order approving the overall tariff and rate structure for an expansion of Enlink’s interstate pipeline system (Petition) that transports natural gas liquids (NGLs) from the vicinity of Mont Belvieu, Texas to various NGL fractionation facilities located in Acadia and Iberville Parishes, Louisiana, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–26–000. Applicants: Buckleberry Solar, LLC. Description: Amendment to November 9, 2018 Application for Authorization Under Section 203 of the Federal Power Act, et al. of Buckleberry Solar, LLC. Filed Date: 12/17/18. Accession Number: 20181217–5404. Comments Due: 5 p.m. ET 12/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1107–006. Applicants: Pacific Gas and Electric Company. Description: Updated Market Power Analysis for the CAISO BAA Market of Pacific Gas and Electric Company. Filed Date: 12/19/18. Accession Number: 20181219–5133. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER10–2835–009. Applicants: Google Energy LLC. Description: Triennial Market Power Analysis for the SPP Region of Google Energy LLC. Filed Date: 12/18/18. Accession Number: 20181218–5466. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER16–1258–002; ER13–1266–019; ER15–2211–016; ER16–438–004. Applicants: Grande Prairie Wind, LLC, Marshall Wind Energy LLC, CalEnergy, LLC, MidAmerican Energy Services, LLC. Description: Triennial Market Power Update for the Southwest Power Pool Region of the BHE Renewables Companies. Filed Date: 12/18/18. Accession Number: 20181218–5465. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER17–1376–006. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2018– 12–18_Stored Energy Resource—Type II E:\FR\FM\27DEN1.SGM 27DEN1 khammond on DSK30JT082PROD with NOTICES 66702 Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices Compliance Filing to be effective 12/1/ 2017. Filed Date: 12/18/18. Accession Number: 20181218–5376. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER17–2386–004. Applicants: Great Bay Solar I, LLC. Description: Compliance filing: Compliance Filing to be effective 11/1/ 2017. Filed Date: 12/19/18. Accession Number: 20181219–5052. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER18–554–003. Applicants: Carville Energy LLC. Description: Compliance filing: Reactive Service Rate Schedule Compliance Filing to be effective 3/1/ 2018. Filed Date: 12/19/18. Accession Number: 20181219–5084. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–178–001. Applicants: PACE RENEWABLE ENERGY 1 LLC. Description: Tariff Amendment: Supplemental—Ownership Info to be effective 12/20/2018. Filed Date: 12/19/18. Accession Number: 20181219–5029. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–302–001. Applicants: NTE Southeast Electric Company, LLC. Description: Second Supplement to December 12, 2018 NTE Southeast Electric Company, LLC tariff filing [Asset Appendices]. Filed Date: 12/17/18. Accession Number: 20181217–5387. Comments Due: 5 p.m. ET 1/7/19. Docket Numbers: ER19–464–000. Applicants: Vermillion Power, L.L.C. Description: Amendment to December 3, 2018 Vermillion Power, L.L.C. tariff filing. Filed Date: 12/19/18. Accession Number: 20181219–5131. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–592–000. Applicants: Valentine Solar, LLC. Description: Baseline eTariff Filing: Valentine Solar Initial Market-Based Rate Application Filing to be effective 2/17/2019. Filed Date: 12/18/18. Accession Number: 20181218–5381. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–593–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: NonSubstantive Consolidation of MarketBased Rate Tariff Records to be effective 12/19/2018. Filed Date: 12/18/18. Accession Number: 20181218–5390. Comments Due: 5 p.m. ET 1/8/19. VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 Docket Numbers: ER19–594–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Daggett Solar 2 LLC SA No. 224 to be effective 2/17/2019. Filed Date: 12/18/18. Accession Number: 20181218–5413. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–595–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Daggett Solar 3 LLC SA No. 225 to be effective 2/17/2019. Filed Date: 12/18/18. Accession Number: 20181218–5414. Comments Due: 5 p.m. ET 1/8/19. Docket Numbers: ER19–596–000. Applicants: CPV Keenan II Renewable Energy Company, LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 2/18/2019. Filed Date: 12/19/18. Accession Number: 20181219–5027. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–597–000. Applicants: Southern California Edison Company. Description: Tariff Cancellation: Cancel GIA & DSA LA County Flood Control District San Gabriel Dam Hydroelectric to be effective 10/31/ 2018. Filed Date: 12/19/18. Accession Number: 20181219–5032. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–598–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–12–19_SA 3222 OTP–OTP GIA (J510) to be effective 12/5/2018. Filed Date: 12/19/18. Accession Number: 20181219–5081. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–599–000. Applicants: American Transmission Systems, Incorporation, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI submits Revised Interconnection Agreement SA No. 3994 to be effective 2/18/2019. Filed Date: 12/19/18. Accession Number: 20181219–5103. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–600–000. Applicants: American Transmission Systems, Incorporation, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI submits a ECSA, Service Agreement No. 5137 re: GM Cleveland RTU Replacement to be effective 2/18/ 2019. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Filed Date: 12/19/18. Accession Number: 20181219–5114. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–601–000. Applicants: AEP Energy Partners, Inc. Description: § 205(d) Rate Filing: MBR Tariff, FERC Electric Tariff for Market Bases Sales to be effective 3/1/2019. Filed Date: 12/19/18. Accession Number: 20181219–5115. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–602–000. Applicants: Southwest Power Pool, Inc., American Electric Power Service Corporation. Description: § 205(d) Rate Filing: Cost Recovery Filing on Behalf of American Electric Power Service Corp. to be effective 3/1/2019. Filed Date: 12/19/18. Accession Number: 20181219–5116. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–603–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA and ICSA SA Nos. 5245 and 5250; Queue No. AB2–067/AC1– 044 to be effective 12/31/9998. Filed Date: 12/19/18. Accession Number: 20181219–5117. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–604–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Sch.12 of the OA to reflect termination of GreenHat Energy, LLC to be effective 2/19/2019. Filed Date: 12/19/18. Accession Number: 20181219–5118. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–605–000. Applicants: Republic Transmission, LLC. Description: Baseline eTariff Filing: Baseline Rate Transmission Filing for Republic Transmission to be effective 12/19/2018. Filed Date: 12/19/18. Accession Number: 20181219–5119. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–606–000. Applicants: AEP Generation Resources Inc. Description: § 205(d) Rate Filing: MBR Tariff, FERC Electric Tariff For MarketBased Sales to be effective 3/1/2014. Filed Date: 12/19/18. Accession Number: 20181219–5120. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–607–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Sch. 12 of OA to reflect termination of Amerigreen Energy, LLC to be effective 2/19/2019. E:\FR\FM\27DEN1.SGM 27DEN1 Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices Filed Date: 12/19/18. Accession Number: 20181219–5122. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–608–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ComEd submits revisions to Att. H–13 re: Marengo Battery Wholesale Dist. Charges to be effective 12/20/2018. Filed Date: 12/19/18. Accession Number: 20181219–5138. Comments Due: 5 p.m. ET 1/9/19. Docket Numbers: ER19–609–000. Applicants: Pacific Gas and Electric Company. Description: Request for One-time Tariff Waiver of Pacific Gas and Electric Company. Filed Date: 12/19/18. Accession Number: 20181219–5140. Comments Due: 5 p.m. ET 1/9/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 19, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–28043 Filed 12–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSK30JT082PROD with NOTICES [Project No. 1403–064; Project No. 2678– 009] Notice of Application for Transfer of License and Amendment of License and Soliciting Comments, Motions To Intervene, and Protests; Pacific Gas and Electric Company, Yuba County Water Agency Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. VerDate Sep<11>2014 17:14 Dec 26, 2018 Jkt 247001 a. Type of Application: Transfer of License and Amendment. b. Project Nos.: 1403–064 and 2678– 009. c. Date filed: October 17, 2018. d. Applicants: Pacific Gas and Electric Company (transferor), Yuba County Water Agency (transferee). e. Name of Projects: Narrows Project (P–1403), Narrows No. 2 Transmission Line Project (P–2678). f. Location: Narrows Project—located at the U.S. Army Corps of Engineers’ (Corps) Englebright Dam on the Yuba River in Nevada County, California. Narrows No. 2 Transmission Line Project—located in the Sierra Nevada foothills in the Yuba River watershed adjacent to the Narrows Project in Yuba and Nevada counties, California, and occupies 1.28 acres of public land managed by the Corps. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicants Contact: For Transferor: Ms. Annette Faraglia, Chief Counsel Hydro Generation, Pacific Gas and Electric Company, 77 Beale Street, B30A–3005, San Francisco, CA 94105, 415–973–7145, Email: annette.faraglia@ pge.com and Ms. Stephanie Maggard, Director, Power Generation, Pacific Gas and Electric Company, 245 Market Street, N11E–1136, San Francisco, CA 94105, 415–973–2812, Email: Stephanie.maggard@pge.com. For Transferee: Mr. Richard P. Shanahan, General Counsel, Bartkiewicz, Kronick & Shanahan, Yuba County Water Agency, 1011 22nd Street, Sacramento, CA 95816–4907, 916–446– 4254, Email: rps@bkslawfirm.com and Mr. Curtis Aikens, General Manager, Yuba County Water Agency, 1220 F Street, Marysville, CA 95901, 530–741– 5015, Email: caikens@yubawater.org. i. FERC Contacts: Patricia W. Gillis, (202) 502–8735 or patricia.gillis@ ferc.gov, or Steven Sachs, (202) 502– 8666 or steven.sachs@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, or protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 66703 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket numbers P–1403–064 and P–2678–009. k. Description of Transfer and Amendment Requests: The applicants request that the Commission transfer the Narrows Project No. 1403 from Pacific Gas and Electric Company to Yuba County Water Agency. The applicants also request that the Commission remove the transmission line for the Narrows Project and incorporate it into the license for the Narrows No. 2 Transmission Line Project No. 2678. Furthermore, the applicants request that the Commission remove facilities and lands from the Narrows Project, which they state are not under the Commission’s jurisdiction. These include a substation at the terminus of the Narrows Project transmission line, a telephone line connecting the project and the Corps’ headworks, an access road, and adjoining lands not needed for project purposes. l. Location of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676, email FERCOnlineSupport@ferc.gov, or for TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests and other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66701-66703]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28043]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-26-000.
    Applicants: Buckleberry Solar, LLC.
    Description: Amendment to November 9, 2018 Application for 
Authorization Under Section 203 of the Federal Power Act, et al. of 
Buckleberry Solar, LLC.
    Filed Date: 12/17/18.
    Accession Number: 20181217-5404.
    Comments Due: 5 p.m. ET 12/26/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1107-006.
    Applicants: Pacific Gas and Electric Company.
    Description: Updated Market Power Analysis for the CAISO BAA Market 
of Pacific Gas and Electric Company.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5133.
    Comments Due: 5 p.m. ET 2/20/19.

    Docket Numbers: ER10-2835-009.
    Applicants: Google Energy LLC.
    Description: Triennial Market Power Analysis for the SPP Region of 
Google Energy LLC.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5466.
    Comments Due: 5 p.m. ET 2/19/19.

    Docket Numbers: ER16-1258-002; ER13-1266-019; ER15-2211-016; ER16-
438-004.
    Applicants: Grande Prairie Wind, LLC, Marshall Wind Energy LLC, 
CalEnergy, LLC, MidAmerican Energy Services, LLC.
    Description: Triennial Market Power Update for the Southwest Power 
Pool Region of the BHE Renewables Companies.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5465.
    Comments Due: 5 p.m. ET 2/19/19.

    Docket Numbers: ER17-1376-006.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Compliance filing: 2018-12-18_Stored Energy Resource--
Type II

[[Page 66702]]

Compliance Filing to be effective 12/1/2017.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5376.
    Comments Due: 5 p.m. ET 1/8/19.

    Docket Numbers: ER17-2386-004.
    Applicants: Great Bay Solar I, LLC.
    Description: Compliance filing: Compliance Filing to be effective 
11/1/2017.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5052.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER18-554-003.
    Applicants: Carville Energy LLC.
    Description: Compliance filing: Reactive Service Rate Schedule 
Compliance Filing to be effective 3/1/2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5084.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-178-001.
    Applicants: PACE RENEWABLE ENERGY 1 LLC.
    Description: Tariff Amendment: Supplemental--Ownership Info to be 
effective 12/20/2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5029.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-302-001.
    Applicants: NTE Southeast Electric Company, LLC.
    Description: Second Supplement to December 12, 2018 NTE Southeast 
Electric Company, LLC tariff filing [Asset Appendices].
    Filed Date: 12/17/18.
    Accession Number: 20181217-5387.
    Comments Due: 5 p.m. ET 1/7/19.

    Docket Numbers: ER19-464-000.
    Applicants: Vermillion Power, L.L.C.
    Description: Amendment to December 3, 2018 Vermillion Power, L.L.C. 
tariff filing.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5131.
    Comments Due: 5 p.m. ET 1/2/19.

    Docket Numbers: ER19-592-000.
    Applicants: Valentine Solar, LLC.
    Description: Baseline eTariff Filing: Valentine Solar Initial 
Market-Based Rate Application Filing to be effective 2/17/2019.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5381.
    Comments Due: 5 p.m. ET 1/8/19.

    Docket Numbers: ER19-593-000.
    Applicants: El Paso Electric Company.
    Description: Sec.  205(d) Rate Filing: Non-Substantive 
Consolidation of Market-Based Rate Tariff Records to be effective 12/
19/2018.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5390.
    Comments Due: 5 p.m. ET 1/8/19.

    Docket Numbers: ER19-594-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Daggett Solar 2 LLC SA 
No. 224 to be effective 2/17/2019.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5413.
    Comments Due: 5 p.m. ET 1/8/19.

    Docket Numbers: ER19-595-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Daggett Solar 3 LLC SA 
No. 225 to be effective 2/17/2019.
    Filed Date: 12/18/18.
    Accession Number: 20181218-5414.
    Comments Due: 5 p.m. ET 1/8/19.

    Docket Numbers: ER19-596-000.
    Applicants: CPV Keenan II Renewable Energy Company, LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff to be effective 2/18/2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5027.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-597-000.
    Applicants: Southern California Edison Company.
    Description: Tariff Cancellation: Cancel GIA & DSA LA County Flood 
Control District San Gabriel Dam Hydroelectric to be effective 10/31/
2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5032.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-598-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-12-19_SA 3222 OTP-OTP 
GIA (J510) to be effective 12/5/2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5081.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-599-000.
    Applicants: American Transmission Systems, Incorporation, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: ATSI submits Revised 
Interconnection Agreement SA No. 3994 to be effective 2/18/2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5103.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-600-000.
    Applicants: American Transmission Systems, Incorporation, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: ATSI submits a ECSA, Service 
Agreement No. 5137 re: GM Cleveland RTU Replacement to be effective 2/
18/2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5114.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-601-000.
    Applicants: AEP Energy Partners, Inc.
    Description: Sec.  205(d) Rate Filing: MBR Tariff, FERC Electric 
Tariff for Market Bases Sales to be effective 3/1/2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5115.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-602-000.
    Applicants: Southwest Power Pool, Inc., American Electric Power 
Service Corporation.
    Description: Sec.  205(d) Rate Filing: Cost Recovery Filing on 
Behalf of American Electric Power Service Corp. to be effective 3/1/
2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5116.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-603-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA and ICSA SA 
Nos. 5245 and 5250; Queue No. AB2-067/AC1-044 to be effective 12/31/
9998.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5117.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-604-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Sch.12 of the 
OA to reflect termination of GreenHat Energy, LLC to be effective 2/19/
2019.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5118.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-605-000.
    Applicants: Republic Transmission, LLC.
    Description: Baseline eTariff Filing: Baseline Rate Transmission 
Filing for Republic Transmission to be effective 12/19/2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5119.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-606-000.
    Applicants: AEP Generation Resources Inc.
    Description: Sec.  205(d) Rate Filing: MBR Tariff, FERC Electric 
Tariff For Market-Based Sales to be effective 3/1/2014.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5120.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-607-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Sch. 12 of OA 
to reflect termination of Amerigreen Energy, LLC to be effective 2/19/
2019.

[[Page 66703]]

    Filed Date: 12/19/18.
    Accession Number: 20181219-5122.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-608-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: ComEd submits revisions to 
Att. H-13 re: Marengo Battery Wholesale Dist. Charges to be effective 
12/20/2018.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5138.
    Comments Due: 5 p.m. ET 1/9/19.

    Docket Numbers: ER19-609-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Request for One-time Tariff Waiver of Pacific Gas and 
Electric Company.
    Filed Date: 12/19/18.
    Accession Number: 20181219-5140.
    Comments Due: 5 p.m. ET 1/9/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: December 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-28043 Filed 12-26-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.