Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–28057 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
66701
Comment Date: 5:00 p.m. Eastern time
on January 14, 2019.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: December 18, 2018.
Kimberly D. Bose,
Secretary.
[Docket No. OR19–11–000]
[FR Doc. 2018–27955 Filed 12–26–18; 8:45 am]
EnLink NGL Pipeline, LP; Notice of
Petition for Declaratory Order
December 18, 2018.
Take notice that on December 11,
2018, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2) (2018), EnLink NGL
Pipeline, LP (EnLink or Petitioner), filed
a petition for a Declaratory Order
approving the overall tariff and rate
structure for an expansion of Enlink’s
interstate pipeline system (Petition) that
transports natural gas liquids (NGLs)
from the vicinity of Mont Belvieu, Texas
to various NGL fractionation facilities
located in Acadia and Iberville Parishes,
Louisiana, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–26–000.
Applicants: Buckleberry Solar, LLC.
Description: Amendment to
November 9, 2018 Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Buckleberry
Solar, LLC.
Filed Date: 12/17/18.
Accession Number: 20181217–5404.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1107–006.
Applicants: Pacific Gas and Electric
Company.
Description: Updated Market Power
Analysis for the CAISO BAA Market of
Pacific Gas and Electric Company.
Filed Date: 12/19/18.
Accession Number: 20181219–5133.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER10–2835–009.
Applicants: Google Energy LLC.
Description: Triennial Market Power
Analysis for the SPP Region of Google
Energy LLC.
Filed Date: 12/18/18.
Accession Number: 20181218–5466.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER16–1258–002;
ER13–1266–019; ER15–2211–016;
ER16–438–004.
Applicants: Grande Prairie Wind,
LLC, Marshall Wind Energy LLC,
CalEnergy, LLC, MidAmerican Energy
Services, LLC.
Description: Triennial Market Power
Update for the Southwest Power Pool
Region of the BHE Renewables
Companies.
Filed Date: 12/18/18.
Accession Number: 20181218–5465.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER17–1376–006.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2018–
12–18_Stored Energy Resource—Type II
E:\FR\FM\27DEN1.SGM
27DEN1
khammond on DSK30JT082PROD with NOTICES
66702
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
Compliance Filing to be effective 12/1/
2017.
Filed Date: 12/18/18.
Accession Number: 20181218–5376.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER17–2386–004.
Applicants: Great Bay Solar I, LLC.
Description: Compliance filing:
Compliance Filing to be effective 11/1/
2017.
Filed Date: 12/19/18.
Accession Number: 20181219–5052.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER18–554–003.
Applicants: Carville Energy LLC.
Description: Compliance filing:
Reactive Service Rate Schedule
Compliance Filing to be effective 3/1/
2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5084.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–178–001.
Applicants: PACE RENEWABLE
ENERGY 1 LLC.
Description: Tariff Amendment:
Supplemental—Ownership Info to be
effective 12/20/2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5029.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–302–001.
Applicants: NTE Southeast Electric
Company, LLC.
Description: Second Supplement to
December 12, 2018 NTE Southeast
Electric Company, LLC tariff filing
[Asset Appendices].
Filed Date: 12/17/18.
Accession Number: 20181217–5387.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER19–464–000.
Applicants: Vermillion Power, L.L.C.
Description: Amendment to December
3, 2018 Vermillion Power, L.L.C. tariff
filing.
Filed Date: 12/19/18.
Accession Number: 20181219–5131.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–592–000.
Applicants: Valentine Solar, LLC.
Description: Baseline eTariff Filing:
Valentine Solar Initial Market-Based
Rate Application Filing to be effective
2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5381.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–593–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing: NonSubstantive Consolidation of MarketBased Rate Tariff Records to be effective
12/19/2018.
Filed Date: 12/18/18.
Accession Number: 20181218–5390.
Comments Due: 5 p.m. ET 1/8/19.
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
Docket Numbers: ER19–594–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Daggett Solar 2 LLC SA No. 224
to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5413.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–595–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Daggett Solar 3 LLC SA No. 225
to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218–5414.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19–596–000.
Applicants: CPV Keenan II Renewable
Energy Company, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 2/18/2019.
Filed Date: 12/19/18.
Accession Number: 20181219–5027.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–597–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Cancel GIA & DSA LA County Flood
Control District San Gabriel Dam
Hydroelectric to be effective 10/31/
2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5032.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–598–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–12–19_SA 3222 OTP–OTP GIA
(J510) to be effective 12/5/2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5081.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–599–000.
Applicants: American Transmission
Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits Revised Interconnection
Agreement SA No. 3994 to be effective
2/18/2019.
Filed Date: 12/19/18.
Accession Number: 20181219–5103.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–600–000.
Applicants: American Transmission
Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits a ECSA, Service
Agreement No. 5137 re: GM Cleveland
RTU Replacement to be effective 2/18/
2019.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Filed Date: 12/19/18.
Accession Number: 20181219–5114.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–601–000.
Applicants: AEP Energy Partners, Inc.
Description: § 205(d) Rate Filing: MBR
Tariff, FERC Electric Tariff for Market
Bases Sales to be effective 3/1/2019.
Filed Date: 12/19/18.
Accession Number: 20181219–5115.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–602–000.
Applicants: Southwest Power Pool,
Inc., American Electric Power Service
Corporation.
Description: § 205(d) Rate Filing: Cost
Recovery Filing on Behalf of American
Electric Power Service Corp. to be
effective 3/1/2019.
Filed Date: 12/19/18.
Accession Number: 20181219–5116.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–603–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA and ICSA SA Nos. 5245
and 5250; Queue No. AB2–067/AC1–
044 to be effective 12/31/9998.
Filed Date: 12/19/18.
Accession Number: 20181219–5117.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–604–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Sch.12 of the OA to reflect
termination of GreenHat Energy, LLC to
be effective 2/19/2019.
Filed Date: 12/19/18.
Accession Number: 20181219–5118.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–605–000.
Applicants: Republic Transmission,
LLC.
Description: Baseline eTariff Filing:
Baseline Rate Transmission Filing for
Republic Transmission to be effective
12/19/2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5119.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–606–000.
Applicants: AEP Generation
Resources Inc.
Description: § 205(d) Rate Filing: MBR
Tariff, FERC Electric Tariff For MarketBased Sales to be effective 3/1/2014.
Filed Date: 12/19/18.
Accession Number: 20181219–5120.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–607–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Sch. 12 of OA to reflect
termination of Amerigreen Energy, LLC
to be effective 2/19/2019.
E:\FR\FM\27DEN1.SGM
27DEN1
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
Filed Date: 12/19/18.
Accession Number: 20181219–5122.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–608–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ComEd submits revisions to Att. H–13
re: Marengo Battery Wholesale Dist.
Charges to be effective 12/20/2018.
Filed Date: 12/19/18.
Accession Number: 20181219–5138.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19–609–000.
Applicants: Pacific Gas and Electric
Company.
Description: Request for One-time
Tariff Waiver of Pacific Gas and Electric
Company.
Filed Date: 12/19/18.
Accession Number: 20181219–5140.
Comments Due: 5 p.m. ET 1/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–28043 Filed 12–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSK30JT082PROD with NOTICES
[Project No. 1403–064; Project No. 2678–
009]
Notice of Application for Transfer of
License and Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests; Pacific Gas
and Electric Company, Yuba County
Water Agency
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
a. Type of Application: Transfer of
License and Amendment.
b. Project Nos.: 1403–064 and 2678–
009.
c. Date filed: October 17, 2018.
d. Applicants: Pacific Gas and Electric
Company (transferor), Yuba County
Water Agency (transferee).
e. Name of Projects: Narrows Project
(P–1403), Narrows No. 2 Transmission
Line Project (P–2678).
f. Location: Narrows Project—located
at the U.S. Army Corps of Engineers’
(Corps) Englebright Dam on the Yuba
River in Nevada County, California.
Narrows No. 2 Transmission Line
Project—located in the Sierra Nevada
foothills in the Yuba River watershed
adjacent to the Narrows Project in Yuba
and Nevada counties, California, and
occupies 1.28 acres of public land
managed by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicants Contact: For Transferor:
Ms. Annette Faraglia, Chief Counsel
Hydro Generation, Pacific Gas and
Electric Company, 77 Beale Street,
B30A–3005, San Francisco, CA 94105,
415–973–7145, Email: annette.faraglia@
pge.com and Ms. Stephanie Maggard,
Director, Power Generation, Pacific Gas
and Electric Company, 245 Market
Street, N11E–1136, San Francisco, CA
94105, 415–973–2812, Email:
Stephanie.maggard@pge.com.
For Transferee: Mr. Richard P.
Shanahan, General Counsel,
Bartkiewicz, Kronick & Shanahan, Yuba
County Water Agency, 1011 22nd Street,
Sacramento, CA 95816–4907, 916–446–
4254, Email: rps@bkslawfirm.com and
Mr. Curtis Aikens, General Manager,
Yuba County Water Agency, 1220 F
Street, Marysville, CA 95901, 530–741–
5015, Email: caikens@yubawater.org.
i. FERC Contacts: Patricia W. Gillis,
(202) 502–8735 or patricia.gillis@
ferc.gov, or Steven Sachs, (202) 502–
8666 or steven.sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: 30
days from the date that the Commission
issues this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, or protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
66703
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–1403–064
and P–2678–009.
k. Description of Transfer and
Amendment Requests: The applicants
request that the Commission transfer the
Narrows Project No. 1403 from Pacific
Gas and Electric Company to Yuba
County Water Agency. The applicants
also request that the Commission
remove the transmission line for the
Narrows Project and incorporate it into
the license for the Narrows No. 2
Transmission Line Project No. 2678.
Furthermore, the applicants request that
the Commission remove facilities and
lands from the Narrows Project, which
they state are not under the
Commission’s jurisdiction. These
include a substation at the terminus of
the Narrows Project transmission line, a
telephone line connecting the project
and the Corps’ headworks, an access
road, and adjoining lands not needed for
project purposes.
l. Location of the Application: A copy
of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676,
email FERCOnlineSupport@ferc.gov, or
for TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests
and other comments filed, but only
those who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66701-66703]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-28043]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-26-000.
Applicants: Buckleberry Solar, LLC.
Description: Amendment to November 9, 2018 Application for
Authorization Under Section 203 of the Federal Power Act, et al. of
Buckleberry Solar, LLC.
Filed Date: 12/17/18.
Accession Number: 20181217-5404.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1107-006.
Applicants: Pacific Gas and Electric Company.
Description: Updated Market Power Analysis for the CAISO BAA Market
of Pacific Gas and Electric Company.
Filed Date: 12/19/18.
Accession Number: 20181219-5133.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER10-2835-009.
Applicants: Google Energy LLC.
Description: Triennial Market Power Analysis for the SPP Region of
Google Energy LLC.
Filed Date: 12/18/18.
Accession Number: 20181218-5466.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER16-1258-002; ER13-1266-019; ER15-2211-016; ER16-
438-004.
Applicants: Grande Prairie Wind, LLC, Marshall Wind Energy LLC,
CalEnergy, LLC, MidAmerican Energy Services, LLC.
Description: Triennial Market Power Update for the Southwest Power
Pool Region of the BHE Renewables Companies.
Filed Date: 12/18/18.
Accession Number: 20181218-5465.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER17-1376-006.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2018-12-18_Stored Energy Resource--
Type II
[[Page 66702]]
Compliance Filing to be effective 12/1/2017.
Filed Date: 12/18/18.
Accession Number: 20181218-5376.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER17-2386-004.
Applicants: Great Bay Solar I, LLC.
Description: Compliance filing: Compliance Filing to be effective
11/1/2017.
Filed Date: 12/19/18.
Accession Number: 20181219-5052.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER18-554-003.
Applicants: Carville Energy LLC.
Description: Compliance filing: Reactive Service Rate Schedule
Compliance Filing to be effective 3/1/2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5084.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-178-001.
Applicants: PACE RENEWABLE ENERGY 1 LLC.
Description: Tariff Amendment: Supplemental--Ownership Info to be
effective 12/20/2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5029.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-302-001.
Applicants: NTE Southeast Electric Company, LLC.
Description: Second Supplement to December 12, 2018 NTE Southeast
Electric Company, LLC tariff filing [Asset Appendices].
Filed Date: 12/17/18.
Accession Number: 20181217-5387.
Comments Due: 5 p.m. ET 1/7/19.
Docket Numbers: ER19-464-000.
Applicants: Vermillion Power, L.L.C.
Description: Amendment to December 3, 2018 Vermillion Power, L.L.C.
tariff filing.
Filed Date: 12/19/18.
Accession Number: 20181219-5131.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19-592-000.
Applicants: Valentine Solar, LLC.
Description: Baseline eTariff Filing: Valentine Solar Initial
Market-Based Rate Application Filing to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218-5381.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19-593-000.
Applicants: El Paso Electric Company.
Description: Sec. 205(d) Rate Filing: Non-Substantive
Consolidation of Market-Based Rate Tariff Records to be effective 12/
19/2018.
Filed Date: 12/18/18.
Accession Number: 20181218-5390.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19-594-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Daggett Solar 2 LLC SA
No. 224 to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218-5413.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19-595-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Daggett Solar 3 LLC SA
No. 225 to be effective 2/17/2019.
Filed Date: 12/18/18.
Accession Number: 20181218-5414.
Comments Due: 5 p.m. ET 1/8/19.
Docket Numbers: ER19-596-000.
Applicants: CPV Keenan II Renewable Energy Company, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 2/18/2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5027.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-597-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Cancel GIA & DSA LA County Flood
Control District San Gabriel Dam Hydroelectric to be effective 10/31/
2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5032.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-598-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-12-19_SA 3222 OTP-OTP
GIA (J510) to be effective 12/5/2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5081.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-599-000.
Applicants: American Transmission Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI submits Revised
Interconnection Agreement SA No. 3994 to be effective 2/18/2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5103.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-600-000.
Applicants: American Transmission Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI submits a ECSA, Service
Agreement No. 5137 re: GM Cleveland RTU Replacement to be effective 2/
18/2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5114.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-601-000.
Applicants: AEP Energy Partners, Inc.
Description: Sec. 205(d) Rate Filing: MBR Tariff, FERC Electric
Tariff for Market Bases Sales to be effective 3/1/2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5115.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-602-000.
Applicants: Southwest Power Pool, Inc., American Electric Power
Service Corporation.
Description: Sec. 205(d) Rate Filing: Cost Recovery Filing on
Behalf of American Electric Power Service Corp. to be effective 3/1/
2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5116.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-603-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA and ICSA SA
Nos. 5245 and 5250; Queue No. AB2-067/AC1-044 to be effective 12/31/
9998.
Filed Date: 12/19/18.
Accession Number: 20181219-5117.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-604-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Sch.12 of the
OA to reflect termination of GreenHat Energy, LLC to be effective 2/19/
2019.
Filed Date: 12/19/18.
Accession Number: 20181219-5118.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-605-000.
Applicants: Republic Transmission, LLC.
Description: Baseline eTariff Filing: Baseline Rate Transmission
Filing for Republic Transmission to be effective 12/19/2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5119.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-606-000.
Applicants: AEP Generation Resources Inc.
Description: Sec. 205(d) Rate Filing: MBR Tariff, FERC Electric
Tariff For Market-Based Sales to be effective 3/1/2014.
Filed Date: 12/19/18.
Accession Number: 20181219-5120.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-607-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Sch. 12 of OA
to reflect termination of Amerigreen Energy, LLC to be effective 2/19/
2019.
[[Page 66703]]
Filed Date: 12/19/18.
Accession Number: 20181219-5122.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-608-000.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: ComEd submits revisions to
Att. H-13 re: Marengo Battery Wholesale Dist. Charges to be effective
12/20/2018.
Filed Date: 12/19/18.
Accession Number: 20181219-5138.
Comments Due: 5 p.m. ET 1/9/19.
Docket Numbers: ER19-609-000.
Applicants: Pacific Gas and Electric Company.
Description: Request for One-time Tariff Waiver of Pacific Gas and
Electric Company.
Filed Date: 12/19/18.
Accession Number: 20181219-5140.
Comments Due: 5 p.m. ET 1/9/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-28043 Filed 12-26-18; 8:45 am]