Actions Taken at December 6, 2018, Meeting, 66833-66834 [2018-27930]
Download as PDF
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
DEPARTMENT OF STATE
[Public Notice: 10643]
Notice of Determinations; Culturally
Significant Objects Imported for
Exhibition—Determinations: ‘‘Faith and
Empire: Art and Politics in Tibetan
Buddhism’’ Exhibition
Notice is hereby given of the
following determinations: I hereby
determine that certain objects to be
included in the exhibition ‘‘Faith and
Empire: Art and Politics in Tibetan
Buddhism,’’ imported from abroad for
temporary exhibition within the United
States, are of cultural significance. The
objects are imported pursuant to loan
agreements with the foreign owners or
custodians. I also determine that the
exhibition or display of the exhibit
objects at The Rubin Museum of Art,
New York, New York, from on or about
February 1, 2019, until on or about July
15, 2019, and at possible additional
exhibitions or venues yet to be
determined, is in the national interest.
I have ordered that Public Notice of
these determinations be published in
the Federal Register.
FOR FURTHER INFORMATION CONTACT:
Elliot Chiu, Attorney-Adviser, Office of
the Legal Adviser, U.S. Department of
State (telephone: 202–632–6471; email:
section2459@state.gov). The mailing
address is U.S. Department of State, L/
PD, SA–5, Suite 5H03, Washington, DC
20522–0505.
SUPPLEMENTARY INFORMATION: The
foregoing determinations were made
pursuant to the authority vested in me
by the Act of October 19, 1965 (79 Stat.
985; 22 U.S.C. 2459), E.O. 12047 of
March 27, 1978, the Foreign Affairs
Reform and Restructuring Act of 1998
(112 Stat. 2681, et seq.; 22 U.S.C. 6501
note, et seq.), Delegation of Authority
No. 234 of October 1, 1999, Delegation
of Authority No. 236–3 of August 28,
2000, and Delegation of Authority No.
236–21 of December 14, 2018.
SUMMARY:
Jennifer Z. Galt,
Principal Deputy Assistant Secretary for
Educational and Cultural Affairs, Department
of State.
[FR Doc. 2018–27946 Filed 12–26–18; 8:45 am]
khammond on DSK30JT082PROD with NOTICES
BILLING CODE 4710–05–P
SURFACE TRANSPORTATION BOARD
Decided: December 20, 2018.
[Docket No. FD 36260]
Gateway Industrial Railroad, LLC—
Acquisition and Operation
Exemption—Avatar Corporation
Gateway Industrial Railway, LLC
(GIRR), a noncarrier, has filed a verified
VerDate Sep<11>2014
17:14 Dec 26, 2018
notice of exemption 1 under 49 CFR
1150.31 to acquire and operate by
agreement with Avatar Corporation
approximately 2,400 feet (0.46 mile) of
existing railroad right-of-way and
trackage and transloading facilities in
University Park, Ill. (the trackage).
According to GIRR, there are no
mileposts associated with the trackage.
GIRR states that the trackage is used to
interchange with Canadian National
Railroad. GIRR further states that Avatar
Corporation ships outbound shipments
via truck and rail, and that it is
anticipated that GIRR will service
nearby companies.
GIRR asserts that, because the
trackage in question will constitute its
entire line of railroad, this trackage is a
line of railroad under 49 U.S.C. 10901,
rather than spur, switching, or side
tracks under 49 U.S.C. 10906.2
GIRR certifies that its projected
annual revenues as a result of this
transaction will not exceed those that
would qualify it as a Class III rail carrier
and will not exceed $5 million.
GIRR states that the transaction is
scheduled to be consummated on or
before December 14, 2018. However, the
earliest this transaction may be
consummated is January 10, 2019, the
effective date of the exemption (30 days
after the verified notice was filed).
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than January 3, 2019 (at
least seven days before the exemption
becomes effective).
An original and 10 copies of all
pleadings, referring to Docket No.
36260, must be filed with the Surface
Transportation Board, 395 E Street SW,
Washington, DC 20423–0001. In
addition, one copy of each pleading
must be served on David C. Dillon,
Dillon & Nash, Ltd., 3100 Dundee Road,
Suite 508, Northbrook, IL 60062.
According to GIRR, this action is
categorically excluded from
environmental review under 49 CFR
1105.6(c) and from historic reporting
requirements under 49 CFR 1105.8(b).
Board decisions and notices are
available at www.stb.gov.
Jkt 247001
1 GIRR supplemented its verified notice of
exemption on December 18, 2018.
2 See Effingham R.R.—Pet. for Declaratory
Order—Constr. at Effingham, Ill., NOR 41986 et al.
(STB served Sept. 18, 1998), aff’d sub nom. United
Transp. Union-Ill. Legislative Bd. v. STB, 183 F.3d
606 (7th Cir. 1999).
PO 00000
Frm 00163
Fmt 4703
Sfmt 4703
66833
By the Board, Allison C. Davis, Acting
Director, Office of Proceedings.
Kenyatta Clay,
Clearance Clerk.
[FR Doc. 2018–28045 Filed 12–26–18; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Actions Taken at December 6, 2018,
Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on December 6, 2018, in
Harrisburg, Pennsylvania, the
Commission approved or tabled the
applications of certain water resources
projects, and took additional actions, as
set forth in the SUPPLEMENTARY
INFORMATION below.
DATES: December 6, 2018.
ADDRESSES: Susquehanna River Basin
Commission, 4423 N. Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT: Ava
Stoops, Administrative Specialist,
telephone: 717–238–0423; fax: 717–
238–2436; srbc@srbc.net. Regular mail
inquiries may be sent to the above
address. See also Commission website at
www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to the actions taken on projects
identified in the summary above and the
listings below, the following items were
also presented or acted upon at the
business meeting: (1) Adopting the
independent financial audit report for
fiscal year 2018; (2) approval of several
grant agreements; (3) adoption of a
resolution urging President Trump and
the United States Congress to provide
full funding for the national
Groundwater and Streamflow
Information Program, thereby
supporting the Susquehanna Flood
Forecast & Warning System; (4)
adopting a resolution approving a
consumptive use mitigation project
located in Lancaster County, Pa. and
approving the signing of a water supply
agreement with the Lancaster County
Solid Waste Management Authority; (5)
adopting a resolution deferring updates
to the Comprehensive Plan for the Water
Resources of the Susquehanna River
Basin until 2021; (6) approving a request
for waiver of 18 CFR 806.31, and (7)
approving a settlement with EQT
Production Company for $120,000.
SUMMARY:
E:\FR\FM\27DEN1.SGM
27DEN1
66834
Federal Register / Vol. 83, No. 247 / Thursday, December 27, 2018 / Notices
khammond on DSK30JT082PROD with NOTICES
Project Applications Approved
The Commission approved the
following project applications:
1. Project Sponsor and Facility: City
of Aberdeen, Harford County, Md.
Modification to extend the approval
term of the surface water withdrawal
approval (Docket No. 20021210) to be
coterminous with a revised Maryland
Department of the Environment State
Water Appropriation and Use Permit for
the Aberdeen Proving Ground-Aberdeen
Area.
2. Project Sponsor and Facility: City
of Aberdeen, Harford County, Md.
Modification to extend the approval
term of the consumptive use approval
(Docket No. 20021210) to be
coterminous with a revised Maryland
Department of the Environment State
Water Appropriation and Use Permit for
the Aberdeen Proving Ground-Aberdeen
Area.
3. Project Sponsor and Facility:
Adams & Hollenbeck Waterworks, LLC
(Salt Lick Creek), New Milford
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 0.720 mgd (peak
day) (Docket No. 20141209).
4. Project Sponsor and Facility: ARD
Operating, LLC (Pine Creek), Watson
Township, Lycoming County, Pa.
Application for renewal of surface water
withdrawal of up to 0.720 mgd (peak
day) (Docket No. 20141201).
5. Project Sponsor and Facility:
Bloomfield Borough Water Authority,
Bloomfield Borough, Perry County, Pa.
Application for groundwater
withdrawal of up to 0.055 mgd (30-day
average) from Perry Village Well 2.
6. Project Sponsor and Facility:
Denver Borough Authority, Denver
Borough, Lancaster County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.098 mgd (30-day
average) from Well 2 (Docket No.
19890104).
7. Project Sponsor and Facility:
Denver Borough Authority, Denver
Borough, Lancaster County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.092 mgd (30-day
average) from Well 3 (Docket No.
19890104).
8. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
Pa. Application for renewal of
groundwater withdrawal of up to 0.045
mgd (30-day average) from Well 10
(Docket No. 19890101).
9. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
Pa. Application for renewal of
groundwater withdrawal of up to 0.059
VerDate Sep<11>2014
17:14 Dec 26, 2018
Jkt 247001
mgd (30-day average) from Well 9
(Docket No. 19890101).
10. Project Sponsor and Facility:
Eclipse Resources–PA, LP (Pine Creek),
Gaines Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 3.000 mgd (peak
day).
11. Project Sponsor and Facility:
Masonic Village at Elizabethtown, West
Donegal Township, Lancaster County,
Pa. Modification to increase
consumptive use by an additional 0.055
mgd (peak day), for a total consumptive
use of up to 0.230 mgd (peak day)
(Docket No. 20030811).
12. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Seeley
Creek), Wells Township, Bradford
County, Pa. Application for renewal of
surface water withdrawal of up to 0.750
mgd (peak day) (Docket No. 20141212).
13. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Wyalusing
Creek), Stevens Township, Bradford
County, Pa. Application for renewal of
surface water withdrawal of up to 1.500
mgd (peak day) (Docket No. 20141213).
14. Project Sponsor and Facility:
Schuylkill Energy Resources, Inc.,
Mahanoy Township, Schuylkill County,
Pa. Application for renewal of
groundwater withdrawal of up to 5.000
mgd (30-day average) from Maple Hill
Mine Shaft Well (Docket No. 19870101).
15. Project Sponsor and Facility:
Schuylkill Energy Resources, Inc.,
Mahanoy Township, Schuylkill County,
Pa. Application for renewal of
consumptive use of up to 2.550 mgd
(peak day) (Docket No. 19870101).
16. Project Sponsor and Facility:
SWEPI LP (Cowanesque River), Nelson
Township, Tioga County, Pa.
Application for renewal of surface water
withdrawal of up to 0.533 mgd (peak
day) (Docket No. 20141211).
17. Project Sponsor and Facility:
Tenaska Resources, LLC (Cowanesque
River), Westfield Township, Tioga
County, Pa. Application for renewal of
surface water withdrawal of up to 0.400
mgd (peak day) (Docket No. 20141214).
Project Applications Tabled
The Commission tabled action on the
following project applications:
1. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Beech Mountain System, Butler
Township, Luzerne County, Pa.
Application for groundwater
withdrawal of up to 0.144 mgd (30-day
average) from Beech Mountain Well 1.
2. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Beech Mountain System, Butler
Township, Luzerne County, Pa.
Application for groundwater
PO 00000
Frm 00164
Fmt 4703
Sfmt 4703
withdrawal of up to 0.144 mgd (30-day
average) from Beech Mountain Well 2.
3. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Beech Mountain System, Butler
Township, Luzerne County, Pa.
Application for groundwater
withdrawal of up to 0.124 mgd (30-day
average) from Beech Mountain Well 3.
Project Involving a Diversion
The Commission approved the
following project application involving
a diversion:
1. Project Sponsor and Facility: City
of Aberdeen, Harford County, Md.
Modification to extend the approval
term of the out-of-basin diversion
approval (Docket No. 20021210) to be
coterminous with a revised Maryland
Department of the Environment State
Water Appropriation and Use Permit for
the Aberdeen Proving Ground-Aberdeen
Area.
Commission-Initiated Project Approval
Modifications
The Commission approved the
following project approval
modifications:
1. Project Sponsor and Facility: Fox
Hill Country Club, Exeter Borough,
Luzerne County, Pa. Conforming the
grandfathering amount with the
forthcoming determination for a
groundwater withdrawal of up to 0.125
mgd (30-day average) from the Halfway
House Well (Docket No. 20020605).
2. Project Sponsor and Facility:
Norwich Pharmaceuticals, Inc., Town of
North Norwich, Chenango County, N.Y.
Conforming the grandfathering amount
with the forthcoming determination for
groundwater withdrawals of up to 0.106
mgd (30-day average) from Well 1 and
up to 0.082 mgd (30-day average) from
Well 2 (Docket No. 20050902).
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: December 19, 2018.
Jason E. Oyler,
Acting Secretary to the Commission.
[FR Doc. 2018–27930 Filed 12–26–18; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
[Summary Notice No. 2018–91]
Petition for Exemption; Summary of
Petition Received; Department of the
Air Force
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice.
AGENCY:
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 83, Number 247 (Thursday, December 27, 2018)]
[Notices]
[Pages 66833-66834]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27930]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at December 6, 2018, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on December 6,
2018, in Harrisburg, Pennsylvania, the Commission approved or tabled
the applications of certain water resources projects, and took
additional actions, as set forth in the SUPPLEMENTARY INFORMATION
below.
DATES: December 6, 2018.
ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Ava Stoops, Administrative Specialist,
telephone: 717-238-0423; fax: 717-238-2436; srbc@srbc.net. Regular mail
inquiries may be sent to the above address. See also Commission website
at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects
identified in the summary above and the listings below, the following
items were also presented or acted upon at the business meeting: (1)
Adopting the independent financial audit report for fiscal year 2018;
(2) approval of several grant agreements; (3) adoption of a resolution
urging President Trump and the United States Congress to provide full
funding for the national Groundwater and Streamflow Information
Program, thereby supporting the Susquehanna Flood Forecast & Warning
System; (4) adopting a resolution approving a consumptive use
mitigation project located in Lancaster County, Pa. and approving the
signing of a water supply agreement with the Lancaster County Solid
Waste Management Authority; (5) adopting a resolution deferring updates
to the Comprehensive Plan for the Water Resources of the Susquehanna
River Basin until 2021; (6) approving a request for waiver of 18 CFR
806.31, and (7) approving a settlement with EQT Production Company for
$120,000.
[[Page 66834]]
Project Applications Approved
The Commission approved the following project applications:
1. Project Sponsor and Facility: City of Aberdeen, Harford County,
Md. Modification to extend the approval term of the surface water
withdrawal approval (Docket No. 20021210) to be coterminous with a
revised Maryland Department of the Environment State Water
Appropriation and Use Permit for the Aberdeen Proving Ground-Aberdeen
Area.
2. Project Sponsor and Facility: City of Aberdeen, Harford County,
Md. Modification to extend the approval term of the consumptive use
approval (Docket No. 20021210) to be coterminous with a revised
Maryland Department of the Environment State Water Appropriation and
Use Permit for the Aberdeen Proving Ground-Aberdeen Area.
3. Project Sponsor and Facility: Adams & Hollenbeck Waterworks, LLC
(Salt Lick Creek), New Milford Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 0.720 mgd
(peak day) (Docket No. 20141209).
4. Project Sponsor and Facility: ARD Operating, LLC (Pine Creek),
Watson Township, Lycoming County, Pa. Application for renewal of
surface water withdrawal of up to 0.720 mgd (peak day) (Docket No.
20141201).
5. Project Sponsor and Facility: Bloomfield Borough Water
Authority, Bloomfield Borough, Perry County, Pa. Application for
groundwater withdrawal of up to 0.055 mgd (30-day average) from Perry
Village Well 2.
6. Project Sponsor and Facility: Denver Borough Authority, Denver
Borough, Lancaster County, Pa. Application for renewal of groundwater
withdrawal of up to 0.098 mgd (30-day average) from Well 2 (Docket No.
19890104).
7. Project Sponsor and Facility: Denver Borough Authority, Denver
Borough, Lancaster County, Pa. Application for renewal of groundwater
withdrawal of up to 0.092 mgd (30-day average) from Well 3 (Docket No.
19890104).
8. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, Pa. Application for renewal
of groundwater withdrawal of up to 0.045 mgd (30-day average) from Well
10 (Docket No. 19890101).
9. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, Pa. Application for renewal
of groundwater withdrawal of up to 0.059 mgd (30-day average) from Well
9 (Docket No. 19890101).
10. Project Sponsor and Facility: Eclipse Resources-PA, LP (Pine
Creek), Gaines Township, Tioga County, Pa. Application for surface
water withdrawal of up to 3.000 mgd (peak day).
11. Project Sponsor and Facility: Masonic Village at Elizabethtown,
West Donegal Township, Lancaster County, Pa. Modification to increase
consumptive use by an additional 0.055 mgd (peak day), for a total
consumptive use of up to 0.230 mgd (peak day) (Docket No. 20030811).
12. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Seeley
Creek), Wells Township, Bradford County, Pa. Application for renewal of
surface water withdrawal of up to 0.750 mgd (peak day) (Docket No.
20141212).
13. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Wyalusing Creek), Stevens Township, Bradford County, Pa. Application
for renewal of surface water withdrawal of up to 1.500 mgd (peak day)
(Docket No. 20141213).
14. Project Sponsor and Facility: Schuylkill Energy Resources,
Inc., Mahanoy Township, Schuylkill County, Pa. Application for renewal
of groundwater withdrawal of up to 5.000 mgd (30-day average) from
Maple Hill Mine Shaft Well (Docket No. 19870101).
15. Project Sponsor and Facility: Schuylkill Energy Resources,
Inc., Mahanoy Township, Schuylkill County, Pa. Application for renewal
of consumptive use of up to 2.550 mgd (peak day) (Docket No. 19870101).
16. Project Sponsor and Facility: SWEPI LP (Cowanesque River),
Nelson Township, Tioga County, Pa. Application for renewal of surface
water withdrawal of up to 0.533 mgd (peak day) (Docket No. 20141211).
17. Project Sponsor and Facility: Tenaska Resources, LLC
(Cowanesque River), Westfield Township, Tioga County, Pa. Application
for renewal of surface water withdrawal of up to 0.400 mgd (peak day)
(Docket No. 20141214).
Project Applications Tabled
The Commission tabled action on the following project applications:
1. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech
Mountain System, Butler Township, Luzerne County, Pa. Application for
groundwater withdrawal of up to 0.144 mgd (30-day average) from Beech
Mountain Well 1.
2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech
Mountain System, Butler Township, Luzerne County, Pa. Application for
groundwater withdrawal of up to 0.144 mgd (30-day average) from Beech
Mountain Well 2.
3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Beech
Mountain System, Butler Township, Luzerne County, Pa. Application for
groundwater withdrawal of up to 0.124 mgd (30-day average) from Beech
Mountain Well 3.
Project Involving a Diversion
The Commission approved the following project application involving
a diversion:
1. Project Sponsor and Facility: City of Aberdeen, Harford County,
Md. Modification to extend the approval term of the out-of-basin
diversion approval (Docket No. 20021210) to be coterminous with a
revised Maryland Department of the Environment State Water
Appropriation and Use Permit for the Aberdeen Proving Ground-Aberdeen
Area.
Commission-Initiated Project Approval Modifications
The Commission approved the following project approval
modifications:
1. Project Sponsor and Facility: Fox Hill Country Club, Exeter
Borough, Luzerne County, Pa. Conforming the grandfathering amount with
the forthcoming determination for a groundwater withdrawal of up to
0.125 mgd (30-day average) from the Halfway House Well (Docket No.
20020605).
2. Project Sponsor and Facility: Norwich Pharmaceuticals, Inc.,
Town of North Norwich, Chenango County, N.Y. Conforming the
grandfathering amount with the forthcoming determination for
groundwater withdrawals of up to 0.106 mgd (30-day average) from Well 1
and up to 0.082 mgd (30-day average) from Well 2 (Docket No. 20050902).
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: December 19, 2018.
Jason E. Oyler,
Acting Secretary to the Commission.
[FR Doc. 2018-27930 Filed 12-26-18; 8:45 am]
BILLING CODE 7040-01-P