Notice of Request Under Blanket Authorization: Kern River Gas Transmission Company, 65657-65658 [2018-27731]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–547–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 4311 and
CSA, SA No. 4218; Queue No. AA1–065
to be effective 11/9/2015.
Filed Date: 12/12/18.
Accession Number: 20181212–5254.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–548–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amended ISA, SA No. 5238; Queue No.
AD1–084 to be effective 11/12/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5314.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–549–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits OIA SA No. 2852 & IA SA
No. 5196 to be effective 12/14/2018.
Filed Date: 12/13/18.
Accession Number: 20181213–5000.
Comments Due: 5 p.m. ET 1/3/19.
Docket Numbers: ER19–550–000.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing:
Compliance Filing Related to Tax Cuts
and Jobs Act to be effective 3/21/2018.
Filed Date: 12/13/18.
Accession Number: 20181213–5083.
Comments Due: 5 p.m. ET 1/3/19.
Docket Numbers: ER19–551–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
NSP–CHAK–L-Bluff Ck-LV Bush Repl
Ltr Agmt NOC–556 to be effective
12/14/2018.
Filed Date: 12/13/18.
Accession Number: 20181213–5092.
Comments Due: 5 p.m. ET 1/3/19.
Docket Numbers: ER19–552–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
5241, Non-queue NQ157 to be effective
11/13/2018.
Filed Date: 12/13/18.
Accession Number: 20181213–5124.
Comments Due: 5 p.m. ET 1/3/19.
Docket Numbers: ER19–553–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5242 Non-Queue
NQ158 to be effective 11/13/2018.
Filed Date: 12/13/18.
Accession Number: 20181213–5138.
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
Comments Due: 5 p.m. ET 1/3/19.
Docket Numbers: ER19–554–000.
Applicants: GenOn Energy
Management, LLC, NRG California
South LP.
Description: Application to Recover
Fuel Costs, et al. of GenOn Energy
Management, LLC, et al.
Filed Date: 12/13/18.
Accession Number: 20181213–5184.
Comments Due: 5 p.m. ET 1/3/19.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF19–575–000.
Applicants: UE–00211NJ.
Description: Form 556 of UE–
00211NJ.
Filed Date: 12/13/18.
Accession Number: 20181213–5175.
Comments Due: None-Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 14, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27727 Filed 12–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–23–000]
Notice of Request Under Blanket
Authorization: Kern River Gas
Transmission Company
Take notice that on December 10,
2018, Kern River Gas Transmission
Company (Kern River), 2755 East
Cottonwood Parkway, Suite 300, Salt
Lake City, Utah 84121, filed in Docket
No. CP19–23–000 a prior notice request
pursuant to Kern River’s blanket
authority granted on January 24, 1990,
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
65657
in Docket No. CP89–2048–000 and
sections 157.205 and 157.211 of the
Commission’s regulations under the
Natural Gas Act for authorization to
construct and operate a new delivery
point, the Eaglecrest meter station in
Kern County, California, to serve E&B
Natural Resources Management
Corporation, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Michael
T. Loeffler, Senior Director, Certificates
for Kern River, 1111 South 103rd Street,
Omaha, Nebraska 68124, at (402) 398–
7103.
Kern River states that, pursuant to
Section 284.13(e) of the Commission’s
regulations, it is advising the
Commission that it has provided the
required notice to bypass to both Pacific
Gas and Electric Company, the local
distribution company that is currently
providing service to E&B Natural
Resources Management Corporation,
and to California Public Utilities
Commission, the appropriate regulatory
agency, by sending copies of this
application.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
E:\FR\FM\21DEN1.SGM
21DEN1
65658
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not
be required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: December 14, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27731 Filed 12–20–18; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0087; FRL–9987–
22–OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Leather Finishing Operations
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), NESHAP for
Leather Finishing Operations (EPA ICR
No. 1985.08, OMB Control No. 2060–
0478), to the Office of Management and
Budget (OMB) for review and approval
in accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through December 31, 2018.
Public comments were previously
requested, via the Federal Register, on
June 29, 2017 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
amozie on DSK3GDR082PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before January 22, 2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0083, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
The EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The potential respondents
for this collection of information are
owners or operators of any affected
source with leather finishing operations
subject to 40 CFR part 63, subpart
TTTT. Owners and operators of affected
facilities are required to comply with
reporting and recordkeeping
requirements for the General Provisions
of the NESHAP (40 CFR part 63, subpart
A), as well as for the requirements in 40
CFR part 63, subpart TTTT. This
includes submitting initial notifications,
performance tests and periodic reports
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
and results, and maintaining records of
the occurrence and duration of any
startup, shutdown, or malfunction in
the operation of an affected facility, or
any period during which the monitoring
system is inoperative. These reports are
used by the EPA to determine
compliance with these standards.
Form numbers: None.
Respondents/affected entities: Leather
finishing operations.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
TTTT).
Estimated number of respondents: 4
(total).
Frequency of response: Initially,
occasionally and annually.
Total estimated burden: 138 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $12,500 (per
year), which includes $0 for capital/
startup and/or operation & maintenance
(O&M) costs.
Changes in the estimates: There is an
adjustment decrease in the total
estimated burden as currently identified
in the OMB Inventory of Approved
Burdens. This decrease is not due to any
program changes. The change in the
burden and cost estimates is due to
more accurate estimates of existing
sources based on the EPA’s recent
reevaluation of the source category
inventory as part of a recently proposed
risk and technology review (83 FR
11314, March 14, 2018), which
indicated that several facilities have
shut down since the last ICR renewal
period. These changes result in an
overall decrease in the labor hours,
number of responses, and O&M costs.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018–27582 Filed 12–20–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–SFUND–2005–0008; FRL–9987–
24–OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request;
Emergency Planning and Release
Notification Requirements Under
Emergency Planning and Community
Right-to-Know Act Sections 302, 303,
and 304 (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
SUMMARY:
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 83, Number 245 (Friday, December 21, 2018)]
[Notices]
[Pages 65657-65658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27731]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-23-000]
Notice of Request Under Blanket Authorization: Kern River Gas
Transmission Company
Take notice that on December 10, 2018, Kern River Gas Transmission
Company (Kern River), 2755 East Cottonwood Parkway, Suite 300, Salt
Lake City, Utah 84121, filed in Docket No. CP19-23-000 a prior notice
request pursuant to Kern River's blanket authority granted on January
24, 1990, in Docket No. CP89-2048-000 and sections 157.205 and 157.211
of the Commission's regulations under the Natural Gas Act for
authorization to construct and operate a new delivery point, the
Eaglecrest meter station in Kern County, California, to serve E&B
Natural Resources Management Corporation, all as more fully set forth
in the application which is on file with the Commission and open to
public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Michael T. Loeffler, Senior Director, Certificates for Kern River, 1111
South 103rd Street, Omaha, Nebraska 68124, at (402) 398-7103.
Kern River states that, pursuant to Section 284.13(e) of the
Commission's regulations, it is advising the Commission that it has
provided the required notice to bypass to both Pacific Gas and Electric
Company, the local distribution company that is currently providing
service to E&B Natural Resources Management Corporation, and to
California Public Utilities Commission, the appropriate regulatory
agency, by sending copies of this application.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the
[[Page 65658]]
Secretary of the Commission. Environmental commenters will be placed on
the Commission's environmental mailing list, will receive copies of the
environmental documents, and will be notified of meetings associated
with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of
filed documents on all other parties. However, the non-party commenter
will not receive copies of all documents filed by other parties or
issued by the Commission (except for the mailing of environmental
documents issued by the Commission) and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: December 14, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-27731 Filed 12-20-18; 8:45 am]
BILLING CODE 6717-01-P