Download as PDF 65760 Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices radioactive waste are shipping low-level radioactive waste attributed to others for disposal at a licensed low-level radioactive waste land disposal facility. The public comment period was originally scheduled to close on December 31, 2018. The NRC has decided to extend the public comment period on this document until January 31, 2019, to allow more time for stakeholders to submit their comments. Dated at Rockville, Maryland, this 18th day of December 2018. For the Nuclear Regulatory Commission. John R. Tappert, Director, Division of Decommissioning, Uranium Recovery and Waste Programs, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2018–27630 Filed 12–20–18; 8:45 am] BILLING CODE 7590–01–P I. Obtaining Information and Submitting Comments NUCLEAR REGULATORY COMMISSION A. Obtaining Information Please refer to Docket ID NRC–2018– 0286 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0286. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if that document is available in ADAMS) is provided the first time that document is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. [Docket No. 50–293; NRC–2018–0286] Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station Nuclear Regulatory Commission. ACTION: Notice of receipt; public meeting; and request for comment. AGENCY: On November 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) received the Post-Shutdown Decommissioning Activities Report (PSDAR) for the Pilgrim Nuclear Power Station (Pilgrim). The PSDAR, which includes the Site-Specific Decommissioning Cost Estimate (DCE), provides an overview of the Entergy Nuclear Operations, Inc. (Entergy, the licensee) planned decommissioning activities, schedule, projected costs, and environmental impacts for Pilgrim. The NRC will hold a public meeting to discuss the PSDAR and the DCE and receive comments. DATES: Submit comments by March 21, 2019. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received before this date. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID: NRC–2018–0286. Address questions about Docket IDs in Regulations.gov to Krupskaya Castellon; telephone: 301–287–9221; email: Krupskaya.Castellon@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER SUMMARY: amozie on DSK3GDR082PROD with NOTICES1 section of this document. • Mail comments to: May Ma, Office of Administration, Mail Stop: TWFN–7– A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: John G. Lamb, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555– 0001, telephone: 301–415–3100; email: John.Lamb@nrc.gov. SUPPLEMENTARY INFORMATION: INFORMATION CONTACT VerDate Sep<11>2014 00:00 Dec 21, 2018 Jkt 247001 B. Submitting Comments Please include Docket ID NRC–2018– 0286 in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC posts all comment submissions at https:// www.regulations.gov as well as entering PO 00000 Frm 00139 Fmt 4703 Sfmt 4703 the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Discussion Entergy is the holder of Renewed Facility Operating License No. DPR–35 for Pilgrim. The license provides, among other things, that the facility is subject to all rules, regulations, and orders of the NRC now or hereafter in effect. The facility consists of one boiling-water reactor located in Plymouth, Massachusetts. By letter dated November 10, 2015 (ADAMS Accession No. ML15328A053), the licensee submitted Notification of Permanent Cessation of Power Operations for Pilgrim. In this letter, Entergy notified the NRC of its intent to permanently cease operations at Pilgrim no later than June 1, 2019. On November 16, 2018, Entergy submitted the PSDAR including and the DCE for Pilgrim in accordance with § 50.82(a)(4)(i) of Title 10 of the Code of Federal Regulations (ADAMS Accession No. ML18320A034). The PSDAR includes a description of the planned decommissioning activities, a proposed schedule for their accomplishment, the DCE, and a discussion that provides the basis for concluding that the environmental impacts associated with the site-specific decommissioning activities will be bounded by appropriate, previously issued generic and plant-specific environmental impact statements. III. Request for Comment and Public Meeting The NRC is requesting public comments on the PSDAR including the DCE for Pilgrim. The NRC will conduct a public meeting to discuss the PSDAR including the DCE and receive comments on Tuesday, January 15, 2019, from 6 p.m. until 9 p.m., at the Hotel 1620, 180 Water Street, Plymouth, Massachusetts 02360. The NRC requests that comments that are not provided during the meeting be submitted as noted in section I, ‘‘Obtaining E:\FR\FM\21DEN1.SGM 21DEN1 Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices Information and Submitting Comments’’ of this document in writing by March 21, 2019. Dated at Rockville, Maryland, this 18th day of December 2018. For the Nuclear Regulatory Commission. Douglas A. Broaddus, Chief, Special Projects and Process Branch, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2018–27724 Filed 12–20–18; 8:45 am] BILLING CODE 7590–01–P POSTAL REGULATORY COMMISSION [Docket Nos. CP2019–50; MC2019–47 and CP2019–51; MC2019–48 and CP2019–52; MC2019–49 and CP2019–53; MC2019–50 and CP2019–54; MC2019–51 and CP2019– 55; MC2019–52 and CP2019–56] New Postal Products Postal Regulatory Commission. Notice. AGENCY: ACTION: The Commission is noticing a recent Postal Service filing for the Commission’s consideration concerning a negotiated service agreement. This notice informs the public of the filing, invites public comment, and takes other administrative steps. DATES: Comments are due: December 26, 2018 and December 27, 2018. ADDRESSES: Submit comments electronically via the Commission’s Filing Online system at https:// www.prc.gov. Those who cannot submit comments electronically should contact the person identified in the FOR FURTHER INFORMATION CONTACT section by telephone for advice on filing alternatives. SUMMARY: FOR FURTHER INFORMATION CONTACT: David A. Trissell, General Counsel, at 202–789–6820. SUPPLEMENTARY INFORMATION: The December 26, 2018 comment due date applies to Docket Nos. CP2019–50; MC2019–47 and CP2019–51; MC2019– 48 and CP2019–52; MC2019–49 and CP2019–53; MC2019–50 and CP2019– 54. The December 27, 2018 comment due date applies to Docket Nos. MC2019–51 and CP2019–55; MC2019–52 and CP2019–56. amozie on DSK3GDR082PROD with NOTICES1 Table of Contents I. Introduction II. Docketed Proceeding(s) I. Introduction The Commission gives notice that the Postal Service filed request(s) for the Commission to consider matters related to negotiated service agreement(s). The VerDate Sep<11>2014 00:00 Dec 21, 2018 Jkt 247001 request(s) may propose the addition or removal of a negotiated service agreement from the market dominant or the competitive product list, or the modification of an existing product currently appearing on the market dominant or the competitive product list. Section II identifies the docket number(s) associated with each Postal Service request, the title of each Postal Service request, the request’s acceptance date, and the authority cited by the Postal Service for each request. For each request, the Commission appoints an officer of the Commission to represent the interests of the general public in the proceeding, pursuant to 39 U.S.C. 505 (Public Representative). Section II also establishes comment deadline(s) pertaining to each request. The public portions of the Postal Service’s request(s) can be accessed via the Commission’s website (https:// www.prc.gov). Non-public portions of the Postal Service’s request(s), if any, can be accessed through compliance with the requirements of 39 CFR 3007.301.1 The Commission invites comments on whether the Postal Service’s request(s) in the captioned docket(s) are consistent with the policies of title 39. For request(s) that the Postal Service states concern market dominant product(s), applicable statutory and regulatory requirements include 39 U.S.C. 3622, 39 U.S.C. 3642, 39 CFR part 3010, and 39 CFR part 3020, subpart B. For request(s) that the Postal Service states concern competitive product(s), applicable statutory and regulatory requirements include 39 U.S.C. 3632, 39 U.S.C. 3633, 39 U.S.C. 3642, 39 CFR part 3015, and 39 CFR part 3020, subpart B. Comment deadline(s) for each request appear in section II. II. Docketed Proceeding(s) 1. Docket No(s).: CP2019–50; Filing Title: Notice of United States Postal Service of Filing a Functionally Equivalent Global Plus 4 Negotiated Service Agreement and Application for Non-Public Treatment of Materials Filed Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 CFR 3015.5; Public Representative: Christopher C. Mohr; Comments Due: December 26, 2018. 2. Docket No(s).: MC2019–47 and CP2019–51; Filing Title: USPS Request to Add Priority Mail Contract 495 to Competitive Product List and Notice of 1 See Docket No. RM2018–3, Order Adopting Final Rules Relating to Non-Public Information, June 27, 2018, Attachment A at 19–22 (Order No. 4679). PO 00000 Frm 00140 Fmt 4703 Sfmt 4703 65761 Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Christopher C. Mohr; Comments Due: December 26, 2018. 3. Docket No(s).: MC2019–48 and CP2019–52; Filing Title: USPS Request to Add Priority Mail Express & Priority Mail Contract 78 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Curtis E. Kidd; Comments Due: December 26, 2018. 4. Docket No(s).: MC2019–49 and CP2019–53; Filing Title: USPS Request to Add Priority Mail Express & Priority Mail Contract 79 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Curtis E. Kidd; Comments Due: December 26, 2018. 5. Docket No(s).: MC2019–50 and CP2019–54; Filing Title: USPS Request to Add Priority Mail Express & Priority Mail Contract 80 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Curtis E. Kidd; Comments Due: December 26, 2018. 6. Docket No(s).: MC2019–51 and CP2019–55; Filing Title: USPS Request to Add Priority Mail & First-Class Package Service Contract 92 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Kenneth R. Moeller; Comments Due: December 27, 2018. 7. Docket No(s).: MC2019–52 and CP2019–56; Filing Title: USPS Request to Add Priority Mail & First-Class Package Service Contract 93 to Competitive Product List and Notice of Filing Materials Under Seal; Filing Acceptance Date: December 14, 2018; Filing Authority: 39 U.S.C. 3642, 39 CFR 3020.30 et seq., and 39 CFR 3015.5; Public Representative: Kenneth R. Moeller; Comments Due: December 27, 2018. E:\FR\FM\21DEN1.SGM 21DEN1

Agencies

[Federal Register Volume 83, Number 245 (Friday, December 21, 2018)]
[Notices]
[Pages 65760-65761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27724]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-293; NRC-2018-0286]


Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of receipt; public meeting; and request for comment.

-----------------------------------------------------------------------

SUMMARY: On November 16, 2018, the U.S. Nuclear Regulatory Commission 
(NRC) received the Post-Shutdown Decommissioning Activities Report 
(PSDAR) for the Pilgrim Nuclear Power Station (Pilgrim). The PSDAR, 
which includes the Site-Specific Decommissioning Cost Estimate (DCE), 
provides an overview of the Entergy Nuclear Operations, Inc. (Entergy, 
the licensee) planned decommissioning activities, schedule, projected 
costs, and environmental impacts for Pilgrim. The NRC will hold a 
public meeting to discuss the PSDAR and the DCE and receive comments.

DATES: Submit comments by March 21, 2019. Comments received after this 
date will be considered if it is practical to do so, but the NRC is 
able to ensure consideration only for comments received before this 
date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID: NRC-2018-0286. Address 
questions about Docket IDs in Regulations.gov to Krupskaya Castellon; 
telephone: 301-287-9221; email: Krupskaya.Castellon@nrc.gov. For 
technical questions, contact the individual listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: John G. Lamb, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001, telephone: 301-415-3100; email: John.Lamb@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0286 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0286.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if that document 
is available in ADAMS) is provided the first time that document is 
mentioned in this document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2018-0286 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Discussion

    Entergy is the holder of Renewed Facility Operating License No. 
DPR-35 for Pilgrim. The license provides, among other things, that the 
facility is subject to all rules, regulations, and orders of the NRC 
now or hereafter in effect. The facility consists of one boiling-water 
reactor located in Plymouth, Massachusetts. By letter dated November 
10, 2015 (ADAMS Accession No. ML15328A053), the licensee submitted 
Notification of Permanent Cessation of Power Operations for Pilgrim. In 
this letter, Entergy notified the NRC of its intent to permanently 
cease operations at Pilgrim no later than June 1, 2019.
    On November 16, 2018, Entergy submitted the PSDAR including and the 
DCE for Pilgrim in accordance with Sec.  50.82(a)(4)(i) of Title 10 of 
the Code of Federal Regulations (ADAMS Accession No. ML18320A034). The 
PSDAR includes a description of the planned decommissioning activities, 
a proposed schedule for their accomplishment, the DCE, and a discussion 
that provides the basis for concluding that the environmental impacts 
associated with the site-specific decommissioning activities will be 
bounded by appropriate, previously issued generic and plant-specific 
environmental impact statements.

III. Request for Comment and Public Meeting

    The NRC is requesting public comments on the PSDAR including the 
DCE for Pilgrim. The NRC will conduct a public meeting to discuss the 
PSDAR including the DCE and receive comments on Tuesday, January 15, 
2019, from 6 p.m. until 9 p.m., at the Hotel 1620, 180 Water Street, 
Plymouth, Massachusetts 02360. The NRC requests that comments that are 
not provided during the meeting be submitted as noted in section I, 
``Obtaining

[[Page 65761]]

Information and Submitting Comments'' of this document in writing by 
March 21, 2019.

    Dated at Rockville, Maryland, this 18th day of December 2018.

    For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Special Projects and Process Branch, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.