Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station, 65760-65761 [2018-27724]
Download as PDF
65760
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
radioactive waste are shipping low-level
radioactive waste attributed to others for
disposal at a licensed low-level
radioactive waste land disposal facility.
The public comment period was
originally scheduled to close on
December 31, 2018. The NRC has
decided to extend the public comment
period on this document until January
31, 2019, to allow more time for
stakeholders to submit their comments.
Dated at Rockville, Maryland, this 18th day
of December 2018.
For the Nuclear Regulatory Commission.
John R. Tappert,
Director, Division of Decommissioning,
Uranium Recovery and Waste Programs,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2018–27630 Filed 12–20–18; 8:45 am]
BILLING CODE 7590–01–P
I. Obtaining Information and
Submitting Comments
NUCLEAR REGULATORY
COMMISSION
A. Obtaining Information
Please refer to Docket ID NRC–2018–
0286 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0286.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if that document
is available in ADAMS) is provided the
first time that document is mentioned in
this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
[Docket No. 50–293; NRC–2018–0286]
Entergy Nuclear Operations, Inc.;
Pilgrim Nuclear Power Station
Nuclear Regulatory
Commission.
ACTION: Notice of receipt; public
meeting; and request for comment.
AGENCY:
On November 16, 2018, the
U.S. Nuclear Regulatory Commission
(NRC) received the Post-Shutdown
Decommissioning Activities Report
(PSDAR) for the Pilgrim Nuclear Power
Station (Pilgrim). The PSDAR, which
includes the Site-Specific
Decommissioning Cost Estimate (DCE),
provides an overview of the Entergy
Nuclear Operations, Inc. (Entergy, the
licensee) planned decommissioning
activities, schedule, projected costs, and
environmental impacts for Pilgrim. The
NRC will hold a public meeting to
discuss the PSDAR and the DCE and
receive comments.
DATES: Submit comments by March 21,
2019. Comments received after this date
will be considered if it is practical to do
so, but the NRC is able to ensure
consideration only for comments
received before this date.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID: NRC–2018–0286. Address
questions about Docket IDs in
Regulations.gov to Krupskaya Castellon;
telephone: 301–287–9221; email:
Krupskaya.Castellon@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
SUMMARY:
amozie on DSK3GDR082PROD with NOTICES1
section of this
document.
• Mail comments to: May Ma, Office
of Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT: John
G. Lamb, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington DC 20555–
0001, telephone: 301–415–3100; email:
John.Lamb@nrc.gov.
SUPPLEMENTARY INFORMATION:
INFORMATION CONTACT
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
B. Submitting Comments
Please include Docket ID NRC–2018–
0286 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
PO 00000
Frm 00139
Fmt 4703
Sfmt 4703
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Discussion
Entergy is the holder of Renewed
Facility Operating License No. DPR–35
for Pilgrim. The license provides, among
other things, that the facility is subject
to all rules, regulations, and orders of
the NRC now or hereafter in effect. The
facility consists of one boiling-water
reactor located in Plymouth,
Massachusetts. By letter dated
November 10, 2015 (ADAMS Accession
No. ML15328A053), the licensee
submitted Notification of Permanent
Cessation of Power Operations for
Pilgrim. In this letter, Entergy notified
the NRC of its intent to permanently
cease operations at Pilgrim no later than
June 1, 2019.
On November 16, 2018, Entergy
submitted the PSDAR including and the
DCE for Pilgrim in accordance with
§ 50.82(a)(4)(i) of Title 10 of the Code of
Federal Regulations (ADAMS Accession
No. ML18320A034). The PSDAR
includes a description of the planned
decommissioning activities, a proposed
schedule for their accomplishment, the
DCE, and a discussion that provides the
basis for concluding that the
environmental impacts associated with
the site-specific decommissioning
activities will be bounded by
appropriate, previously issued generic
and plant-specific environmental
impact statements.
III. Request for Comment and Public
Meeting
The NRC is requesting public
comments on the PSDAR including the
DCE for Pilgrim. The NRC will conduct
a public meeting to discuss the PSDAR
including the DCE and receive
comments on Tuesday, January 15,
2019, from 6 p.m. until 9 p.m., at the
Hotel 1620, 180 Water Street, Plymouth,
Massachusetts 02360. The NRC requests
that comments that are not provided
during the meeting be submitted as
noted in section I, ‘‘Obtaining
E:\FR\FM\21DEN1.SGM
21DEN1
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
Information and Submitting Comments’’
of this document in writing by March
21, 2019.
Dated at Rockville, Maryland, this 18th day
of December 2018.
For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Special Projects and Process Branch,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2018–27724 Filed 12–20–18; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket Nos. CP2019–50; MC2019–47 and
CP2019–51; MC2019–48 and CP2019–52;
MC2019–49 and CP2019–53; MC2019–50
and CP2019–54; MC2019–51 and CP2019–
55; MC2019–52 and CP2019–56]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
a negotiated service agreement. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: December
26, 2018 and December 27, 2018.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION: The
December 26, 2018 comment due date
applies to Docket Nos. CP2019–50;
MC2019–47 and CP2019–51; MC2019–
48 and CP2019–52; MC2019–49 and
CP2019–53; MC2019–50 and CP2019–
54.
The December 27, 2018 comment due
date applies to Docket Nos. MC2019–51
and CP2019–55; MC2019–52 and
CP2019–56.
amozie on DSK3GDR082PROD with NOTICES1
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
request(s) may propose the addition or
removal of a negotiated service
agreement from the market dominant or
the competitive product list, or the
modification of an existing product
currently appearing on the market
dominant or the competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
the interests of the general public in the
proceeding, pursuant to 39 U.S.C. 505
(Public Representative). Section II also
establishes comment deadline(s)
pertaining to each request.
The public portions of the Postal
Service’s request(s) can be accessed via
the Commission’s website (https://
www.prc.gov). Non-public portions of
the Postal Service’s request(s), if any,
can be accessed through compliance
with the requirements of 39 CFR
3007.301.1
The Commission invites comments on
whether the Postal Service’s request(s)
in the captioned docket(s) are consistent
with the policies of title 39. For
request(s) that the Postal Service states
concern market dominant product(s),
applicable statutory and regulatory
requirements include 39 U.S.C. 3622, 39
U.S.C. 3642, 39 CFR part 3010, and 39
CFR part 3020, subpart B. For request(s)
that the Postal Service states concern
competitive product(s), applicable
statutory and regulatory requirements
include 39 U.S.C. 3632, 39 U.S.C. 3633,
39 U.S.C. 3642, 39 CFR part 3015, and
39 CFR part 3020, subpart B. Comment
deadline(s) for each request appear in
section II.
II. Docketed Proceeding(s)
1. Docket No(s).: CP2019–50; Filing
Title: Notice of United States Postal
Service of Filing a Functionally
Equivalent Global Plus 4 Negotiated
Service Agreement and Application for
Non-Public Treatment of Materials Filed
Under Seal; Filing Acceptance Date:
December 14, 2018; Filing Authority: 39
CFR 3015.5; Public Representative:
Christopher C. Mohr; Comments Due:
December 26, 2018.
2. Docket No(s).: MC2019–47 and
CP2019–51; Filing Title: USPS Request
to Add Priority Mail Contract 495 to
Competitive Product List and Notice of
1 See Docket No. RM2018–3, Order Adopting
Final Rules Relating to Non-Public Information,
June 27, 2018, Attachment A at 19–22 (Order No.
4679).
PO 00000
Frm 00140
Fmt 4703
Sfmt 4703
65761
Filing Materials Under Seal; Filing
Acceptance Date: December 14, 2018;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3020.30 et seq., and 39 CFR 3015.5;
Public Representative: Christopher C.
Mohr; Comments Due: December 26,
2018.
3. Docket No(s).: MC2019–48 and
CP2019–52; Filing Title: USPS Request
to Add Priority Mail Express & Priority
Mail Contract 78 to Competitive Product
List and Notice of Filing Materials
Under Seal; Filing Acceptance Date:
December 14, 2018; Filing Authority: 39
U.S.C. 3642, 39 CFR 3020.30 et seq., and
39 CFR 3015.5; Public Representative:
Curtis E. Kidd; Comments Due:
December 26, 2018.
4. Docket No(s).: MC2019–49 and
CP2019–53; Filing Title: USPS Request
to Add Priority Mail Express & Priority
Mail Contract 79 to Competitive Product
List and Notice of Filing Materials
Under Seal; Filing Acceptance Date:
December 14, 2018; Filing Authority: 39
U.S.C. 3642, 39 CFR 3020.30 et seq., and
39 CFR 3015.5; Public Representative:
Curtis E. Kidd; Comments Due:
December 26, 2018.
5. Docket No(s).: MC2019–50 and
CP2019–54; Filing Title: USPS Request
to Add Priority Mail Express & Priority
Mail Contract 80 to Competitive Product
List and Notice of Filing Materials
Under Seal; Filing Acceptance Date:
December 14, 2018; Filing Authority: 39
U.S.C. 3642, 39 CFR 3020.30 et seq., and
39 CFR 3015.5; Public Representative:
Curtis E. Kidd; Comments Due:
December 26, 2018.
6. Docket No(s).: MC2019–51 and
CP2019–55; Filing Title: USPS Request
to Add Priority Mail & First-Class
Package Service Contract 92 to
Competitive Product List and Notice of
Filing Materials Under Seal; Filing
Acceptance Date: December 14, 2018;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3020.30 et seq., and 39 CFR 3015.5;
Public Representative: Kenneth R.
Moeller; Comments Due: December 27,
2018.
7. Docket No(s).: MC2019–52 and
CP2019–56; Filing Title: USPS Request
to Add Priority Mail & First-Class
Package Service Contract 93 to
Competitive Product List and Notice of
Filing Materials Under Seal; Filing
Acceptance Date: December 14, 2018;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3020.30 et seq., and 39 CFR 3015.5;
Public Representative: Kenneth R.
Moeller; Comments Due: December 27,
2018.
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 83, Number 245 (Friday, December 21, 2018)]
[Notices]
[Pages 65760-65761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27724]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-293; NRC-2018-0286]
Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of receipt; public meeting; and request for comment.
-----------------------------------------------------------------------
SUMMARY: On November 16, 2018, the U.S. Nuclear Regulatory Commission
(NRC) received the Post-Shutdown Decommissioning Activities Report
(PSDAR) for the Pilgrim Nuclear Power Station (Pilgrim). The PSDAR,
which includes the Site-Specific Decommissioning Cost Estimate (DCE),
provides an overview of the Entergy Nuclear Operations, Inc. (Entergy,
the licensee) planned decommissioning activities, schedule, projected
costs, and environmental impacts for Pilgrim. The NRC will hold a
public meeting to discuss the PSDAR and the DCE and receive comments.
DATES: Submit comments by March 21, 2019. Comments received after this
date will be considered if it is practical to do so, but the NRC is
able to ensure consideration only for comments received before this
date.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID: NRC-2018-0286. Address
questions about Docket IDs in Regulations.gov to Krupskaya Castellon;
telephone: 301-287-9221; email: Krupskaya.Castellon@nrc.gov. For
technical questions, contact the individual listed in the FOR FURTHER
INFORMATION CONTACT section of this document.
Mail comments to: May Ma, Office of Administration, Mail
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: John G. Lamb, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC
20555-0001, telephone: 301-415-3100; email: John.Lamb@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0286 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0286.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if that document
is available in ADAMS) is provided the first time that document is
mentioned in this document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2018-0286 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Discussion
Entergy is the holder of Renewed Facility Operating License No.
DPR-35 for Pilgrim. The license provides, among other things, that the
facility is subject to all rules, regulations, and orders of the NRC
now or hereafter in effect. The facility consists of one boiling-water
reactor located in Plymouth, Massachusetts. By letter dated November
10, 2015 (ADAMS Accession No. ML15328A053), the licensee submitted
Notification of Permanent Cessation of Power Operations for Pilgrim. In
this letter, Entergy notified the NRC of its intent to permanently
cease operations at Pilgrim no later than June 1, 2019.
On November 16, 2018, Entergy submitted the PSDAR including and the
DCE for Pilgrim in accordance with Sec. 50.82(a)(4)(i) of Title 10 of
the Code of Federal Regulations (ADAMS Accession No. ML18320A034). The
PSDAR includes a description of the planned decommissioning activities,
a proposed schedule for their accomplishment, the DCE, and a discussion
that provides the basis for concluding that the environmental impacts
associated with the site-specific decommissioning activities will be
bounded by appropriate, previously issued generic and plant-specific
environmental impact statements.
III. Request for Comment and Public Meeting
The NRC is requesting public comments on the PSDAR including the
DCE for Pilgrim. The NRC will conduct a public meeting to discuss the
PSDAR including the DCE and receive comments on Tuesday, January 15,
2019, from 6 p.m. until 9 p.m., at the Hotel 1620, 180 Water Street,
Plymouth, Massachusetts 02360. The NRC requests that comments that are
not provided during the meeting be submitted as noted in section I,
``Obtaining
[[Page 65761]]
Information and Submitting Comments'' of this document in writing by
March 21, 2019.
Dated at Rockville, Maryland, this 18th day of December 2018.
For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Special Projects and Process Branch, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2018-27724 Filed 12-20-18; 8:45 am]