Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, Village of Lyndonville Electric Department, 65649-65650 [2018-27650]
Download as PDF
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27733 Filed 12–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2839–015]
amozie on DSK3GDR082PROD with NOTICES1
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions, Village
of Lyndonville Electric Department
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2839–015.
c. Date filed: May 26, 2017.
d. Applicant: Village of Lyndonville
Electric Department (Lyndonville).
e. Name of Project: Great Falls
Hydroelectric Project.
f. Location: On the Passumpsic River,
in the Town of Lyndon, Caledonia
County, Vermont. There are no federal
or tribal lands within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Bill
Humphrey, Village of Lyndonville
Electric Department, 119 Park Avenue,
Lyndonville, VT 05851; (802) 626–3366.
i. FERC Contact: Bill Connelly, (202)
502–8587 or william.connelly@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions using the
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2839–015.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The existing Great Falls Project
consists of: (1) A 160-foot-long, 32-foothigh curved, concrete dam with 2-foothigh flashboards; (2) an approximately
12-acre impoundment having a storage
capacity of 135-acre-feet at a normal full
pond water surface elevation of 668.38
feet above mean sea level; (3) a 6-footlong, 15-foot-wide, 28-foot-high,
concrete headworks structure with two
5-foot-wide, 8-foot-high wood and iron
headgates; (4) an 8-foot-long, 8-footwide, 12-foot-high brick headworks gate
house; (5) an approximately 282-footlong, 22-foot-wide power canal that is
covered for 70 feet; (6) one 4-foot-wide,
4-foot-high, wood and iron skimming
sluice gate and one 4-foot-wide, 5-foothigh, wood and iron sand sluice gate; (7)
a penstock intake with two 15-footwide, 22-foot-high trashracks with 1.5inch clear bar spacing; (8) a 22.5-footlong, 10-foot-diameter metal penstock
that reduces to a 165-foot-long, 7.33foot-diameter metal penstock that
trifurcates to one 22-foot-long, 6-foot
diameter, and two 9-foot-long, 3-footdiameter penstocks; (9) a 47-foot-long,
25-foot-wide powerhouse containing a
1,350-kilowatt (kW) turbine-generator
unit and a 40-foot-long, 40-foot-wide
concrete powerhouse containing two
350-kW turbine-generator units, for a
total capacity of 2,050-kW; (10) a 380foot-long, 2.4-kilovolt (kV) aboveground transmission line that connects
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
65649
the turbine-generator leads to a
substation step-up transformer where
the project is interconnected with
Lyndonville’s distribution system; and
(11) appurtenant facilities. Lyndonville
operates the project in a run-of-river
mode with an annual average energy
production of approximately 3,960
megawatt-hours.
Lyndonville proposes to increase the
existing year-round minimum flow to
the bypassed reach from 10 cubic feet
per second (cfs) to 62 cfs (or inflow,
whichever is less) to maintain habitat
for fish and aquatic organisms. In
addition, Lyndonville proposes to
continue to release a minimum flow of
75 cfs (or inflow, whichever is less)
through the powerhouse during project
shutdowns to protect fish and aquatic
resources in the downstream reach.
Lyndonville proposes to install an
automatic pond level control system to
improve control of impoundment levels
and instantaneous run-of-river
operation. Lyndonville also proposes to
develop a minimum flow monitoring
plan to ensure adequate flow is
provided to the bypassed reach and
downstream of the powerhouse.
Lyndonville also proposes several
measures related to recreation
resources, including: (1) Constructing
and maintaining a new carry-in boat
access trail downstream of the tailrace,
on the west bank of the Passumpsic
River; (2) designating a new bank
fishing area; (3) installing a designated
parking area outside of the project gates
along the access road to the project; and
(4) installing an informational kiosk
identifying recreational amenities at the
project. To evaluate the adequacy of
project recreation facilities, Lyndonville
proposes to conduct a recreation
inventory, use and needs assessment
within one year of completion of
recreational improvements.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
E:\FR\FM\21DEN1.SGM
21DEN1
65650
Federal Register / Vol. 83, No. 245 / Friday, December 21, 2018 / Notices
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Procedural Schedule: The
application will be processed according
to the following revised schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions .......................................
Commission issues Environmental Assessment ..........................................................................................................................
Comments on Environmental Assessment ...................................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of this notice.
p. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: December 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27650 Filed 12–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–480–000]
amozie on DSK3GDR082PROD with NOTICES1
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Annova LNG Brownsville
Project: Annova LNG Common
Infrastructure, LLC, Annova LNG
Brownsville A, LLC, Annova LNG
Brownsville B, LLC, Annova LNG
Brownsville C, LLC
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Annova LNG Brownsville Project
(referred to as the Annova LNG Project,
or Project). Annova LNG Common
Infrastructure LLC, Annova LNG
VerDate Sep<11>2014
00:00 Dec 21, 2018
Jkt 247001
Brownsville A LLC, Annova LNG
Brownsville B LLC, and Annova LNG
Brownsville C, LLC (collectively
referred to as Annova LNG) request
authorization to site, construct, and
operate liquefied natural gas (LNG)
export facilities on the Brownsville Ship
Channel in Cameron County, Texas. The
Project would include a new LNG
export terminal capable of producing up
to 6.95 million metric tons per year of
LNG for export. The LNG terminal
would receive natural gas to the export
facilities from an as-yet undetermined
third-party intrastate pipeline.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the Project would result in some adverse
environmental impacts. However, with
the mitigation measures recommended
in the EIS and Annova’s proposed
mitigation measures, impacts in the
Project area would be avoided or
minimized, and would not be
significant. In addition, the Annova
LNG Project, combined with other
projects in the geographic scope,
including the Texas LNG and Rio
Grande LNG Projects, would result in
certain significant cumulative impacts.
Construction and operation of the
Project would result in mostly
temporary or short-term environmental
impacts; however, some long-term and
permanent environmental impacts
would occur.
The U.S. Army Corps of Engineers;
U.S. Coast Guard; U.S. Department of
Transportation; U.S. Environmental
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
February 2019.
August 2019.
September 2019.
Protection Agency; U.S. Fish and
Wildlife Service; National Parks Service;
the National Oceanic and Atmospheric
Administration, National Marine
Fisheries Service; Federal Aviation
Administration; and U.S. Department of
Energy participated as cooperating
agencies in the preparation of the EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis. Although the cooperating
agencies provided input to the
conclusions and recommendations
presented in the draft EIS, the agencies
will present their own conclusions and
recommendations in their respective
Records of Decision for the project.
The draft EIS addresses the potential
environmental effects of the
construction and operation of the
following Project facilities:
• Pipeline meter station;
• Liquefaction facilities;
• Two LNG storage tanks;
• Marine and LNG transfer facilities;
• Control room, administration/
maintenance building;
• Site access road; and
• Utilities (power, water, and
communication systems).
The Commission mailed a copy of the
Notice of Availability to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The draft EIS is only
available in electronic format. It may be
viewed and downloaded from the
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 83, Number 245 (Friday, December 21, 2018)]
[Notices]
[Pages 65649-65650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27650]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2839-015]
Notice of Application Accepted for Filing, Soliciting Motions To
Intervene and Protests, Ready for Environmental Analysis, and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions, Village of Lyndonville Electric Department
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2839-015.
c. Date filed: May 26, 2017.
d. Applicant: Village of Lyndonville Electric Department
(Lyndonville).
e. Name of Project: Great Falls Hydroelectric Project.
f. Location: On the Passumpsic River, in the Town of Lyndon,
Caledonia County, Vermont. There are no federal or tribal lands within
the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Bill Humphrey, Village of Lyndonville
Electric Department, 119 Park Avenue, Lyndonville, VT 05851; (802) 626-
3366.
i. FERC Contact: Bill Connelly, (202) 502-8587 or
william.connelly@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and prescriptions: 60 days from
the issuance date of this notice; reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests, comments, recommendations, terms and
conditions, and prescriptions using the Commission's eFiling system at
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket number P-2839-015.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The existing Great Falls Project consists of: (1) A 160-foot-
long, 32-foot-high curved, concrete dam with 2-foot-high flashboards;
(2) an approximately 12-acre impoundment having a storage capacity of
135-acre-feet at a normal full pond water surface elevation of 668.38
feet above mean sea level; (3) a 6-foot-long, 15-foot-wide, 28-foot-
high, concrete headworks structure with two 5-foot-wide, 8-foot-high
wood and iron headgates; (4) an 8-foot-long, 8-foot-wide, 12-foot-high
brick headworks gate house; (5) an approximately 282-foot-long, 22-
foot-wide power canal that is covered for 70 feet; (6) one 4-foot-wide,
4-foot-high, wood and iron skimming sluice gate and one 4-foot-wide, 5-
foot-high, wood and iron sand sluice gate; (7) a penstock intake with
two 15-foot-wide, 22-foot-high trashracks with 1.5-inch clear bar
spacing; (8) a 22.5-foot-long, 10-foot-diameter metal penstock that
reduces to a 165-foot-long, 7.33-foot-diameter metal penstock that
trifurcates to one 22-foot-long, 6-foot diameter, and two 9-foot-long,
3-foot-diameter penstocks; (9) a 47-foot-long, 25-foot-wide powerhouse
containing a 1,350-kilowatt (kW) turbine-generator unit and a 40-foot-
long, 40-foot-wide concrete powerhouse containing two 350-kW turbine-
generator units, for a total capacity of 2,050-kW; (10) a 380-foot-
long, 2.4-kilovolt (kV) above-ground transmission line that connects
the turbine-generator leads to a substation step-up transformer where
the project is interconnected with Lyndonville's distribution system;
and (11) appurtenant facilities. Lyndonville operates the project in a
run-of-river mode with an annual average energy production of
approximately 3,960 megawatt-hours.
Lyndonville proposes to increase the existing year-round minimum
flow to the bypassed reach from 10 cubic feet per second (cfs) to 62
cfs (or inflow, whichever is less) to maintain habitat for fish and
aquatic organisms. In addition, Lyndonville proposes to continue to
release a minimum flow of 75 cfs (or inflow, whichever is less) through
the powerhouse during project shutdowns to protect fish and aquatic
resources in the downstream reach. Lyndonville proposes to install an
automatic pond level control system to improve control of impoundment
levels and instantaneous run-of-river operation. Lyndonville also
proposes to develop a minimum flow monitoring plan to ensure adequate
flow is provided to the bypassed reach and downstream of the
powerhouse.
Lyndonville also proposes several measures related to recreation
resources, including: (1) Constructing and maintaining a new carry-in
boat access trail downstream of the tailrace, on the west bank of the
Passumpsic River; (2) designating a new bank fishing area; (3)
installing a designated parking area outside of the project gates along
the access road to the project; and (4) installing an informational
kiosk identifying recreational amenities at the project. To evaluate
the adequacy of project recreation facilities, Lyndonville proposes to
conduct a recreation inventory, use and needs assessment within one
year of completion of recreational improvements.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of the Commission's Rules of
Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining
the appropriate action to take, the Commission will consider all
protests or other comments filed, but only those who file a motion
[[Page 65650]]
to intervene in accordance with the Commission's Rules may become a
party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Procedural Schedule: The application will be processed according
to the following revised schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary February 2019.
terms and conditions, and preliminary
fishway prescriptions.
Commission issues Environmental August 2019.
Assessment.
Comments on Environmental Assessment... September 2019.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
p. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: December 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-27650 Filed 12-20-18; 8:45 am]
BILLING CODE 6717-01-P