Sunshine Act Meetings, 64820-64822 [2018-27487]
Download as PDF
64820
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2906–012;
ER10–2908–012; ER10–2910–012;
ER11–4393–007
Applicants: Morgan Stanley Capital
Group Inc., MS Solar Solutions Corp.,
Power Contract Financing II, L.L.C.,
TAQA Gen X LLC.
Description: Notice of Non-Material
Change in Status of the Morgan Stanley
Public Utilities.
Filed Date: 12/11/18.
Accession Number: 20181211–5142.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–302–001.
Applicants: NTE Southeast Electric
Company, LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective 1/1/
2019.
Filed Date: 12/12/18.
Accession Number: 20181212–5251.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–531–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 117 Agreement on
Interconnection Study 2 Costs to be
effective 12/12/2018.
Filed Date: 12/11/18.
Accession Number: 20181211–5115.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–532–000.
Applicants: Summer Energy Midwest,
LLC.
Description: § 205(d) Rate Filing:
Summer Energy of Ohio Notice of
Succession to be effective 10/31/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5009.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–533–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing: Rate
Schedule 505 Amd and Restated OMU
IA 2018 to be effective 11/13/2018.
Filed Date: 12/11/18.
Accession Number: 20181211–5148.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–534–000.
Applicants: Prairie Breeze Wind
Energy II LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 12/13/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5026.
Comments Due: 5 p.m. ET 1/2/19.
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
Docket Numbers: ER19–536–000.
Applicants: Buckeye Wind Energy
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 12/13/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5027.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–537–000.
Applicants: AltaGas San Joaquin
Energy Inc.
Description: § 205(d) Rate Filing:
Notices of Succession to be effective
12/13/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5028.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–538–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–12–12 Imbalance Conformance
Enhancement Amendment to be
effective 2/27/2019.
Filed Date: 12/12/18.
Accession Number: 20181212–5132.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–539–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–12–12 EIM Agreement between
CAISO and Salt River Project to be
effective 2/11/2019.
Filed Date: 12/12/18.
Accession Number: 20181212–5136.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–540–000.
Applicants: Ohio Power Company,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: Ohio
Power et al. submits 50th Revised
ILDSA, SA No. 1336 btw AEPSC and
Buckeye to be effective 12/12/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5175.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–541–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of JUA with Jo-Carroll Energy to
be effective 2/11/2019.
Filed Date: 12/12/18.
Accession Number: 20181212–5202.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–542–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5238; Queue No.
AD1–084 to be effective 11/12/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5219.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–543–000.
Applicants: Nevada Power Company.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
Service Agreement No. 18–00087 NPCSunshine Valley Solar EPC to be
effective 12/13/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5230.
Comments Due: 5 p.m. ET 1/2/19.
Docket Numbers: ER19–544–000.
Applicants: Aragonne Wind LLC.
Description: § 205(d) Rate Filing:
Request for Cat. 1 Seller Status in the
SW Region to be effective 12/13/2018.
Filed Date: 12/12/18.
Accession Number: 20181212–5247.
Comments Due: 5 p.m. ET 1/2/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–5–000.
Applicants: Cube Yadkin
Transmission LLC.
Description: Application under for
Authorization Section 204 of the
Federal Power Act of Cube Yadkin
Transmission LLC.
Filed Date: 12/12/18.
Accession Number: 20181212–5194.
Comments Due: 5 p.m. ET 1/2/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–27318 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
E:\FR\FM\18DEN1.SGM
18DEN1
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
* Note—Items listed on the agenda
may be deleted without further notice.
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME:
CONTACT PERSON FOR MORE INFORMATION:
December 20, 2018,
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
10:00 a.m.
Room 2C, 888 First Street NE,
Washington, DC 20426.
PLACE:
STATUS:
Open.
MATTERS TO BE CONSIDERED:
Agenda.
64821
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed online at the Commission’s
website at https://ferc.capitol
connection.org/ using the eLibrary link,
or may be examined in the
Commission’s Public Reference Room.
1050TH MEETING—OPEN MEETING
[December 20, 2018, 10:00 a.m.]
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 .................
A–2 .................
AD19–1–000 .......................................................
AD19–2–000 .......................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
ELECTRIC
E–1 .................
RM19–2–000 ......................................................
E–2 .................
ER18–1952–001,
ER18–1952–002,
ER18–
1952–003.
EC18–117–000 ...................................................
EL18–155–000 ....................................................
EL18–156–000 ....................................................
EL18–161–000 ....................................................
EL18–162–000 ....................................................
ER18–2322–000 .................................................
EL18–163–000 ....................................................
EL18–166–000 ....................................................
ER18–2319–000 .................................................
EL18–138–000 ....................................................
E–3 .................
E–4 .................
E–5 .................
E–6 .................
E–7 .................
E–8 .................
E–9 .................
E–10 ...............
E–11 ...............
E–12 ...............
E–13 ...............
E–14 ...............
E–15 ...............
amozie on DSK3GDR082PROD with NOTICES
E–16 ...............
E–17 ...............
E–18 ...............
ER18–1739–000 .................................................
EL18–159–000 ....................................................
EL18–160–000 ....................................................
ER18–2323–000 .................................................
EL19–16–000 ......................................................
EL18–157–000 ....................................................
EL18–165–000 ....................................................
EL18–167–000 ....................................................
EL18–158–000 ....................................................
EL18–164–000 ....................................................
ER19–166–000 ...................................................
ER18–2340–001 .................................................
ER19–169–000 ...................................................
E–19 ...............
E–20 ...............
E–21 ...............
ER18–1953–000, ER18–1953–001 ....................
ER17–2154–002 .................................................
ER17–802–002, EL19–24–000, ER17–802–001
(consolidated).
ER18–2377–000 .................................................
OMITTED
EL18–188–000 ....................................................
E–22 ...............
EL18–194–000 ....................................................
E–23 ...............
E–24 ...............
EL18–197–000 ....................................................
EL18–176–000 ....................................................
Refinements to Horizontal Market Power Analysis for Sellers in Certain Regional Transmission Organization and Independent System Operator Markets.
Gulf Power Company.
NextEra Energy, Inc.; 700 Universe, LLC.; Gulf Power Company.
Ameren Illinois Company.
Ameren Transmission Company of Illinois.
Northern States Power Company, a Minnesota corporation.
Northern States Power Company, a Wisconsin corporation.
Midcontinent Independent System Operator, Inc.
Public Service Company of Colorado.
Southwestern Public Service Company.
Public Service Company of Colorado.
Midcontinent Independent System Operator, Inc.; ALLETE, Inc.; MontanaDakota Utilities Co.; Northern Indiana Public Service Company; Otter Tail
Power Company; Southern Indiana Gas & Electric Company.
Midcontinent Independent System Operator, Inc.
International Transmission Company.
ITC Midwest, LLC.
Midcontinent Independent System Operator, Inc.
Michigan Electric Transmission Company, LLC.
American Transmission Company, LLC.
TransCanyon DCR, LLC.
Virginia Electric and Power Company.
GridLiance West Transco LLC.
Southern California Edison Company.
Southwest Power Pool, Inc.
Midcontinent Independent System Operator, Inc.
ISO New England Inc. and New England Power Pool Participants Committee.
Gulf Power Company.
Pacific Gas and Electric Company.
Exelon Generation Company, LLC.
Southwestern Public Service Company.
NRG Curtailment Solutions, Inc. v. New York Independent System Operator,
Inc.
Nebraska Public Power District v. Tri-State Generation and Transmission Association, Inc. and Southwest Power Pool, Inc.
City of Oakland, California v. Pacific Gas and Electric Company.
City of Falmouth, Kentucky.
GAS
G–1
G–2
G–3
G–4
G–5
................
................
................
................
................
VerDate Sep<11>2014
RP19–238–000, RP19–238–001 ........................
RP19–240–000 ...................................................
RP19–266–000, RP19–267–000 ........................
RP19–307–000 ...................................................
RP17–811–003, RP17–811–004, RP18–271–
001, RP18–271–002 (consolidated).
00:45 Dec 18, 2018
Jkt 247001
PO 00000
Frm 00013
Southwest Gas Transmission Company, A Limited Partnership.
WestGas Interstate, Inc.
Southeast Supply Header, LLC.
Black Hills Utility Holdings, Inc.; Black Hills Service Company, LLC.
Peregrine Oil & Gas II, LLC v. Texas Eastern Transmission, LP.
Fmt 4703
Sfmt 4703
E:\FR\FM\18DEN1.SGM
18DEN1
64822
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
1050TH MEETING—OPEN MEETING—Continued
[December 20, 2018, 10:00 a.m.]
Item No.
Docket No.
Company
HYDRO
H–1 .................
RM18–14–000 ....................................................
H–2 .................
H–3 .................
H–4 .................
DI18–1–001 ........................................................
P–14329–005 ......................................................
P–2744–046 ........................................................
Elimination of Form 80 and Revision of Regulations on Recreational Opportunities and Development at Licensed Hydropower Projects.
Covington Mountain Hydro, LLC.
Columbia Basin Hydropower.
North East Wisconsin Hydro, LLC.
CERTIFICATES
C–1 .................
CP18–532–000 ...................................................
C–2 .................
C–3 .................
C–4 .................
CP19–20–000 .....................................................
CP18–45–000 .....................................................
CP15–550–000 ...................................................
CP15–551–000, CP15–551–001 ........................
Issued: December 13, 2018.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2018–27487 Filed 12–14–18; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
amozie on DSK3GDR082PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. 2337–000]
PacifiCorp; Notice of Authorization for
Continued Project Operation
On December 30, 2016, PacifiCorp,
licensee for the Prospect No. 3
Hydroelectric Project, filed an
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas
Dry Kilns, Inc.
Golden Pass LNG Terminal LLC and Golden Pass Products LLC.
Dominion Energy Transmission, Inc.
Venture Global Calcasieu Pass, LLC.
TransCameron Pipeline, LLC.
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Prospect No. Hydroelectric Project
is located on the South Fork Rogue
River, in Jackson County, Oregon.
The license for Project No. 2337 was
issued for a period ending December 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2337
is issued to the licensee for a period
effective January 1, 2019 through
December 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
(or other disposition) does not take
place on or before December 31, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, PacifiCorp, is
authorized to continue operation of the
Prospect No. 3 Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27312 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–14862–001]
Douglas Leen; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original minor
license.
b. Project No.: P–14862–001.
c. Date filed: November 28, 2018.
d. Applicant: Mr. Douglas Leen.
e. Name of Project: Kupeanof Microhydro
Project.
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Pages 64820-64822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27487]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
[[Page 64821]]
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: December 20, 2018, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed online at the
Commission's website at https://ferc.capitolconnection.org/ using the
eLibrary link, or may be examined in the Commission's Public Reference
Room.
1050th Meeting--Open Meeting
[December 20, 2018, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1........................ AD19-1-000....................... Agency Administrative Matters.
A-2........................ AD19-2-000....................... Customer Matters, Reliability, Security and
Market Operations.
----------------------------------------------------------------------------------------------------------------
ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1........................ RM19-2-000....................... Refinements to Horizontal Market Power Analysis
for Sellers in Certain Regional Transmission
Organization and Independent System Operator
Markets.
E-2........................ ER18-1952-001, ER18-1952-002, Gulf Power Company.
ER18-1952-003.
E-3........................ EC18-117-000..................... NextEra Energy, Inc.; 700 Universe, LLC.; Gulf
Power Company.
E-4........................ EL18-155-000..................... Ameren Illinois Company.
EL18-156-000..................... Ameren Transmission Company of Illinois.
EL18-161-000..................... Northern States Power Company, a Minnesota
corporation.
EL18-162-000..................... Northern States Power Company, a Wisconsin
corporation.
ER18-2322-000.................... Midcontinent Independent System Operator, Inc.
E-5........................ EL18-163-000..................... Public Service Company of Colorado.
EL18-166-000..................... Southwestern Public Service Company.
ER18-2319-000.................... Public Service Company of Colorado.
E-6........................ EL18-138-000..................... Midcontinent Independent System Operator, Inc.;
ALLETE, Inc.; Montana-Dakota Utilities Co.;
Northern Indiana Public Service Company; Otter
Tail Power Company; Southern Indiana Gas &
Electric Company.
ER18-1739-000.................... Midcontinent Independent System Operator, Inc.
E-7........................ EL18-159-000..................... International Transmission Company.
EL18-160-000..................... ITC Midwest, LLC.
ER18-2323-000.................... Midcontinent Independent System Operator, Inc.
EL19-16-000...................... Michigan Electric Transmission Company, LLC.
E-8........................ EL18-157-000..................... American Transmission Company, LLC.
E-9........................ EL18-165-000..................... TransCanyon DCR, LLC.
E-10....................... EL18-167-000..................... Virginia Electric and Power Company.
E-11....................... EL18-158-000..................... GridLiance West Transco LLC.
E-12....................... EL18-164-000..................... Southern California Edison Company.
E-13....................... ER19-166-000..................... Southwest Power Pool, Inc.
E-14....................... ER18-2340-001.................... Midcontinent Independent System Operator, Inc.
E-15....................... ER19-169-000..................... ISO New England Inc. and New England Power Pool
Participants Committee.
E-16....................... ER18-1953-000, ER18-1953-001..... Gulf Power Company.
E-17....................... ER17-2154-002.................... Pacific Gas and Electric Company.
E-18....................... ER17-802-002, EL19-24-000, ER17- Exelon Generation Company, LLC.
802-001 (consolidated).
E-19....................... ER18-2377-000.................... Southwestern Public Service Company.
E-20....................... OMITTED
E-21....................... EL18-188-000..................... NRG Curtailment Solutions, Inc. v. New York
Independent System Operator, Inc.
E-22....................... EL18-194-000..................... Nebraska Public Power District v. Tri-State
Generation and Transmission Association, Inc.
and Southwest Power Pool, Inc.
E-23....................... EL18-197-000..................... City of Oakland, California v. Pacific Gas and
Electric Company.
E-24....................... EL18-176-000..................... City of Falmouth, Kentucky.
----------------------------------------------------------------------------------------------------------------
GAS
----------------------------------------------------------------------------------------------------------------
G-1........................ RP19-238-000, RP19-238-001....... Southwest Gas Transmission Company, A Limited
Partnership.
G-2........................ RP19-240-000..................... WestGas Interstate, Inc.
G-3........................ RP19-266-000, RP19-267-000....... Southeast Supply Header, LLC.
G-4........................ RP19-307-000..................... Black Hills Utility Holdings, Inc.; Black Hills
Service Company, LLC.
G-5........................ RP17-811-003, RP17-811-004, RP18- Peregrine Oil & Gas II, LLC v. Texas Eastern
271-001, RP18-271-002 Transmission, LP.
(consolidated).
[[Page 64822]]
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1........................ RM18-14-000...................... Elimination of Form 80 and Revision of
Regulations on Recreational Opportunities and
Development at Licensed Hydropower Projects.
H-2........................ DI18-1-001....................... Covington Mountain Hydro, LLC.
H-3........................ P-14329-005...................... Columbia Basin Hydropower.
H-4........................ P-2744-046....................... North East Wisconsin Hydro, LLC.
----------------------------------------------------------------------------------------------------------------
CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1........................ CP18-532-000..................... Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas
Pipeline Company; Sumas Dry Kilns, Inc.
C-2........................ CP19-20-000...................... Golden Pass LNG Terminal LLC and Golden Pass
Products LLC.
C-3........................ CP18-45-000...................... Dominion Energy Transmission, Inc.
C-4........................ CP15-550-000..................... Venture Global Calcasieu Pass, LLC.
CP15-551-000, CP15-551-001....... TransCameron Pipeline, LLC.
----------------------------------------------------------------------------------------------------------------
Issued: December 13, 2018.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through https://ferc.capitolconnection.org/. Anyone with internet access who desires to
view this event can do so by navigating to www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its webcast. The Capitol Connection provides technical
support for the free webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703-993-3104.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2018-27487 Filed 12-14-18; 4:15 pm]
BILLING CODE 6717-01-P