Sunshine Act Meetings, 64820-64822 [2018-27487]

Download as PDF 64820 Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK3GDR082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2906–012; ER10–2908–012; ER10–2910–012; ER11–4393–007 Applicants: Morgan Stanley Capital Group Inc., MS Solar Solutions Corp., Power Contract Financing II, L.L.C., TAQA Gen X LLC. Description: Notice of Non-Material Change in Status of the Morgan Stanley Public Utilities. Filed Date: 12/11/18. Accession Number: 20181211–5142. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–302–001. Applicants: NTE Southeast Electric Company, LLC. Description: Tariff Amendment: Amendment to 1 to be effective 1/1/ 2019. Filed Date: 12/12/18. Accession Number: 20181212–5251. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–531–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Rate Schedule No. 117 Agreement on Interconnection Study 2 Costs to be effective 12/12/2018. Filed Date: 12/11/18. Accession Number: 20181211–5115. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–532–000. Applicants: Summer Energy Midwest, LLC. Description: § 205(d) Rate Filing: Summer Energy of Ohio Notice of Succession to be effective 10/31/2018. Filed Date: 12/12/18. Accession Number: 20181212–5009. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–533–000. Applicants: Louisville Gas and Electric Company. Description: § 205(d) Rate Filing: Rate Schedule 505 Amd and Restated OMU IA 2018 to be effective 11/13/2018. Filed Date: 12/11/18. Accession Number: 20181211–5148. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–534–000. Applicants: Prairie Breeze Wind Energy II LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/13/2018. Filed Date: 12/12/18. Accession Number: 20181212–5026. Comments Due: 5 p.m. ET 1/2/19. VerDate Sep<11>2014 00:45 Dec 18, 2018 Jkt 247001 Docket Numbers: ER19–536–000. Applicants: Buckeye Wind Energy LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/13/2018. Filed Date: 12/12/18. Accession Number: 20181212–5027. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–537–000. Applicants: AltaGas San Joaquin Energy Inc. Description: § 205(d) Rate Filing: Notices of Succession to be effective 12/13/2018. Filed Date: 12/12/18. Accession Number: 20181212–5028. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–538–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–12–12 Imbalance Conformance Enhancement Amendment to be effective 2/27/2019. Filed Date: 12/12/18. Accession Number: 20181212–5132. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–539–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–12–12 EIM Agreement between CAISO and Salt River Project to be effective 2/11/2019. Filed Date: 12/12/18. Accession Number: 20181212–5136. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–540–000. Applicants: Ohio Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Ohio Power et al. submits 50th Revised ILDSA, SA No. 1336 btw AEPSC and Buckeye to be effective 12/12/2018. Filed Date: 12/12/18. Accession Number: 20181212–5175. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–541–000. Applicants: ITC Midwest LLC. Description: § 205(d) Rate Filing: Filing of JUA with Jo-Carroll Energy to be effective 2/11/2019. Filed Date: 12/12/18. Accession Number: 20181212–5202. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–542–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5238; Queue No. AD1–084 to be effective 11/12/2018. Filed Date: 12/12/18. Accession Number: 20181212–5219. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–543–000. Applicants: Nevada Power Company. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Description: § 205(d) Rate Filing: Service Agreement No. 18–00087 NPCSunshine Valley Solar EPC to be effective 12/13/2018. Filed Date: 12/12/18. Accession Number: 20181212–5230. Comments Due: 5 p.m. ET 1/2/19. Docket Numbers: ER19–544–000. Applicants: Aragonne Wind LLC. Description: § 205(d) Rate Filing: Request for Cat. 1 Seller Status in the SW Region to be effective 12/13/2018. Filed Date: 12/12/18. Accession Number: 20181212–5247. Comments Due: 5 p.m. ET 1/2/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–5–000. Applicants: Cube Yadkin Transmission LLC. Description: Application under for Authorization Section 204 of the Federal Power Act of Cube Yadkin Transmission LLC. Filed Date: 12/12/18. Accession Number: 20181212–5194. Comments Due: 5 p.m. ET 1/2/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 12, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–27318 Filed 12–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meetings The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: E:\FR\FM\18DEN1.SGM 18DEN1 Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices * Note—Items listed on the agenda may be deleted without further notice. AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: CONTACT PERSON FOR MORE INFORMATION: December 20, 2018, Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does 10:00 a.m. Room 2C, 888 First Street NE, Washington, DC 20426. PLACE: STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. 64821 not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed online at the Commission’s website at https://ferc.capitol connection.org/ using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 1050TH MEETING—OPEN MEETING [December 20, 2018, 10:00 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 ................. A–2 ................. AD19–1–000 ....................................................... AD19–2–000 ....................................................... Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. ELECTRIC E–1 ................. RM19–2–000 ...................................................... E–2 ................. ER18–1952–001, ER18–1952–002, ER18– 1952–003. EC18–117–000 ................................................... EL18–155–000 .................................................... EL18–156–000 .................................................... EL18–161–000 .................................................... EL18–162–000 .................................................... ER18–2322–000 ................................................. EL18–163–000 .................................................... EL18–166–000 .................................................... ER18–2319–000 ................................................. EL18–138–000 .................................................... E–3 ................. E–4 ................. E–5 ................. E–6 ................. E–7 ................. E–8 ................. E–9 ................. E–10 ............... E–11 ............... E–12 ............... E–13 ............... E–14 ............... E–15 ............... amozie on DSK3GDR082PROD with NOTICES E–16 ............... E–17 ............... E–18 ............... ER18–1739–000 ................................................. EL18–159–000 .................................................... EL18–160–000 .................................................... ER18–2323–000 ................................................. EL19–16–000 ...................................................... EL18–157–000 .................................................... EL18–165–000 .................................................... EL18–167–000 .................................................... EL18–158–000 .................................................... EL18–164–000 .................................................... ER19–166–000 ................................................... ER18–2340–001 ................................................. ER19–169–000 ................................................... E–19 ............... E–20 ............... E–21 ............... ER18–1953–000, ER18–1953–001 .................... ER17–2154–002 ................................................. ER17–802–002, EL19–24–000, ER17–802–001 (consolidated). ER18–2377–000 ................................................. OMITTED EL18–188–000 .................................................... E–22 ............... EL18–194–000 .................................................... E–23 ............... E–24 ............... EL18–197–000 .................................................... EL18–176–000 .................................................... Refinements to Horizontal Market Power Analysis for Sellers in Certain Regional Transmission Organization and Independent System Operator Markets. Gulf Power Company. NextEra Energy, Inc.; 700 Universe, LLC.; Gulf Power Company. Ameren Illinois Company. Ameren Transmission Company of Illinois. Northern States Power Company, a Minnesota corporation. Northern States Power Company, a Wisconsin corporation. Midcontinent Independent System Operator, Inc. Public Service Company of Colorado. Southwestern Public Service Company. Public Service Company of Colorado. Midcontinent Independent System Operator, Inc.; ALLETE, Inc.; MontanaDakota Utilities Co.; Northern Indiana Public Service Company; Otter Tail Power Company; Southern Indiana Gas & Electric Company. Midcontinent Independent System Operator, Inc. International Transmission Company. ITC Midwest, LLC. Midcontinent Independent System Operator, Inc. Michigan Electric Transmission Company, LLC. American Transmission Company, LLC. TransCanyon DCR, LLC. Virginia Electric and Power Company. GridLiance West Transco LLC. Southern California Edison Company. Southwest Power Pool, Inc. Midcontinent Independent System Operator, Inc. ISO New England Inc. and New England Power Pool Participants Committee. Gulf Power Company. Pacific Gas and Electric Company. Exelon Generation Company, LLC. Southwestern Public Service Company. NRG Curtailment Solutions, Inc. v. New York Independent System Operator, Inc. Nebraska Public Power District v. Tri-State Generation and Transmission Association, Inc. and Southwest Power Pool, Inc. City of Oakland, California v. Pacific Gas and Electric Company. City of Falmouth, Kentucky. GAS G–1 G–2 G–3 G–4 G–5 ................ ................ ................ ................ ................ VerDate Sep<11>2014 RP19–238–000, RP19–238–001 ........................ RP19–240–000 ................................................... RP19–266–000, RP19–267–000 ........................ RP19–307–000 ................................................... RP17–811–003, RP17–811–004, RP18–271– 001, RP18–271–002 (consolidated). 00:45 Dec 18, 2018 Jkt 247001 PO 00000 Frm 00013 Southwest Gas Transmission Company, A Limited Partnership. WestGas Interstate, Inc. Southeast Supply Header, LLC. Black Hills Utility Holdings, Inc.; Black Hills Service Company, LLC. Peregrine Oil & Gas II, LLC v. Texas Eastern Transmission, LP. Fmt 4703 Sfmt 4703 E:\FR\FM\18DEN1.SGM 18DEN1 64822 Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices 1050TH MEETING—OPEN MEETING—Continued [December 20, 2018, 10:00 a.m.] Item No. Docket No. Company HYDRO H–1 ................. RM18–14–000 .................................................... H–2 ................. H–3 ................. H–4 ................. DI18–1–001 ........................................................ P–14329–005 ...................................................... P–2744–046 ........................................................ Elimination of Form 80 and Revision of Regulations on Recreational Opportunities and Development at Licensed Hydropower Projects. Covington Mountain Hydro, LLC. Columbia Basin Hydropower. North East Wisconsin Hydro, LLC. CERTIFICATES C–1 ................. CP18–532–000 ................................................... C–2 ................. C–3 ................. C–4 ................. CP19–20–000 ..................................................... CP18–45–000 ..................................................... CP15–550–000 ................................................... CP15–551–000, CP15–551–001 ........................ Issued: December 13, 2018. Kimberly D. Bose, Secretary. A free webcast of this event is available through https:// ferc.capitolconnection.org/. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https:// ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703–993–3104. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2018–27487 Filed 12–14–18; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY amozie on DSK3GDR082PROD with NOTICES Federal Energy Regulatory Commission [Project No. 2337–000] PacifiCorp; Notice of Authorization for Continued Project Operation On December 30, 2016, PacifiCorp, licensee for the Prospect No. 3 Hydroelectric Project, filed an VerDate Sep<11>2014 00:45 Dec 18, 2018 Jkt 247001 Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas Dry Kilns, Inc. Golden Pass LNG Terminal LLC and Golden Pass Products LLC. Dominion Energy Transmission, Inc. Venture Global Calcasieu Pass, LLC. TransCameron Pipeline, LLC. Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Prospect No. Hydroelectric Project is located on the South Fork Rogue River, in Jackson County, Oregon. The license for Project No. 2337 was issued for a period ending December 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2337 is issued to the licensee for a period effective January 1, 2019 through December 31, 2019, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 (or other disposition) does not take place on or before December 31, 2019, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, PacifiCorp, is authorized to continue operation of the Prospect No. 3 Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: December 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–27312 Filed 12–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–14862–001] Douglas Leen; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original minor license. b. Project No.: P–14862–001. c. Date filed: November 28, 2018. d. Applicant: Mr. Douglas Leen. e. Name of Project: Kupeanof Microhydro Project. E:\FR\FM\18DEN1.SGM 18DEN1

Agencies

[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Pages 64820-64822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27487]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meetings

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

[[Page 64821]]


AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: December 20, 2018, 10:00 a.m.

PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda.
    * Note--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed online at the 
Commission's website at https://ferc.capitolconnection.org/ using the 
eLibrary link, or may be examined in the Commission's Public Reference 
Room.

                                          1050th Meeting--Open Meeting
                                         [December 20, 2018, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
          Item No.                       Docket No.                                  Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1........................  AD19-1-000.......................  Agency Administrative Matters.
A-2........................  AD19-2-000.......................  Customer Matters, Reliability, Security and
                                                                 Market Operations.
----------------------------------------------------------------------------------------------------------------
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1........................  RM19-2-000.......................  Refinements to Horizontal Market Power Analysis
                                                                 for Sellers in Certain Regional Transmission
                                                                 Organization and Independent System Operator
                                                                 Markets.
E-2........................  ER18-1952-001, ER18-1952-002,      Gulf Power Company.
                              ER18-1952-003.
E-3........................  EC18-117-000.....................  NextEra Energy, Inc.; 700 Universe, LLC.; Gulf
                                                                 Power Company.
E-4........................  EL18-155-000.....................  Ameren Illinois Company.
                             EL18-156-000.....................  Ameren Transmission Company of Illinois.
                             EL18-161-000.....................  Northern States Power Company, a Minnesota
                                                                 corporation.
                             EL18-162-000.....................  Northern States Power Company, a Wisconsin
                                                                 corporation.
                             ER18-2322-000....................  Midcontinent Independent System Operator, Inc.
E-5........................  EL18-163-000.....................  Public Service Company of Colorado.
                             EL18-166-000.....................  Southwestern Public Service Company.
                             ER18-2319-000....................  Public Service Company of Colorado.
E-6........................  EL18-138-000.....................  Midcontinent Independent System Operator, Inc.;
                                                                 ALLETE, Inc.; Montana-Dakota Utilities Co.;
                                                                 Northern Indiana Public Service Company; Otter
                                                                 Tail Power Company; Southern Indiana Gas &
                                                                 Electric Company.
                             ER18-1739-000....................  Midcontinent Independent System Operator, Inc.
E-7........................  EL18-159-000.....................  International Transmission Company.
                             EL18-160-000.....................  ITC Midwest, LLC.
                             ER18-2323-000....................  Midcontinent Independent System Operator, Inc.
                             EL19-16-000......................  Michigan Electric Transmission Company, LLC.
E-8........................  EL18-157-000.....................  American Transmission Company, LLC.
E-9........................  EL18-165-000.....................  TransCanyon DCR, LLC.
E-10.......................  EL18-167-000.....................  Virginia Electric and Power Company.
E-11.......................  EL18-158-000.....................  GridLiance West Transco LLC.
E-12.......................  EL18-164-000.....................  Southern California Edison Company.
E-13.......................  ER19-166-000.....................  Southwest Power Pool, Inc.
E-14.......................  ER18-2340-001....................  Midcontinent Independent System Operator, Inc.
E-15.......................  ER19-169-000.....................  ISO New England Inc. and New England Power Pool
                                                                 Participants Committee.
E-16.......................  ER18-1953-000, ER18-1953-001.....  Gulf Power Company.
E-17.......................  ER17-2154-002....................  Pacific Gas and Electric Company.
E-18.......................  ER17-802-002, EL19-24-000, ER17-   Exelon Generation Company, LLC.
                              802-001 (consolidated).
E-19.......................  ER18-2377-000....................  Southwestern Public Service Company.
E-20.......................  OMITTED
E-21.......................  EL18-188-000.....................  NRG Curtailment Solutions, Inc. v. New York
                                                                 Independent System Operator, Inc.
E-22.......................  EL18-194-000.....................  Nebraska Public Power District v. Tri-State
                                                                 Generation and Transmission Association, Inc.
                                                                 and Southwest Power Pool, Inc.
E-23.......................  EL18-197-000.....................  City of Oakland, California v. Pacific Gas and
                                                                 Electric Company.
E-24.......................  EL18-176-000.....................  City of Falmouth, Kentucky.
----------------------------------------------------------------------------------------------------------------
                                                       GAS
----------------------------------------------------------------------------------------------------------------
G-1........................  RP19-238-000, RP19-238-001.......  Southwest Gas Transmission Company, A Limited
                                                                 Partnership.
G-2........................  RP19-240-000.....................  WestGas Interstate, Inc.
G-3........................  RP19-266-000, RP19-267-000.......  Southeast Supply Header, LLC.
G-4........................  RP19-307-000.....................  Black Hills Utility Holdings, Inc.; Black Hills
                                                                 Service Company, LLC.
G-5........................  RP17-811-003, RP17-811-004, RP18-  Peregrine Oil & Gas II, LLC v. Texas Eastern
                              271-001, RP18-271-002              Transmission, LP.
                              (consolidated).

[[Page 64822]]

 
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1........................  RM18-14-000......................  Elimination of Form 80 and Revision of
                                                                 Regulations on Recreational Opportunities and
                                                                 Development at Licensed Hydropower Projects.
H-2........................  DI18-1-001.......................  Covington Mountain Hydro, LLC.
H-3........................  P-14329-005......................  Columbia Basin Hydropower.
H-4........................  P-2744-046.......................  North East Wisconsin Hydro, LLC.
----------------------------------------------------------------------------------------------------------------
                                                  CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1........................  CP18-532-000.....................  Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas
                                                                 Pipeline Company; Sumas Dry Kilns, Inc.
C-2........................  CP19-20-000......................  Golden Pass LNG Terminal LLC and Golden Pass
                                                                 Products LLC.
C-3........................  CP18-45-000......................  Dominion Energy Transmission, Inc.
C-4........................  CP15-550-000.....................  Venture Global Calcasieu Pass, LLC.
                             CP15-551-000, CP15-551-001.......  TransCameron Pipeline, LLC.
----------------------------------------------------------------------------------------------------------------


    Issued: December 13, 2018.
Kimberly D. Bose,
Secretary.

    A free webcast of this event is available through https://ferc.capitolconnection.org/. Anyone with internet access who desires to 
view this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://ferc.capitolconnection.org/ or contact 
Shirley Al-Jarani at 703-993-3104.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2018-27487 Filed 12-14-18; 4:15 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.