Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 64830 [2018-27313]
Download as PDF
64830
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
December 26, 2018.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27303 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2512–079]
amozie on DSK3GDR082PROD with NOTICES
Hawks Nest Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation
Management Plan.
b. Project No.: 2512–079.
c. Date Filed: November 30, 2018.
d. Applicant: Hawks Nest Hydro, LLC.
e. Name of Project: Hawks Nest
Hydroelectric Project.
f. Location: The project is located on
the New River, just upstream of the
confluence of the New and Gauley
Rivers, near the Town of Ansted in
Fayette County, West Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Marshall Olson,
Compliance Manager, 40325 Hoops
Court, Albemarle, NC 28001, (865) 255–
4240.
i. FERC Contact: Shawn Halerz, (202)
502–6360, Shawn.Halerz@ferc.gov.
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
j. Deadline for filing comments,
motions to intervene, and protests:
January 12, 2018.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2512–079.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by Article 408 of the December 22, 2017
license, Hawks Nest Hydro, LLC
(licensee) requests Commission
approval of a proposed Recreation
Management Plan (plan) for the project.
The plan incorporates the provisions
required by Article 408 and conditions
of the West Virginia Department of
Environmental Protection water quality
certificate. The licensee proposes
enhancements to the existing Cotton
Hill Bridge Day-Use area, the addition of
a take-out location on the New River in
the Gauley Bridge area developed in
conjunction with the West Virginia
Department of Natural Resources, and
the addition of a dam portage/bike-hike
trail.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title COMMENTS, PROTEST,
or MOTION TO INTERVENE as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27313 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Page 64830]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27313]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2512-079]
Hawks Nest Hydro, LLC; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Recreation Management Plan.
b. Project No.: 2512-079.
c. Date Filed: November 30, 2018.
d. Applicant: Hawks Nest Hydro, LLC.
e. Name of Project: Hawks Nest Hydroelectric Project.
f. Location: The project is located on the New River, just upstream
of the confluence of the New and Gauley Rivers, near the Town of Ansted
in Fayette County, West Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Marshall Olson, Compliance Manager, 40325
Hoops Court, Albemarle, NC 28001, (865) 255-4240.
i. FERC Contact: Shawn Halerz, (202) 502-6360,
Shawn.Halerz@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: January 12, 2018.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC 20426. The first page of any
filing should include docket number P-2512-079. Comments emailed to
Commission staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: As required by Article 408 of the
December 22, 2017 license, Hawks Nest Hydro, LLC (licensee) requests
Commission approval of a proposed Recreation Management Plan (plan) for
the project. The plan incorporates the provisions required by Article
408 and conditions of the West Virginia Department of Environmental
Protection water quality certificate. The licensee proposes
enhancements to the existing Cotton Hill Bridge Day-Use area, the
addition of a take-out location on the New River in the Gauley Bridge
area developed in conjunction with the West Virginia Department of
Natural Resources, and the addition of a dam portage/bike-hike trail.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's website at https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as
applicable; (2) set forth in the heading the name of the applicant and
the project number of the application to which the filing responds; (3)
furnish the name, address, and telephone number of the person
commenting, protesting or intervening; and (4) otherwise comply with
the requirements of 18 CFR 385.2001 through 385.2005. All comments,
motions to intervene, or protests must set forth their evidentiary
basis. Any filing made by an intervenor must be accompanied by proof of
service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-27313 Filed 12-17-18; 8:45 am]
BILLING CODE 6717-01-P