PacifiCorp; Notice of Authorization for Continued Project Operation, 64822 [2018-27312]

Download as PDF 64822 Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices 1050TH MEETING—OPEN MEETING—Continued [December 20, 2018, 10:00 a.m.] Item No. Docket No. Company HYDRO H–1 ................. RM18–14–000 .................................................... H–2 ................. H–3 ................. H–4 ................. DI18–1–001 ........................................................ P–14329–005 ...................................................... P–2744–046 ........................................................ Elimination of Form 80 and Revision of Regulations on Recreational Opportunities and Development at Licensed Hydropower Projects. Covington Mountain Hydro, LLC. Columbia Basin Hydropower. North East Wisconsin Hydro, LLC. CERTIFICATES C–1 ................. CP18–532–000 ................................................... C–2 ................. C–3 ................. C–4 ................. CP19–20–000 ..................................................... CP18–45–000 ..................................................... CP15–550–000 ................................................... CP15–551–000, CP15–551–001 ........................ Issued: December 13, 2018. Kimberly D. Bose, Secretary. A free webcast of this event is available through https:// ferc.capitolconnection.org/. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https:// ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703–993–3104. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2018–27487 Filed 12–14–18; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY amozie on DSK3GDR082PROD with NOTICES Federal Energy Regulatory Commission [Project No. 2337–000] PacifiCorp; Notice of Authorization for Continued Project Operation On December 30, 2016, PacifiCorp, licensee for the Prospect No. 3 Hydroelectric Project, filed an VerDate Sep<11>2014 00:45 Dec 18, 2018 Jkt 247001 Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas Dry Kilns, Inc. Golden Pass LNG Terminal LLC and Golden Pass Products LLC. Dominion Energy Transmission, Inc. Venture Global Calcasieu Pass, LLC. TransCameron Pipeline, LLC. Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Prospect No. Hydroelectric Project is located on the South Fork Rogue River, in Jackson County, Oregon. The license for Project No. 2337 was issued for a period ending December 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2337 is issued to the licensee for a period effective January 1, 2019 through December 31, 2019, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 (or other disposition) does not take place on or before December 31, 2019, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, PacifiCorp, is authorized to continue operation of the Prospect No. 3 Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: December 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–27312 Filed 12–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–14862–001] Douglas Leen; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original minor license. b. Project No.: P–14862–001. c. Date filed: November 28, 2018. d. Applicant: Mr. Douglas Leen. e. Name of Project: Kupeanof Microhydro Project. E:\FR\FM\18DEN1.SGM 18DEN1

Agencies

[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Page 64822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27312]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2337-000]


PacifiCorp; Notice of Authorization for Continued Project 
Operation

    On December 30, 2016, PacifiCorp, licensee for the Prospect No. 3 
Hydroelectric Project, filed an Application for a New License pursuant 
to the Federal Power Act (FPA) and the Commission's regulations 
thereunder. The Prospect No. Hydroelectric Project is located on the 
South Fork Rogue River, in Jackson County, Oregon.
    The license for Project No. 2337 was issued for a period ending 
December 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2337 is issued to 
the licensee for a period effective January 1, 2019 through December 
31, 2019, or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first. If issuance of 
a new license (or other disposition) does not take place on or before 
December 31, 2019, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that the licensee, PacifiCorp, is authorized to continue 
operation of the Prospect No. 3 Hydroelectric Project, until such time 
as the Commission acts on its application for a subsequent license.

    Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-27312 Filed 12-17-18; 8:45 am]
 BILLING CODE 6717-01-P