PacifiCorp; Notice of Authorization for Continued Project Operation, 64822 [2018-27312]
Download as PDF
64822
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
1050TH MEETING—OPEN MEETING—Continued
[December 20, 2018, 10:00 a.m.]
Item No.
Docket No.
Company
HYDRO
H–1 .................
RM18–14–000 ....................................................
H–2 .................
H–3 .................
H–4 .................
DI18–1–001 ........................................................
P–14329–005 ......................................................
P–2744–046 ........................................................
Elimination of Form 80 and Revision of Regulations on Recreational Opportunities and Development at Licensed Hydropower Projects.
Covington Mountain Hydro, LLC.
Columbia Basin Hydropower.
North East Wisconsin Hydro, LLC.
CERTIFICATES
C–1 .................
CP18–532–000 ...................................................
C–2 .................
C–3 .................
C–4 .................
CP19–20–000 .....................................................
CP18–45–000 .....................................................
CP15–550–000 ...................................................
CP15–551–000, CP15–551–001 ........................
Issued: December 13, 2018.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2018–27487 Filed 12–14–18; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
amozie on DSK3GDR082PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. 2337–000]
PacifiCorp; Notice of Authorization for
Continued Project Operation
On December 30, 2016, PacifiCorp,
licensee for the Prospect No. 3
Hydroelectric Project, filed an
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas
Dry Kilns, Inc.
Golden Pass LNG Terminal LLC and Golden Pass Products LLC.
Dominion Energy Transmission, Inc.
Venture Global Calcasieu Pass, LLC.
TransCameron Pipeline, LLC.
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Prospect No. Hydroelectric Project
is located on the South Fork Rogue
River, in Jackson County, Oregon.
The license for Project No. 2337 was
issued for a period ending December 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2337
is issued to the licensee for a period
effective January 1, 2019 through
December 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
(or other disposition) does not take
place on or before December 31, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, PacifiCorp, is
authorized to continue operation of the
Prospect No. 3 Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27312 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–14862–001]
Douglas Leen; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original minor
license.
b. Project No.: P–14862–001.
c. Date filed: November 28, 2018.
d. Applicant: Mr. Douglas Leen.
e. Name of Project: Kupeanof Microhydro
Project.
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Page 64822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27312]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2337-000]
PacifiCorp; Notice of Authorization for Continued Project
Operation
On December 30, 2016, PacifiCorp, licensee for the Prospect No. 3
Hydroelectric Project, filed an Application for a New License pursuant
to the Federal Power Act (FPA) and the Commission's regulations
thereunder. The Prospect No. Hydroelectric Project is located on the
South Fork Rogue River, in Jackson County, Oregon.
The license for Project No. 2337 was issued for a period ending
December 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2337 is issued to
the licensee for a period effective January 1, 2019 through December
31, 2019, or until the issuance of a new license for the project or
other disposition under the FPA, whichever comes first. If issuance of
a new license (or other disposition) does not take place on or before
December 31, 2019, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the licensee, PacifiCorp, is authorized to continue
operation of the Prospect No. 3 Hydroelectric Project, until such time
as the Commission acts on its application for a subsequent license.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-27312 Filed 12-17-18; 8:45 am]