Douglas Leen; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 64822-64823 [2018-27294]
Download as PDF
64822
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
1050TH MEETING—OPEN MEETING—Continued
[December 20, 2018, 10:00 a.m.]
Item No.
Docket No.
Company
HYDRO
H–1 .................
RM18–14–000 ....................................................
H–2 .................
H–3 .................
H–4 .................
DI18–1–001 ........................................................
P–14329–005 ......................................................
P–2744–046 ........................................................
Elimination of Form 80 and Revision of Regulations on Recreational Opportunities and Development at Licensed Hydropower Projects.
Covington Mountain Hydro, LLC.
Columbia Basin Hydropower.
North East Wisconsin Hydro, LLC.
CERTIFICATES
C–1 .................
CP18–532–000 ...................................................
C–2 .................
C–3 .................
C–4 .................
CP19–20–000 .....................................................
CP18–45–000 .....................................................
CP15–550–000 ...................................................
CP15–551–000, CP15–551–001 ........................
Issued: December 13, 2018.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2018–27487 Filed 12–14–18; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
amozie on DSK3GDR082PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. 2337–000]
PacifiCorp; Notice of Authorization for
Continued Project Operation
On December 30, 2016, PacifiCorp,
licensee for the Prospect No. 3
Hydroelectric Project, filed an
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas
Dry Kilns, Inc.
Golden Pass LNG Terminal LLC and Golden Pass Products LLC.
Dominion Energy Transmission, Inc.
Venture Global Calcasieu Pass, LLC.
TransCameron Pipeline, LLC.
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Prospect No. Hydroelectric Project
is located on the South Fork Rogue
River, in Jackson County, Oregon.
The license for Project No. 2337 was
issued for a period ending December 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2337
is issued to the licensee for a period
effective January 1, 2019 through
December 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
(or other disposition) does not take
place on or before December 31, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, PacifiCorp, is
authorized to continue operation of the
Prospect No. 3 Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27312 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–14862–001]
Douglas Leen; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original minor
license.
b. Project No.: P–14862–001.
c. Date filed: November 28, 2018.
d. Applicant: Mr. Douglas Leen.
e. Name of Project: Kupeanof Microhydro
Project.
E:\FR\FM\18DEN1.SGM
18DEN1
amozie on DSK3GDR082PROD with NOTICES
Federal Register / Vol. 83, No. 242 / Tuesday, December 18, 2018 / Notices
f. Location: On an unnamed stream, in
Petersburg Borough, Alaska. The project
would occupy 0.1 acre of United States lands
administered by U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16
U.S.C. 791 (a)–825(r).
h. Applicant Contact: Douglas Leen, P.O.
Box 341, Petersburg, AK 99833; (907) 518–
0335; mail@dougleen.com.
i. FERC Contact: Ryan Hansen at (202)
502–8074; or email at ryan.hansen@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues that wish to cooperate
in the preparation of the environmental
document should follow the instructions for
filing such requests described in item l
below. Cooperating agencies should note the
Commission’s policy that agencies that
cooperate in the preparation of the
environmental document cannot also
intervene. See, 94 FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR
of the Commission’s regulations, if any
resource agency, Indian Tribe, or person
believes that an additional scientific study
should be conducted in order to form an
adequate factual basis for a complete analysis
of the application on its merit, the resource
agency, Indian Tribe, or person must file a
request for a study with the Commission not
later than 60 days from the date of filing of
the application, and serve a copy of the
request on the applicant.
l. Deadline for filing additional study
requests and requests for cooperating agency
status: January 28, 2019.
The Commission strongly encourages
electronic filing. Please file additional study
requests and requests for cooperating agency
status using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp.
For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov,
(866) 208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please send
a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any
filing should include docket number P–
14862–001.
m. The application is not ready for
environmental analysis at this time.
n. The proposed hydroelectric project
would consist of: an intake located in either
a containment pond created by 50 sand bags
or an existing pond; a penstock consisting of
an up to 400-foot-long, 0.5-foot-diameter PVC
pipe; one turbine unit with a capacity of 1.5
kilowatts; a 4-foot-long, 3-foot-wide, 7-foothigh lumber shed on a cement pad; a 150foot-long transmission line; and appurtenant
facilities.
o. A copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on the
Commission’s website at https://www.ferc.gov
using the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in the
docket number field to access the document.
For assistance, contact FERC Online Support.
A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.asp to
VerDate Sep<11>2014
00:45 Dec 18, 2018
Jkt 247001
be notified via email of new filings and
issuances related to this or other pending
projects. For assistance, contact FERC Online
Support.
p. Procedural schedule: The application
will be processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made as
appropriate.
Issue Notice of Acceptance March 2019
Issue Scoping Document 1 for comments
April 2019
Comments on Scoping Document 1 May
2019
Issue notice of ready for environmental
analysis May 2019
Commission issues EA August 2019
Comments on EA September 2019
Dated: December 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27294 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 619–000]
Pacific Gas and Electric Company and
City of Santa Clara, California; Notice
of Authorization for Continued Project
Operation
On December 12, 2016, Pacific Gas
and Electric Company and City of Santa
Clara, California, licensees for the Bucks
Creek Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Bucks Creek Hydroelectric Project
is located on Bucks, Grizzly, and Milk
Ranch Creek in Plumas County,
California.
The license for Project No. 619 was
issued for a period ending December 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
64823
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 619 is
issued to the licensee for a period
effective January 1, 2019 through
December 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before December 31, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, Pacific Gas and
Electric Company and City of Santa
Clara, are authorized to continue
operation of the Bucks Creek
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: December 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–27310 Filed 12–17–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–14–000]
Cottonwood Energy Company LP;
Notice of Institution of Section 206
Proceeding and Refund Effective Date
On December 12, 2018, the
Commission issued an order in Docket
No. EL19–14–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into whether Cottonwood
Energy Company LP’s Rate Schedule
FERC No. 1 may be unjust and
unreasonable. Cottonwood Energy
Company LP, 165 FERC 61,228 (2018).
The refund effective date in Docket
No. EL19–14–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 83, Number 242 (Tuesday, December 18, 2018)]
[Notices]
[Pages 64822-64823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-27294]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-14862-001]
Douglas Leen; Notice of Application Tendered for Filing With the
Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original minor license.
b. Project No.: P-14862-001.
c. Date filed: November 28, 2018.
d. Applicant: Mr. Douglas Leen.
e. Name of Project: Kupeanof Microhydro Project.
[[Page 64823]]
f. Location: On an unnamed stream, in Petersburg Borough,
Alaska. The project would occupy 0.1 acre of United States lands
administered by U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-
825(r).
h. Applicant Contact: Douglas Leen, P.O. Box 341, Petersburg, AK
99833; (907) 518-0335; mail@dougleen.com.
i. FERC Contact: Ryan Hansen at (202) 502-8074; or email at
ryan.hansen@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal
agencies with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of
the environmental document should follow the instructions for filing
such requests described in item l below. Cooperating agencies should
note the Commission's policy that agencies that cooperate in the
preparation of the environmental document cannot also intervene.
See, 94 FERC ] 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person
believes that an additional scientific study should be conducted in
order to form an adequate factual basis for a complete analysis of
the application on its merit, the resource agency, Indian Tribe, or
person must file a request for a study with the Commission not later
than 60 days from the date of filing of the application, and serve a
copy of the request on the applicant.
l. Deadline for filing additional study requests and requests
for cooperating agency status: January 28, 2019.
The Commission strongly encourages electronic filing. Please
file additional study requests and requests for cooperating agency
status using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free),
or (202) 502-8659 (TTY). In lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-14862-001.
m. The application is not ready for environmental analysis at
this time.
n. The proposed hydroelectric project would consist of: an
intake located in either a containment pond created by 50 sand bags
or an existing pond; a penstock consisting of an up to 400-foot-
long, 0.5-foot-diameter PVC pipe; one turbine unit with a capacity
of 1.5 kilowatts; a 4-foot-long, 3-foot-wide, 7-foot-high lumber
shed on a cement pad; a 150-foot-long transmission line; and
appurtenant facilities.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
p. Procedural schedule: The application will be processed
according to the following preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate.
Issue Notice of Acceptance March 2019
Issue Scoping Document 1 for comments April 2019
Comments on Scoping Document 1 May 2019
Issue notice of ready for environmental analysis May 2019
Commission issues EA August 2019
Comments on EA September 2019
Dated: December 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-27294 Filed 12-17-18; 8:45 am]
BILLING CODE 6717-01-P