Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA, 64024 [2018-26976]
Download as PDF
64024
Federal Register / Vol. 83, No. 239 / Thursday, December 13, 2018 / Rules and Regulations
Vessels able to pass through the
bridge in the closed position may do so
at anytime. The bridge will be able to
open for emergencies if at least 72-hour
notice is given to the bridge operator.
There is no immediate alternate route
for vessels to pass. The Coast Guard will
also inform the users of the waterway
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridge so that
vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 10, 2018.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2018–26997 Filed 12–12–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–1053]
Drawbridge Operation Regulation;
Lake Washington Ship Canal, Seattle,
WA
AGENCY:
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Ballard
Bridge, mile 1.1, the Fremont Bridge,
mile 2.6, and the University Bridge,
mile 4.3, all crossing the Lake
Washington Ship Canal at Seattle, WA.
The deviation is necessary to
accommodate re-routed roadway traffic
while the Alaskan Way Viaduct is
closed. This deviation allows the subject
bridges to remain in the closed-tonavigation position to allow congested
roadway traffic to move easier.
DATES: This deviation is effective from
7 a.m. on January 11, 2019, to 7 p.m. on
February 9, 2019.
ADDRESSES: The docket for this
deviation, USCG–2018–1053 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH.’’ Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator,
Thirteenth Coast Guard District;
telephone 206–220–7282, email d13-pfd13bridges@uscg.mil.
SUPPLEMENTARY INFORMATION: Seattle
Department of Transportation (SDOT),
the owner of the impacted drawbridges,
requested a temporary deviation from
the operating schedule for the Ballard
Bridge, mile 1.1, the Fremont Bridge,
mile 2.6, and the University Bridge,
SUMMARY:
Bridge
Date
amozie on DSK3GDR082PROD with RULES
Fremont .......................................................
Fremont .......................................................
Ballard .........................................................
Ballard .........................................................
University ....................................................
University ....................................................
Jan
Jan
Jan
Jan
Jan
Jan
Waterway usage on the Lake
Washington Ship Canal range from
commercial tug and barge to small
pleasure craft. Vessels able to pass
through the subject bridges in the
closed-to-navigation position may do so
at any time. All three bridges will not
be able to open for emergencies, and
there is no immediate alternate route for
vessels to pass. The Coast Guard will
also inform the users of the waterways
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridges so
that vessel operators can arrange their
VerDate Sep<11>2014
16:00 Dec 12, 2018
mile 4.3, all crossing the Lake
Washington Ship Canal at Seattle, WA,
to facilitate morning and afternoon rerouted roadway traffic. Washington
Department of Transportation is closing
the Alaskan Way Viaduct forever, and
have not finished building new ramp
approaches to the new SR99 Tunnel
into Seattle, WA. During the closure of
the viaduct, SDOT will be re-routing
roadway traffic into Seattle across the
Lake Washington Ship Canal, and
requested to extend the closure hours of
the subject bridges. The Ballard Bridge
provides a vertical clearance of 29 feet
in the closed-to-navigation position; the
Fremont Bridge provides a vertical
clearance of 14 feet (31 feet of vertical
clearance for the center 36 horizontal
feet) in the closed-to-navigation
position; the University Bridge provides
a vertical clearance of 30 feet (45 feet at
the center) in the closed-to-navigation
position. Vertical clearances refer to the
Mean Water Level of Lake Washington.
The normal operating schedule for the
three subject bridges is in 33 CFR
117.1051(d).
During this deviation period, the three
subject bridge draws need not open per
the following table for vessels of less
than 1000 gross tons, unless the vessel
has in tow a vessel of 1000 gross tones
or more:
Jkt 247001
11,
11,
11,
11,
11,
11,
2019
2019
2019
2019
2019
2019
to
to
to
to
to
to
Feb
Feb
Feb
Feb
Feb
Feb
9,
9,
9,
9,
9,
9,
Time
2019
2019
2019
2019
2019
2019
.....................
.....................
.....................
.....................
.....................
.....................
7 a.m. to 10 a.m ........................................
3:30 p.m. to 7 p.m .....................................
7 a.m. to 10 a.m ........................................
3:30 p.m. to 7 p.m .....................................
7 a.m. to 10 a.m ........................................
3:30 p.m. to 7 p.m .....................................
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the three drawbridges must return to
their regular operating schedules
immediately at the end of the effective
period of this temporary deviation. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
DEPARTMENT OF DEFENSE
Dated: December 3, 2018.
Steven M. Fischer,
Bridge Chief Administrator, Thirteenth Coast
Guard District.
AGENCY:
[FR Doc. 2018–26976 Filed 12–12–18; 8:45 am]
SUMMARY:
BILLING CODE 9110–04–P
PO 00000
Frm 00002
Fmt 4700
Sfmt 4700
Span
position
Closed.
Closed.
Closed.
Closed.
Closed.
Closed.
Department of the Army, Corps of
Engineers
33 CFR Part 334
Military Ocean Terminal Concord, CA;
Restricted Area
U.S. Army Corps of Engineers,
DoD.
ACTION:
Direct final rule.
The U.S. Army Military
Surface Deployment and Distribution
E:\FR\FM\13DER1.SGM
13DER1
Agencies
[Federal Register Volume 83, Number 239 (Thursday, December 13, 2018)]
[Rules and Regulations]
[Page 64024]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26976]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-1053]
Drawbridge Operation Regulation; Lake Washington Ship Canal,
Seattle, WA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Ballard Bridge, mile 1.1, the
Fremont Bridge, mile 2.6, and the University Bridge, mile 4.3, all
crossing the Lake Washington Ship Canal at Seattle, WA. The deviation
is necessary to accommodate re-routed roadway traffic while the Alaskan
Way Viaduct is closed. This deviation allows the subject bridges to
remain in the closed-to-navigation position to allow congested roadway
traffic to move easier.
DATES: This deviation is effective from 7 a.m. on January 11, 2019, to
7 p.m. on February 9, 2019.
ADDRESSES: The docket for this deviation, USCG-2018-1053 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven Fischer, Bridge
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282,
email [email protected].
SUPPLEMENTARY INFORMATION: Seattle Department of Transportation (SDOT),
the owner of the impacted drawbridges, requested a temporary deviation
from the operating schedule for the Ballard Bridge, mile 1.1, the
Fremont Bridge, mile 2.6, and the University Bridge, mile 4.3, all
crossing the Lake Washington Ship Canal at Seattle, WA, to facilitate
morning and afternoon re-routed roadway traffic. Washington Department
of Transportation is closing the Alaskan Way Viaduct forever, and have
not finished building new ramp approaches to the new SR99 Tunnel into
Seattle, WA. During the closure of the viaduct, SDOT will be re-routing
roadway traffic into Seattle across the Lake Washington Ship Canal, and
requested to extend the closure hours of the subject bridges. The
Ballard Bridge provides a vertical clearance of 29 feet in the closed-
to-navigation position; the Fremont Bridge provides a vertical
clearance of 14 feet (31 feet of vertical clearance for the center 36
horizontal feet) in the closed-to-navigation position; the University
Bridge provides a vertical clearance of 30 feet (45 feet at the center)
in the closed-to-navigation position. Vertical clearances refer to the
Mean Water Level of Lake Washington. The normal operating schedule for
the three subject bridges is in 33 CFR 117.1051(d).
During this deviation period, the three subject bridge draws need
not open per the following table for vessels of less than 1000 gross
tons, unless the vessel has in tow a vessel of 1000 gross tones or
more:
----------------------------------------------------------------------------------------------------------------
Bridge Date Time Span position
----------------------------------------------------------------------------------------------------------------
Fremont.............................. Jan 11, 2019 to Feb 9, 7 a.m. to 10 a.m........ Closed.
2019.
Fremont.............................. Jan 11, 2019 to Feb 9, 3:30 p.m. to 7 p.m...... Closed.
2019.
Ballard.............................. Jan 11, 2019 to Feb 9, 7 a.m. to 10 a.m........ Closed.
2019.
Ballard.............................. Jan 11, 2019 to Feb 9, 3:30 p.m. to 7 p.m...... Closed.
2019.
University........................... Jan 11, 2019 to Feb 9, 7 a.m. to 10 a.m........ Closed.
2019.
University........................... Jan 11, 2019 to Feb 9, 3:30 p.m. to 7 p.m...... Closed.
2019.
----------------------------------------------------------------------------------------------------------------
Waterway usage on the Lake Washington Ship Canal range from
commercial tug and barge to small pleasure craft. Vessels able to pass
through the subject bridges in the closed-to-navigation position may do
so at any time. All three bridges will not be able to open for
emergencies, and there is no immediate alternate route for vessels to
pass. The Coast Guard will also inform the users of the waterways
through our Local and Broadcast Notices to Mariners of the change in
operating schedule for the bridges so that vessel operators can arrange
their transits to minimize any impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e), the three drawbridges must
return to their regular operating schedules immediately at the end of
the effective period of this temporary deviation. This deviation from
the operating regulations is authorized under 33 CFR 117.35.
Dated: December 3, 2018.
Steven M. Fischer,
Bridge Chief Administrator, Thirteenth Coast Guard District.
[FR Doc. 2018-26976 Filed 12-12-18; 8:45 am]
BILLING CODE 9110-04-P