Notice of Schedule for Environmental Review of the Palmyra to Ogden A-Line Project; Northern Natural Gas Company, 64123-64124 [2018-26948]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 239 / Thursday, December 13, 2018 / Notices
Description: eTariff filing per 1430:
Form 501–G Filing to be effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5273.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–437–000.
Applicants: American Midstream
(Midla), LLC.
Description: eTariff filing per 1430:
Midla Submission of Form 501–G to be
effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5281.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–438–000.
Applicants: Trans-Union Interstate
Pipeline, L.P.
Description: eTariff filing per 1430:
Trans-Union Form 501–G to be effective
N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5288.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–439–000.
Applicants: Stagecoach Pipeline &
Storage Company LL.
Description: eTariff filing per 1430:
Stagecoach Pipeline & Storage Company
LLC.—Form No. 501–G to be effective
N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5289.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–440–000.
Applicants: Florida Southeast
Connection, LLC.
Description: eTariff filing per 1430:
Form 501–G to be effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5303.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–441–000.
Applicants: WTG Hugoton, LP.
Description: eTariff filing per 1430:
WTG Hugoton FERC Form 501–G Filing
to be effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5305.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–442–000.
Applicants: West Texas Gas, Inc.
Description: eTariff filing per 1430:
West Texas Gas FERC Form 501–G
Filing to be effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5306.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–443–000.
Applicants: Western Gas Interstate
Company.
Description: eTariff filing per 1430:
Western Gas Interstate FERC Form 501–
G Filing to be effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5310.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–444–000.
VerDate Sep<11>2014
17:12 Dec 12, 2018
Jkt 247001
Applicants: Sabal Trail Transmission,
LLC.
Description: eTariff filing per 1430:
Sabal Trail Form 501–G to be effective
N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5321.
Comments Due: 5 p.m. ET 12/18/18.
Docket Numbers: RP19–445–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: eTariff filing per 1430:
120618 Form 501–G Filing to be
effective N/A.
Filed Date: 12/6/18.
Accession Number: 20181206–5326.
Comments Due: 5 p.m. ET 12/18/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 7, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26956 Filed 12–12–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–1–000]
Notice of Schedule for Environmental
Review of the Palmyra to Ogden A-Line
Project; Northern Natural Gas
Company
On October 3, 2018, Northern Natural
Gas Company (Northern) filed an
application in Docket No. CP19–1–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(b) of the Natural Gas Act to
abandon certain natural gas pipeline
facilities. The proposed project is
known as the Palmyra to Ogden A-Line
Project (Project), and would allow
Northern to abandon approximately
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
64123
146.6 miles of 24-inch-diameter
pipeline to provide for safer long-term
operation of the mainline.
On October 17, 2018, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA May 13, 2019
90-day Federal Authorization
Decision Deadline August 11,
2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Northern proposes to isolate and
abandon by sale to DKM Enterprises,
LLC (DKM) approximately 146.6 miles
of 24-inch-diameter pipeline on
Northern’s M580A and M530A system
(collectively referred to as the A-line) in
Otoe and Cass counties in Nebraska, and
Mills, Pottawattamie, Cass, Audubon,
Guthrie, Greene, and Boone counties in
Iowa. Northern indicates that DKM
intends to salvage the abandoned
pipeline.
To abandon the pipeline, Northern
would disconnect and cap the A-line at
five interconnections where it is linked
to other system facilities. Ground
disturbances would be limited to one
location in Otoe County, Nebraska, and
four locations in Mills, Guthrie, and
Boone (two locations) counties, Iowa,
where the A-line would be disconnected
from Northern’s existing pipeline
system.
Background
On November 14, 2018 the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Palmyra to Ogden ALine Project and Request for Comments
on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; Native American tribes;
other interested parties; and local
libraries and newspapers. Comments on
the NOI should be received by the
Commission in Washington, DC on or
E:\FR\FM\13DEN1.SGM
13DEN1
64124
Federal Register / Vol. 83, No. 239 / Thursday, December 13, 2018 / Notices
before 5:00 p.m. Eastern Time on
December 14, 2018. All substantive
comments filed in the Commission’s
public record will be addressed in the
EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP19–1), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 7, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26948 Filed 12–12–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–464–000]
amozie on DSK3GDR082PROD with NOTICES1
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Vermillion Power, L.L.C.
This is a supplemental notice in the
above-referenced Innovative Vermillion
Power, L.L.C.’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
VerDate Sep<11>2014
17:12 Dec 12, 2018
Jkt 247001
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 27,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 7, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26955 Filed 12–12–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–9–000]
Electric Quarterly Report Users Group
Meeting; Notice of Electric Quarterly
Report Users Group Meeting
Commission (Commission) will hold the
next Electric Quarterly Report (EQR)
Users Group meeting. The meeting will
take place from 1:00 p.m. to 5:00 p.m.
(EST) in the Commission Meeting Room
at 888 First Street NE, Washington, DC
20426. All interested persons are invited
to attend. For those unable to attend in
person, access to the meeting will be
available via webcast.
This meeting provides a forum for
dialogue between Commission staff and
EQR users to discuss potential
improvements to the EQR program and
the EQR filing process. Prior to the
meeting, staff would like input on
discussion topics. Individuals may
suggest agenda topics for consideration
by emailing EQRUsersGroup@ferc.gov.
Please note that matters pending
before the Commission and subject to ex
parte limitations cannot be discussed at
this meeting. An agenda of the meeting
will be provided in a subsequent notice.
Due to the nature of the discussion,
those interested in participating are
encouraged to attend in person. All
interested persons (whether attending in
person or via webcast) are asked to
register online at https://www.ferc.gov/
whats-new/registration/02-14-19form.asp. There is no registration fee.
Anyone with internet access can listen
to the meeting by navigating to
www.ferc.gov’s Calendar of Events,
locating the EQR Users Group Meeting
on the Calendar, and clicking on the
link to the webcast. The webcast will
allow persons to listen to the technical
conference and they can email questions
during the meeting to EQRUsersGroup@
ferc.gov.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
For more information about the EQR
Users Group meeting, please contact Jeff
Sanders of the Commission’s Office of
Enforcement at (202) 502–6455, or send
an email to EQRUsersGroup@ferc.gov.
Dated: December 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–26999 Filed 12–12–18; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on February 14, 2019,
staff of the Federal Energy Regulatory
PO 00000
Frm 00028
Fmt 4703
Sfmt 9990
E:\FR\FM\13DEN1.SGM
13DEN1
Agencies
[Federal Register Volume 83, Number 239 (Thursday, December 13, 2018)]
[Notices]
[Pages 64123-64124]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26948]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-1-000]
Notice of Schedule for Environmental Review of the Palmyra to
Ogden A-Line Project; Northern Natural Gas Company
On October 3, 2018, Northern Natural Gas Company (Northern) filed
an application in Docket No. CP19-1-000 requesting a Certificate of
Public Convenience and Necessity pursuant to section 7(b) of the
Natural Gas Act to abandon certain natural gas pipeline facilities. The
proposed project is known as the Palmyra to Ogden A-Line Project
(Project), and would allow Northern to abandon approximately 146.6
miles of 24-inch-diameter pipeline to provide for safer long-term
operation of the mainline.
On October 17, 2018, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA May 13, 2019
90-day Federal Authorization Decision Deadline August 11, 2019
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Northern proposes to isolate and abandon by sale to DKM
Enterprises, LLC (DKM) approximately 146.6 miles of 24-inch-diameter
pipeline on Northern's M580A and M530A system (collectively referred to
as the A-line) in Otoe and Cass counties in Nebraska, and Mills,
Pottawattamie, Cass, Audubon, Guthrie, Greene, and Boone counties in
Iowa. Northern indicates that DKM intends to salvage the abandoned
pipeline.
To abandon the pipeline, Northern would disconnect and cap the A-
line at five interconnections where it is linked to other system
facilities. Ground disturbances would be limited to one location in
Otoe County, Nebraska, and four locations in Mills, Guthrie, and Boone
(two locations) counties, Iowa, where the A-line would be disconnected
from Northern's existing pipeline system.
Background
On November 14, 2018 the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Palmyra to Ogden
A-Line Project and Request for Comments on Environmental Issues (NOI).
The NOI was sent to affected landowners; federal, state, and local
government agencies; elected officials; Native American tribes; other
interested parties; and local libraries and newspapers. Comments on the
NOI should be received by the Commission in Washington, DC on or
[[Page 64124]]
before 5:00 p.m. Eastern Time on December 14, 2018. All substantive
comments filed in the Commission's public record will be addressed in
the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP19-1), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: December 7, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-26948 Filed 12-12-18; 8:45 am]
BILLING CODE 6717-01-P