Combined Notice of Filings #1, 63849-63851 [2018-26892]
Download as PDF
Federal Register / Vol. 83, No. 238 / Wednesday, December 12, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–19–000]
amozie on DSK3GDR082PROD with NOTICES1
Magnolia LNG, LLC; Notice of
Application
Take notice that on November 19,
2018, Magnolia LNG, LLC (Magnolia
LNG), 1001 McKinney, Suite 600,
Houston, Texas 77002, filed an
application in Docket No. CP19–19–000,
pursuant to Section 3(a) of the Natural
Gas Act and the Federal Energy
Regulatory Commission’s (Commission)
regulations seeking an amendment to
the authorization granted by the
Commission on April 15, 2016, in
Docket No. CP14–347–000. Through its
amendment application, Magnolia LNG
seeks authorization from the
Commission to increase the total
liquefied natural gas production
capacity of its liquefaction project from
the currently authorized 8 million tons
per annum (MTPA) to 8.8 MTPA, or 1.4
billion cubic feet per day. The facilities
are located in Lake Charles, Calcasieu
Parish, Louisiana, as more fully
described in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Kinga
Doris, Magnolia LNG, LLC, 1001
McKinney, Suite 600, Houston, Texas
77002, (713) 815–6921; or David L.
Wochner, K&L Gates LLP, 1601 K Street,
NW, Washington, DC 20006, (202) 778–
9000, David.Wochner@klgates.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
VerDate Sep<11>2014
18:39 Dec 11, 2018
Jkt 247001
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
63849
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: December 27, 2018.
Dated: December 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26894 Filed 12–11–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–137–000.
Applicants: Vermont Transco LLC.
Description: Response to October 9,
2018 Deficiency Letter of Vermont
Transco LLC.
Filed Date: 10/24/18.
Accession Number: 20181024–5167.
Comments Due: 5 p.m. ET 12/13/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–29–000.
Applicants: Crocker Wind Farm, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crocker Wind Farm,
LLC.
Filed Date: 12/3/18.
Accession Number: 20181203–5142.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: EG19–30–000.
Applicants: Wheelabrator Concord
Company, L.P.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Wheelabrator Concord Company, L.P.
Filed Date: 12/3/18.
Accession Number: 20181203–5236.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: EG19–31–000.
Applicants: Vermillion Power, L.L.C.
Description: Self-Certification of EG or
FC of Vermillion Power, L.L.C.
Filed Date: 12/3/18.
Accession Number: 20181203–5265.
Comments Due: 5 p.m. ET 12/24/18.
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\12DEN1.SGM
12DEN1
amozie on DSK3GDR082PROD with NOTICES1
63850
Federal Register / Vol. 83, No. 238 / Wednesday, December 12, 2018 / Notices
Docket Numbers: ER12–162–021;
ER11–2044–026; ER13–1266–018; ER15–
2211–015.
Applicants: Bishop Hill Energy II
LLC, CalEnergy, LLC, MidAmerican
Energy Company, MidAmerican Energy
Services, LLC.
Description: Notice of Non-Material
Change in Status of the Berkshire
Hathaway Central Parties.
Filed Date: 12/3/18.
Accession Number: 20181203–5088.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: ER19–117–001.
Applicants: Innovative Solar 54, LLC.
Description: Tariff Amendment:
amendment to 1 to be effective 12/9/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5005.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–118–001.
Applicants: Innovative Solar 67, LLC.
Description: Tariff Amendment:
amendment to 1 to be effective 12/6/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5007.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–396–001.
Applicants: AES Shady Point, LLC.
Description: Tariff Amendment: AES
Shady Point Errata to MBR Tariff to be
effective 11/27/2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5001.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–486–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–12–04 Mesquite Solar 5 LGIA to
be effective 12/3/2018.
Filed Date: 12/4/18.
Accession Number: 20181204–5141.
Comments Due: 5 p.m. ET 12/26/18.
Docket Numbers: ER19–487–000.
Applicants: GridLiance West LLC.
Description: § 205(d) Rate Filing: GLW
Certificate of Concurrence update to be
effective 11/10/2018.
Filed Date: 12/4/18.
Accession Number: 20181204–5143.
Comments Due: 5 p.m. ET 12/26/18.
Docket Numbers: ER19–488–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing:
Housekeeping Clarifications and
Revisions to OATT to be effective 2/4/
2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5000.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–489–000.
Applicants: South Carolina Electric &
Gas Company.
Description: § 205(d) Rate Filing:
McCormick CPW NITSA to be effective
1/1/2019.
VerDate Sep<11>2014
18:39 Dec 11, 2018
Jkt 247001
Filed Date: 12/6/18.
Accession Number: 20181206–5002.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–490–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
Agmt to Replace BPA CB 1L1 at Malin
to be effective 2/4/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5003.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–491–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2018–12–06_SA 3020 OTP–OTP 1st
Revised E&P (J510) to be effective 11/27/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5032.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–492–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of SA No. 4795;
Queue No. AC2–139 to be effective
1/11/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5067.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–493–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2018–12–06_SA 3219 Flying Cow WindOTP E&P (J493 J510) to be effective
12/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5120.
Comments Due: 5 p.m. ET
12/27/18.
Docket Numbers: ER19–494–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1628R14 Western Farmers Electric
Cooperative NITSA NOA to be effective
12/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5146.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–495–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of SA No. 4732;
Queue No. AC1–202 to be effective
1/11/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5153.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–496–000.
Applicants: Southern California
Edison Company.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
LGIA Rabbitbrush Solar Project SA No.
214 to be effective 2/5/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5163.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–497–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 4054, Queue No. Z2–030
to be effective 11/25/2014.
Filed Date: 12/6/18.
Accession Number: 20181206–5175.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–498–000.
Applicants: California Independent
System Operator Corporation.
Description: Tariff Cancellation:
2018–12–06 Notice of Cancellation EIM
Implementation Agreement with Puget
Sound to be effective 2/5/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5229.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–499–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Invenergy Solar E&P Agreement to be
effective 11/19/2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5230.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–500–000.
Applicants: Baltimore Gas and
Electric Company, PJM Interconnection,
L.L.C.
Description: eTariff filing per 1450:
BGE submits revisions to OATT, Att. H–
2A re: Tax Cuts and Jobs Act in EL18–
64 to be effective 10/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5232.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–501–000.
Applicants: California Independent
System Operator Corporation.
Description: Tariff Cancellation:
2018–12–06 Notice of Cancellation EIM
Implement. Agrmnt.—Arizona Public
Service to be effective 2/5/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5233.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–502–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Sempra Solar Development (Timberland
Solar) LGIA Filing to be effective 11/28/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5234.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–503–000.
Applicants: Pacific Gas and Electric
Company.
E:\FR\FM\12DEN1.SGM
12DEN1
Federal Register / Vol. 83, No. 238 / Wednesday, December 12, 2018 / Notices
Description: Tariff Cancellation:
Notice of Termination of Proxima Solar
E&P Agreement to be effective 12/3/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206–5237.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–504–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation Distribution
Service Agreement Decade Energy, LLC
to be effective 11/27/2017.
Filed Date: 12/6/18.
Accession Number: 20181206–5251.
Comments Due: 5 p.m. ET 12/27/18.
amozie on DSK3GDR082PROD with NOTICES1
Docket Numbers: ER19–506–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA No. 3198; Queue
No. T157 to be effective 1/16/2012.
Filed Date: 12/6/18.
Accession Number: 20181206–5269.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19–507–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–12–06_Revisions to Attachment
FF re Cure Period for Recertification to
be effective 2/6/2019.
Filed Date: 12/6/18.
Accession Number: 20181206–5280.
Comments Due: 5 p.m. ET 12/27/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26892 Filed 12–11–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:39 Dec 11, 2018
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–21–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on November 27,
2018, Columbia Gas Transmission, LLC
(Columbia) 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in Docket No. CP19–21–000 a prior
notice request pursuant to sections
157.205 and 157.213 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Columbia’s
blanket certificate issued in Docket No.
CP83–76–000, to construct and operate
its Artemas A Storage Field New Wells
Project (Project). The Project consists of
three new directional storage wells and
related pipelines and appurtenances at
Columbia’s Artemas A Storage Field,
located in Bedford County,
Pennsylvania.
Columbia states that the Project is part
of the efforts to improve storage
deliverability of the Artemas A Storage
Field, as part of the Modernization II
Settlement that it entered with its
shippers. The Artemas A Storage Field
currently consists of 17 active wells and
is operated with a total capacity of
14.457 billion cubic feet (Bcf) consisting
of 13.70 Bcf of certificated base and
working gas, and approximately 0.757
Bcf of residual native gas. Columbia
asserts that the Project could provide 58
to 79 Million cubic feet per day of
restored deliverability to the Columbia
storage system. Columbia avers that the
proposed three new wells will be drilled
at three of four potential well sites that
are currently under evaluation and that
the selection will depend upon which
combination of sites will provide the
desired restored deliverability with the
least risk. Columbia states that it will
notify the Commission of the three well
sites selected for the Project prior
commencement of construction.
Columbia estimates the cost of the
Project to be between $25.4 million to
$28.2 million, depending upon which
three of the four potential well sites are
selected, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
63851
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas,
77002–2700, by telephone at (832) 320–
5685, by facsimile at (832) 320–6685, or
by email at linda_farquhar@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 83, Number 238 (Wednesday, December 12, 2018)]
[Notices]
[Pages 63849-63851]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26892]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-137-000.
Applicants: Vermont Transco LLC.
Description: Response to October 9, 2018 Deficiency Letter of
Vermont Transco LLC.
Filed Date: 10/24/18.
Accession Number: 20181024-5167.
Comments Due: 5 p.m. ET 12/13/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-29-000.
Applicants: Crocker Wind Farm, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Crocker Wind Farm, LLC.
Filed Date: 12/3/18.
Accession Number: 20181203-5142.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: EG19-30-000.
Applicants: Wheelabrator Concord Company, L.P.
Description: Self-Certification of Exempt Wholesale Generator
Status of Wheelabrator Concord Company, L.P.
Filed Date: 12/3/18.
Accession Number: 20181203-5236.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: EG19-31-000.
Applicants: Vermillion Power, L.L.C.
Description: Self-Certification of EG or FC of Vermillion Power,
L.L.C.
Filed Date: 12/3/18.
Accession Number: 20181203-5265.
Comments Due: 5 p.m. ET 12/24/18.
Take notice that the Commission received the following electric
rate filings:
[[Page 63850]]
Docket Numbers: ER12-162-021; ER11-2044-026; ER13-1266-018; ER15-
2211-015.
Applicants: Bishop Hill Energy II LLC, CalEnergy, LLC, MidAmerican
Energy Company, MidAmerican Energy Services, LLC.
Description: Notice of Non-Material Change in Status of the
Berkshire Hathaway Central Parties.
Filed Date: 12/3/18.
Accession Number: 20181203-5088.
Comments Due: 5 p.m. ET 12/24/18.
Docket Numbers: ER19-117-001.
Applicants: Innovative Solar 54, LLC.
Description: Tariff Amendment: amendment to 1 to be effective 12/9/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5005.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-118-001.
Applicants: Innovative Solar 67, LLC.
Description: Tariff Amendment: amendment to 1 to be effective 12/6/
2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5007.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-396-001.
Applicants: AES Shady Point, LLC.
Description: Tariff Amendment: AES Shady Point Errata to MBR Tariff
to be effective 11/27/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5001.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-486-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2018-12-04 Mesquite Solar 5
LGIA to be effective 12/3/2018.
Filed Date: 12/4/18.
Accession Number: 20181204-5141.
Comments Due: 5 p.m. ET 12/26/18.
Docket Numbers: ER19-487-000.
Applicants: GridLiance West LLC.
Description: Sec. 205(d) Rate Filing: GLW Certificate of
Concurrence update to be effective 11/10/2018.
Filed Date: 12/4/18.
Accession Number: 20181204-5143.
Comments Due: 5 p.m. ET 12/26/18.
Docket Numbers: ER19-488-000.
Applicants: Idaho Power Company.
Description: Sec. 205(d) Rate Filing: Housekeeping Clarifications
and Revisions to OATT to be effective 2/4/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5000.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-489-000.
Applicants: South Carolina Electric & Gas Company.
Description: Sec. 205(d) Rate Filing: McCormick CPW NITSA to be
effective 1/1/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5002.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-490-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA Agmt to Replace BPA CB
1L1 at Malin to be effective 2/4/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5003.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-491-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2018-12-06_SA 3020 OTP-OTP
1st Revised E&P (J510) to be effective 11/27/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5032.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-492-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of SA No.
4795; Queue No. AC2-139 to be effective 1/11/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5067.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-493-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2018-12-06_SA 3219 Flying
Cow Wind-OTP E&P (J493 J510) to be effective 12/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5120.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-494-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1628R14 Western Farmers
Electric Cooperative NITSA NOA to be effective 12/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5146.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-495-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of SA No.
4732; Queue No. AC1-202 to be effective 1/11/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5153.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-496-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Rabbitbrush Solar
Project SA No. 214 to be effective 2/5/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5163.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-497-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, Service
Agreement No. 4054, Queue No. Z2-030 to be effective 11/25/2014.
Filed Date: 12/6/18.
Accession Number: 20181206-5175.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-498-000.
Applicants: California Independent System Operator Corporation.
Description: Tariff Cancellation: 2018-12-06 Notice of Cancellation
EIM Implementation Agreement with Puget Sound to be effective 2/5/2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5229.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-499-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Invenergy Solar E&P
Agreement to be effective 11/19/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5230.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-500-000.
Applicants: Baltimore Gas and Electric Company, PJM
Interconnection, L.L.C.
Description: eTariff filing per 1450: BGE submits revisions to
OATT, Att. H-2A re: Tax Cuts and Jobs Act in EL18-64 to be effective
10/1/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5232.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-501-000.
Applicants: California Independent System Operator Corporation.
Description: Tariff Cancellation: 2018-12-06 Notice of Cancellation
EIM Implement. Agrmnt.--Arizona Public Service to be effective 2/5/
2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5233.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-502-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Sempra Solar Development
(Timberland Solar) LGIA Filing to be effective 11/28/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5234.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-503-000.
Applicants: Pacific Gas and Electric Company.
[[Page 63851]]
Description: Tariff Cancellation: Notice of Termination of Proxima
Solar E&P Agreement to be effective 12/3/2018.
Filed Date: 12/6/18.
Accession Number: 20181206-5237.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-504-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Notice of Cancellation
Distribution Service Agreement Decade Energy, LLC to be effective 11/
27/2017.
Filed Date: 12/6/18.
Accession Number: 20181206-5251.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-506-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA No. 3198;
Queue No. T157 to be effective 1/16/2012.
Filed Date: 12/6/18.
Accession Number: 20181206-5269.
Comments Due: 5 p.m. ET 12/27/18.
Docket Numbers: ER19-507-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-12-06_Revisions to
Attachment FF re Cure Period for Recertification to be effective 2/6/
2019.
Filed Date: 12/6/18.
Accession Number: 20181206-5280.
Comments Due: 5 p.m. ET 12/27/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-26892 Filed 12-11-18; 8:45 am]
BILLING CODE 6717-01-P