Clean Air Act Prevention of Significant Deterioration Permit Issued to Palmdale Energy LLC for the Palmdale Energy Project, 63638 [2018-26687]
Download as PDF
63638
Federal Register / Vol. 83, No. 237 / Tuesday, December 11, 2018 / Notices
stock washer can be neither technically
nor economically feasible to control.
In general, all NSPS standards require
initial notifications, performance tests,
and periodic reports by the owners/
operators of the affected facilities. They
are also required to maintain records of
the occurrence and duration of any
startup, shutdown, or malfunction in
the operation of an affected facility, or
any period during which the monitoring
system is inoperative. These
notifications, reports, and records are
essential in determining compliance
with 40 CFR part 60, subpart BB.
Form numbers: None.
Respondents/affected entities: Kraft
pulp mills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart BB).
Estimated number of respondents: 97
(total).
Frequency of response: Initially,
occasionally and semiannually.
Total estimated burden: 13,900 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $5,020,000 (per
year), which includes $3,510,000 in
annualized capital/startup and/or
operation & maintenance costs.
Changes in the estimates: There is an
adjustment decrease in the estimated
burden and cost as currently identified
in the OMB Inventory of Approved
Burdens. The decrease is not due to any
program changes. The change in burden
is due to an industry decline since the
last ICR renewal, resulting in a decrease
in the number of respondent subject to
the standard.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018–26729 Filed 12–10–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–R09–OAR–2017–0473; FRL–9987–65–
Region 9]
Clean Air Act Prevention of Significant
Deterioration Permit Issued to
Palmdale Energy LLC for the Palmdale
Energy Project
Environmental Protection
Agency.
ACTION: Notice of final action.
amozie on DSK3GDR082PROD with NOTICES1
AGENCY:
This notice announces that
the Environmental Protection Agency,
Region IX (EPA Region IX) issued a final
permit decision to Palmdale Energy,
LLC for a Clean Air Act Prevention of
Significant Deterioration (PSD) permit
for the construction of the Palmdale
Energy Project (PEP).
SUMMARY:
VerDate Sep<11>2014
17:51 Dec 10, 2018
Jkt 247001
The final PSD permit decision
for the PEP was issued and became
effective on October 25, 2018. Pursuant
to section 307(b)(1) of the Clean Air Act,
judicial review of this final permit
decision, to the extent it is available,
may be sought by filing a petition for
review in the United States Court of
Appeals for the Ninth Circuit within 60
days of December 11, 2018.
ADDRESSES: The EPA established a
docket for this action under Docket ID
No. EPA–R09–OAR–2017–0473. All
documents in the docket are listed on
the https://www.regulations.gov
website. Although listed in the docket
index, some information is not publicly
available, e.g., Confidential Business
Information (CBI) or other information
the disclosure of which is restricted by
statute. Certain other material, such as
copyrighted material, is not placed on
the internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available through https://
www.regulations.gov. Please contact the
person identified in the FOR FURTHER
INFORMATION CONTACT section for
additional information about accessing
docket materials for this action.
FOR FURTHER INFORMATION CONTACT: Lisa
Beckham, Permits Office (Air-3), U.S.
Environmental Protection Agency,
Region IX, (415) 972–3811,
beckham.lisa@epa.gov. Anyone who
wishes to review the EPA’s
Environmental Appeals Board (EAB)
decision described below or documents
in the EAB’s electronic docket for its
decision can obtain them at https://
www.epa.gov/eab/. The final PSD
permit is available in the electronic
docket for this action at https://
www.regulations.gov (Docket ID: EPA–
R09–OAR–2017–0473).
SUPPLEMENTARY INFORMATION:
DATES:
Notice of Final Action
On April 25, 2018, EPA Region IX
initially issued PSD Permit No. SE 17–
01 to Palmdale Energy, LLC under 40
CFR 124.15, authorizing the
construction and operation of the PEP.
By its own terms, and consistent with
40 CFR 124.15(b), the effective date of
the permit was delayed as the result of
the filing of a petition for review of the
Region’s permit decision with the EAB.
On October 23, 2018, the EAB denied
review of the permit decision. See In re
Palmdale Energy LLC, PSD Appeal No.
18–01 (EAB Oct. 23, 2018), 17 E.A.D.
ll (Order Denying Review). Following
the EAB’s action, pursuant to 40 CFR
124.19(l)(2), EPA Region IX issued a
final permit decision on October 25,
2018. All conditions of the PEP PSD
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
permit, as initially issued by EPA
Region IX on April 25, 2018, were final
and effective as of October 25, 2018.
Dated: November 13, 2018.
Elizabeth J. Adams,
Division Director, Region IX.
[FR Doc. 2018–26687 Filed 12–10–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0066; FRL–9986–
51–OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Ferroalloys Production:
Ferromanganese and Silicomanganese
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for Ferroalloys Production:
Ferromanganese and Silicomanganese
(EPA ICR No. 1831.07, OMB Control No.
2060–0391), to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. This is a
proposed extension of the ICR, which is
currently approved through December
31, 2018. Public comments were
previously requested, via the Federal
Register, on June 29, 2017 during a 60day comment period. This notice allows
for an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An agency may neither conduct nor
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number.
DATES: Additional comments may be
submitted on or before January 10, 2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0066, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
SUMMARY:
E:\FR\FM\11DEN1.SGM
11DEN1
Agencies
[Federal Register Volume 83, Number 237 (Tuesday, December 11, 2018)]
[Notices]
[Page 63638]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26687]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-R09-OAR-2017-0473; FRL-9987-65-Region 9]
Clean Air Act Prevention of Significant Deterioration Permit
Issued to Palmdale Energy LLC for the Palmdale Energy Project
AGENCY: Environmental Protection Agency.
ACTION: Notice of final action.
-----------------------------------------------------------------------
SUMMARY: This notice announces that the Environmental Protection
Agency, Region IX (EPA Region IX) issued a final permit decision to
Palmdale Energy, LLC for a Clean Air Act Prevention of Significant
Deterioration (PSD) permit for the construction of the Palmdale Energy
Project (PEP).
DATES: The final PSD permit decision for the PEP was issued and became
effective on October 25, 2018. Pursuant to section 307(b)(1) of the
Clean Air Act, judicial review of this final permit decision, to the
extent it is available, may be sought by filing a petition for review
in the United States Court of Appeals for the Ninth Circuit within 60
days of December 11, 2018.
ADDRESSES: The EPA established a docket for this action under Docket ID
No. EPA-R09-OAR-2017-0473. All documents in the docket are listed on
the https://www.regulations.gov website. Although listed in the docket
index, some information is not publicly available, e.g., Confidential
Business Information (CBI) or other information the disclosure of which
is restricted by statute. Certain other material, such as copyrighted
material, is not placed on the internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available through https://www.regulations.gov. Please contact the person
identified in the FOR FURTHER INFORMATION CONTACT section for
additional information about accessing docket materials for this
action.
FOR FURTHER INFORMATION CONTACT: Lisa Beckham, Permits Office (Air-3),
U.S. Environmental Protection Agency, Region IX, (415) 972-3811,
[email protected]. Anyone who wishes to review the EPA's
Environmental Appeals Board (EAB) decision described below or documents
in the EAB's electronic docket for its decision can obtain them at
https://www.epa.gov/eab/. The final PSD permit is available in the
electronic docket for this action at https://www.regulations.gov (Docket
ID: EPA-R09-OAR-2017-0473).
SUPPLEMENTARY INFORMATION:
Notice of Final Action
On April 25, 2018, EPA Region IX initially issued PSD Permit No. SE
17-01 to Palmdale Energy, LLC under 40 CFR 124.15, authorizing the
construction and operation of the PEP. By its own terms, and consistent
with 40 CFR 124.15(b), the effective date of the permit was delayed as
the result of the filing of a petition for review of the Region's
permit decision with the EAB.
On October 23, 2018, the EAB denied review of the permit decision.
See In re Palmdale Energy LLC, PSD Appeal No. 18-01 (EAB Oct. 23,
2018), 17 E.A.D. __ (Order Denying Review). Following the EAB's action,
pursuant to 40 CFR 124.19(l)(2), EPA Region IX issued a final permit
decision on October 25, 2018. All conditions of the PEP PSD permit, as
initially issued by EPA Region IX on April 25, 2018, were final and
effective as of October 25, 2018.
Dated: November 13, 2018.
Elizabeth J. Adams,
Division Director, Region IX.
[FR Doc. 2018-26687 Filed 12-10-18; 8:45 am]
BILLING CODE 6560-50-P