Texas Eastern Transmission, LP; Notice of Schedule for Environmental Review of the Line 1-N Abandonment Project, 63492 [2018-26663]
Download as PDF
63492
Federal Register / Vol. 83, No. 236 / Monday, December 10, 2018 / Notices
Accession Number: 20181130–5307.
Comments Due: 5 p.m. ET 12/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26642 Filed 12–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–533–000]
Texas Eastern Transmission, LP;
Notice of Schedule for Environmental
Review of the Line 1–N Abandonment
Project
On July 24, 2018, Texas Eastern
Transmission, LP filed an application in
Docket No. CP18–533–000 requesting to
discontinue natural gas service and
abandon natural gas pipelines and
aboveground facilities pursuant to
section 7(b) of the Natural Gas Act and
Part 157 of the Commission’s
regulations. The proposed project is
known as the Line 1–N Abandonment
Project (Project), and would abandon a
portion of the Line 1–N lateral and
related facilities in Harrison and Marion
Counties, Texas.
On August 7, 2018, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
VerDate Sep<11>2014
17:10 Dec 07, 2018
Jkt 247001
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA January 25, 2019
90-Day Federal Authorization Decision
Deadline April 25, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Texas Eastern proposes to abandon a
portion of its Line 1–N lateral and
related facilities in Harrison and Marion
Counties, Texas. Specifically, Texas
Eastern is requesting approval to
abandon in place and by removal a total
of approximately 30 miles of 8-inch, 10inch, and 12-inch-diameter lateral
pipeline; abandon by removal all of the
facilities at Metering and Regulating
Station 70191; and abandon by removal
all aboveground appurtenances on each
of the 8-inch, 10-inch and 12-inchdiameter pipeline segments.
Background
On September 6, 2018, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Line 1–N
Abandonment Project and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. In response to the NOI, the
Commission received comments from
two landowners, and a landowner’s
legal representative. The primary issues
raised by the commentors are concerns
regarding exposed and damaged
pipeline, pipeline contamination, and
impacts of abandoning the pipeline in
place. All substantive comments will be
addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP18–533), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: November 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–26663 Filed 12–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–426–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization; LUZ Solar Partners VIII,
Ltd.
This is a supplemental notice in the
above-referenced proceeding of LUZ
Solar Partners VIII, Ltd.’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 24,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
E:\FR\FM\10DEN1.SGM
10DEN1
Agencies
[Federal Register Volume 83, Number 236 (Monday, December 10, 2018)]
[Notices]
[Page 63492]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26663]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-533-000]
Texas Eastern Transmission, LP; Notice of Schedule for
Environmental Review of the Line 1-N Abandonment Project
On July 24, 2018, Texas Eastern Transmission, LP filed an
application in Docket No. CP18-533-000 requesting to discontinue
natural gas service and abandon natural gas pipelines and aboveground
facilities pursuant to section 7(b) of the Natural Gas Act and Part 157
of the Commission's regulations. The proposed project is known as the
Line 1-N Abandonment Project (Project), and would abandon a portion of
the Line 1-N lateral and related facilities in Harrison and Marion
Counties, Texas.
On August 7, 2018, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA January 25, 2019
90-Day Federal Authorization Decision Deadline April 25, 2019
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Texas Eastern proposes to abandon a portion of its Line 1-N lateral
and related facilities in Harrison and Marion Counties, Texas.
Specifically, Texas Eastern is requesting approval to abandon in place
and by removal a total of approximately 30 miles of 8-inch, 10-inch,
and 12-inch-diameter lateral pipeline; abandon by removal all of the
facilities at Metering and Regulating Station 70191; and abandon by
removal all aboveground appurtenances on each of the 8-inch, 10-inch
and 12-inch-diameter pipeline segments.
Background
On September 6, 2018, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Line 1-N
Abandonment Project and Request for Comments on Environmental Issues
(NOI). The NOI was sent to affected landowners; federal, state, and
local government agencies; elected officials; Native American tribes;
other interested parties; and local libraries and newspapers. In
response to the NOI, the Commission received comments from two
landowners, and a landowner's legal representative. The primary issues
raised by the commentors are concerns regarding exposed and damaged
pipeline, pipeline contamination, and impacts of abandoning the
pipeline in place. All substantive comments will be addressed in the
EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP18-533), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: November 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-26663 Filed 12-7-18; 8:45 am]