Igiugig Village Council; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions, and Waiving the Timing Requirement for Filing Competing Development Applications, 62858-62859 [2018-26457]
Download as PDF
62858
Federal Register / Vol. 83, No. 234 / Thursday, December 6, 2018 / Notices
Applicants: LUZ Solar Partners IX,
Ltd.
Description: Baseline eTariff Filing:
MBR Application to be effective 1/29/
2019.
Filed Date: 11/29/18.
Accession Number: 20181129–5145.
Comments Due: 5 p.m. ET 12/20/18.
Docket Numbers: ER19–428–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Revised and Restated Minden PSA to be
effective 1/1/2018.
Filed Date: 11/29/18.
Accession Number: 20181129–5148.
Comments Due: 5 p.m. ET 12/20/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26489 Filed 12–4–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSK30JT082PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–318–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: SCRM
Filing Nov 2018 to be effective 1/1/
2019.
Filed Date: 11/28/18.
Accession Number: 20181128–5018.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: RP19–319–000.
VerDate Sep<11>2014
20:35 Dec 04, 2018
Jkt 247001
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Compliance filing
Cameron Interstate Pipeline Annual
Adjustment of Fuel Retainage
Percentage to be effective 1/1/2019.
Filed Date: 11/28/18.
Accession Number: 20181128–5080.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: RP19–320–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Boston Gas 510807
release to SFE Energy 798234 to be
effective 12/1/2018.
Filed Date: 11/28/18.
Accession Number: 20181128–5081.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: RP19–321–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Boston Gas 510798
releases eff 12–1–18 to be effective 12/
1/2018.
Filed Date: 11/28/18.
Accession Number: 20181128–5098.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: RP19–322–000.
Applicants: Southeast Supply Header,
LLC.
Description: § 4(d) Rate Filing:
Termination of Contract 840005 to be
effective 1/1/2019.
Filed Date: 11/28/18.
Accession Number: 20181128–5112.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: RP19–323–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Negotiated Rate Agreement
Update (SoCal Redes Dec18) to be
effective 12/1/2018.
Filed Date: 11/28/18.
Accession Number: 20181128–5124.
Comments Due: 5 p.m. ET 12/10/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26488 Filed 12–4–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13511–003]
Igiugig Village Council; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Fishway
Prescriptions, and Waiving the Timing
Requirement for Filing Competing
Development Applications
November 29, 2018.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
License for a Hydrokinetic Pilot Project.
b. Project No.: 13511–003.
c. Date filed: November 15, 2018.
d. Applicant: Igiugig Village Council.
e. Name of Project: Igiugig
Hydrokinetic Project.
f. Location: On the Kvichak River in
the Lake and Peninsula Borough, near
the town of Igiugig, Alaska.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nathan
Johnson, Ocean Renewable Power
Company, 254 Commercial Street, Suite
119B, Portland, Maine 04101; (207)
772–7707.
i. FERC Contact: Ryan Hansen,
telephone (202) 502–8074, and email
ryan.hansen@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 30 days
from the issuance date of this notice;
reply comments are due 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, terms and
conditions, and fishway prescriptions
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
E:\FR\FM\06DEN1.SGM
06DEN1
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 234 / Thursday, December 6, 2018 / Notices
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–13511–003.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The proposed Igiugig Hydrokinetic
Project would consist of: (1) An instream 35-kilowatt (kW), 52-foot-long,
12-foot-high, 47-foot-wide pontoonmounted RivGen Power System Turbine
Generator Unit (TGU) in Phase 1; (2) an
additional in-stream 35-kW pontoonmounted TGU in Phase 2; (3) two
anchoring systems each consisting of a
6,600-pound anchor, chain, shackles,
and 200 feet of mooring; (4) a 375-footlong, coated and weighted combined
power, data, and environmental
monitoring cable from the TGU for
Phase 1; and a 675-foot-long cable from
the TGU for Phase 2; (5) an existing 10foot-long by 8-foot-wide shore station
for housing project electronics and
controls; and (6) appurtenant facilities.
The project is estimated to have an
annual generation of 404,000 megawatthours per year.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
20:35 Dec 04, 2018
Jkt 247001
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or ’’ FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and conditions, and preliminary
fishway prescriptions.
Filing of response comments
December 31,
2018.
Commission issues EA .........
Comments on EA or EIS ......
PO 00000
Frm 00027
Fmt 4703
January 29,
2019.
February 27,
2019.
March 29,
2019.
Sfmt 4703
62859
p. Waiver of deadline to file
competing applications filed pursuant
to a notice of intent (NOI):
Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application or
an NOI to file such an application.
Section 4.36(b)(2) of the Commission’s
regulations, which allows 120 days from
the specified intervention deadline date
for interested parties to file competing
development applications in which
timely NOIs have been submitted, is
hereby waived. Due to the expedited
nature of the pilot project licensing
procedures, the submission of a timely
NOI will instead allow an interested
person to file the competing
development application no later than
30 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
An NOI must specify the exact name,
business address, and telephone number
of the prospective applicant, and must
include an unequivocal statement of
intent to submit a development
application. An NOI must be served on
the applicant named in this public
notice.
Dated: November 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–26457 Filed 12–4–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6951–018]
Tallassee Shoals, LLC; Notice
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice Approving
the Use of the Traditional Licensing
Process.
b. Project No.: 6951–018.
c. Date Filed: September 28, 2018.
d. Submitted By: Tallassee Shoals,
LLC.
e. Name of Project: Tallassee Shoals
Project.
f. Location: On the Middle Oconee
River near the city of Athens, in Clarke,
and Jackson Counties, Georgia. The
project does not occupy federal lands.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Applicant Contact: Mr. Walt
Puryear, Tallassee Shoals, LLC, 2399
Tallassee Road, Athens, GA 30607, (706)
540–7621.
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 83, Number 234 (Thursday, December 6, 2018)]
[Notices]
[Pages 62858-62859]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26457]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13511-003]
Igiugig Village Council; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Fishway Prescriptions, and Waiving the Timing
Requirement for Filing Competing Development Applications
November 29, 2018.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original License for a Hydrokinetic Pilot
Project.
b. Project No.: 13511-003.
c. Date filed: November 15, 2018.
d. Applicant: Igiugig Village Council.
e. Name of Project: Igiugig Hydrokinetic Project.
f. Location: On the Kvichak River in the Lake and Peninsula
Borough, near the town of Igiugig, Alaska.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Nathan Johnson, Ocean Renewable Power
Company, 254 Commercial Street, Suite 119B, Portland, Maine 04101;
(207) 772-7707.
i. FERC Contact: Ryan Hansen, telephone (202) 502-8074, and email
[email protected].
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and prescriptions: 30 days from
the issuance date of this notice; reply comments are due 60 days from
the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, terms and
conditions, and fishway prescriptions using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the
[[Page 62859]]
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-13511-003.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The proposed Igiugig Hydrokinetic Project would consist of: (1)
An in-stream 35-kilowatt (kW), 52-foot-long, 12-foot-high, 47-foot-wide
pontoon-mounted RivGen Power System Turbine Generator Unit (TGU) in
Phase 1; (2) an additional in-stream 35-kW pontoon-mounted TGU in Phase
2; (3) two anchoring systems each consisting of a 6,600-pound anchor,
chain, shackles, and 200 feet of mooring; (4) a 375-foot-long, coated
and weighted combined power, data, and environmental monitoring cable
from the TGU for Phase 1; and a 675-foot-long cable from the TGU for
Phase 2; (5) an existing 10-foot-long by 8-foot-wide shore station for
housing project electronics and controls; and (6) appurtenant
facilities. The project is estimated to have an annual generation of
404,000 megawatt-hours per year.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or '' FISHWAY
PRESCRIPTIONS;'' (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. A copy of any protest or motion to intervene must
be served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary December 31, 2018.
terms and conditions, and preliminary
fishway prescriptions.
Filing of response comments............... January 29, 2019.
Commission issues EA...................... February 27, 2019.
Comments on EA or EIS..................... March 29, 2019.
------------------------------------------------------------------------
p. Waiver of deadline to file competing applications filed pursuant
to a notice of intent (NOI):
Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application or an NOI to file
such an application. Section 4.36(b)(2) of the Commission's
regulations, which allows 120 days from the specified intervention
deadline date for interested parties to file competing development
applications in which timely NOIs have been submitted, is hereby
waived. Due to the expedited nature of the pilot project licensing
procedures, the submission of a timely NOI will instead allow an
interested person to file the competing development application no
later than 30 days after the specified intervention deadline date.
Applications for preliminary permits will not be accepted in response
to this notice.
An NOI must specify the exact name, business address, and telephone
number of the prospective applicant, and must include an unequivocal
statement of intent to submit a development application. An NOI must be
served on the applicant named in this public notice.
Dated: November 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-26457 Filed 12-4-18; 8:45 am]
BILLING CODE 6717-01-P