Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process: Alice Falls Hydro, LLC, 62313 [2018-26200]
Download as PDF
Federal Register / Vol. 83, No. 232 / Monday, December 3, 2018 / Notices
federally defined disability categories,
and adequate number of students
without disabilities, including both
students with a Section 504 plan and
students with neither an IEP nor a
Section 504 plan. To meet the study’s
objective, data will be collected from the
following sources: (1) School district
administrative records, including
transcripts, from districts participating
in NLTS 2012; (2) postsecondary
enrollment information through the
National Student Clearinghouse, (3)
student financial aid data from ED’s
Federal Student Aid Office (FSA), (4)
employment and earnings data from the
Social Security Administration (SSA);
and (5) information about vocational
rehabilitative services and supports
youth received from ED’s Rehabilitative
Services Administration (RSA). Data
collection activities expected to result in
public burden are the collection of
administrative data from school districts
and requests for consent from sample
members and their parents.
Dated: November 28, 2018.
Stephanie Valentine,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2018–26197 Filed 11–30–18; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5867–053]
khammond on DSK30JT082PROD with NOTICES
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process: Alice
Falls Hydro, LLC
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 5867–053.
c. Date Filed: September 28, 2018.
d. Submitted By: Alice Falls Hydro,
LLC.
e. Name of Project: Alice Falls
Hydroelectric Project.
f. Location: On the Ausable River, in
Clinton and Essex Counties, New York.
The project does not occupy federal
lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: Michael
Scarzello, Eagle Creek Renewable
Energy, LLC, 116 N State Street,
Neshkoro, WI 54960–0167; (973) 998–
8400; email—michael.scarzello@
eaglecreekre.com.
VerDate Sep<11>2014
16:52 Nov 30, 2018
Jkt 247001
i. FERC Contact: Monir Chowdhury at
(202) 502–6736; or email at
monir.chowdhury@ferc.gov.
j. Alice Falls Hydro, LLC (Alice Falls
Hydro) filed its request to use the
Traditional Licensing Process on
September 28, 2018. Alice Falls Hydro
provided public notice of its request on
September 22, 2018. In a letter dated
November 27, 2018, the Director of the
Division of Hydropower Licensing
approved Alice Falls Hydro’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery and Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Alice Falls Hydro as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. Alice Falls Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
Keeseville Free Library, 1721 Front
Street, Keeseville, NY 12944.
o. Alice Falls Hydro states its
unequivocal intent to submit an
application for a new license for Project
No. 5867. Pursuant to 18 CFR 16.8, 16.9,
and 16.10 each application for a new
license and any competing license
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
62313
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by September 30,
2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: November 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–26200 Filed 11–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–396–000]
AES Shady Point, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of AES
Shady Point, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 17,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
E:\FR\FM\03DEN1.SGM
03DEN1
Agencies
[Federal Register Volume 83, Number 232 (Monday, December 3, 2018)]
[Notices]
[Page 62313]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26200]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5867-053]
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process: Alice Falls Hydro, LLC
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 5867-053.
c. Date Filed: September 28, 2018.
d. Submitted By: Alice Falls Hydro, LLC.
e. Name of Project: Alice Falls Hydroelectric Project.
f. Location: On the Ausable River, in Clinton and Essex Counties,
New York. The project does not occupy federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contact: Michael Scarzello, Eagle Creek Renewable
Energy, LLC, 116 N State Street, Neshkoro, WI 54960-0167; (973) 998-
8400; [email protected]
i. FERC Contact: Monir Chowdhury at (202) 502-6736; or email at
[email protected].
j. Alice Falls Hydro, LLC (Alice Falls Hydro) filed its request to
use the Traditional Licensing Process on September 28, 2018. Alice
Falls Hydro provided public notice of its request on September 22,
2018. In a letter dated November 27, 2018, the Director of the Division
of Hydropower Licensing approved Alice Falls Hydro's request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery and Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New York State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Alice Falls Hydro as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. Alice Falls Hydro filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the Keeseville Free Library, 1721 Front Street, Keeseville, NY 12944.
o. Alice Falls Hydro states its unequivocal intent to submit an
application for a new license for Project No. 5867. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by September
30, 2021.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: November 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-26200 Filed 11-30-18; 8:45 am]
BILLING CODE 6717-01-P