Midship Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for a Proposed Amendment of the Midcontinent Supply Header Interstate Pipeline Project and Request for Comments on Environmental Issues, 61626-61628 [2018-26005]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
61626
Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.2 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.3
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
2 Tennessee
Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
3 18 CFR 385.214(d)(1).
VerDate Sep<11>2014
17:00 Nov 29, 2018
Jkt 247001
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on December 14, 2018.
Dated: November 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25985 Filed 11–29–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–17–000]
Midship Pipeline Company, LLC;
Notice of Intent To Prepare an
Environmental Assessment for a
Proposed Amendment of the
Midcontinent Supply Header Interstate
Pipeline Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of a
proposed amendment (0.8-mile reroute)
of Midship Pipeline Company, LLC’s
(Midship Pipeline) Midcontinent
Supply Header Interstate Pipeline
Project (MIDSHIP Project) in Bryan
County, Oklahoma.1 The Commission
will use this EA in its decision-making
process to determine whether the
amendment is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the amendment/reroute. The
National Environmental Policy Act
(NEPA) requires the Commission to take
into account the environmental impacts
that could result from its action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires the
Commission to discover concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
1 On August 13, 2018, the Commission issued a
Certificate of Public Convenience and Necessity for
the 234.1-mile-long MIDSHIP Project under Docket
No. CP17–458–000.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Washington, DC on or before 5:00 p.m.
Eastern Time on December 24, 2018.
You can make a difference by
submitting your specific comments or
concerns about the reroute. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on November 14, 2018, you
will need to file those comments in
Docket No. CP19–17–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this amendment. State
and local government representatives
should notify their constituents of this
proposed amendment and encourage
them to comment on their areas of
concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the amendment, that approval conveys
with it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Midship Pipeline provided
landowners with a fact sheet prepared
by FERC entitled ‘‘An Interstate Natural
Gas Facility On My Land? What Do I
Need To Know?’’ This fact sheet
addresses a number of typically asked
questions, including the use of eminent
domain and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC
website (www.ferc.gov) at https://
www.ferc.gov/resources/guides/gas/
gas.pdf.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
E:\FR\FM\30NON1.SGM
30NON1
Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; a
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP19–17–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
Midship Pipeline proposes a 0.8-mile
reroute between mileposts 195.2 to
195.9 of the MIDSHIP Project in Bryan
County, Oklahoma. This reroute would
shift the pipeline about 400 feet west
and south of the certificated pipeline
route. The general location of the
reroute is shown in appendix 1.2
amozie on DSK3GDR082PROD with NOTICES1
Land Requirements for Construction
Construction of the proposed reroute
would disturb about 12.5 acres of land.
Following construction, Midship
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
VerDate Sep<11>2014
17:00 Nov 29, 2018
Jkt 247001
Pipeline would maintain about 5.3 acres
for permanent operation of the project;
the remaining acreage would be restored
and revert to former uses. This
represents an increase from the
certificated route of about 1.2 acres
during construction and 0.5 acre during
operation.
The EA Process
The EA will discuss impacts that
could occur as a result of the proposed
amendment under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
amendment, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas as applicable.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 3 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.4 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
3 For
instructions on connecting to eLibrary, refer
to page 5 of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
61627
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office (SHPO), and to
solicit their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.5
Commission staff will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). The EA for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, and anyone who
submits comments on the project.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
amendment.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\30NON1.SGM
30NON1
61628
Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices
Additional Information
Additional information about the
amendment/reroute is available from
the Commission’s Office of External
Affairs, at (866) 208–FERC, or on the
FERC website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field, excluding the last three digits (i.e.,
CP19–17). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: November 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–26005 Filed 11–29–18; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0097 FRL–9986–26–
OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Plating and Polishing Area Sources
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for Plating and Polishing Area
Sources (EPA ICR Number 2294.05,
OMB Control Number 2060–0623), to
the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through November 30, 2018.
Public comments were previously
requested, via the Federal Register, on
June 29, 2017 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
amozie on DSK3GDR082PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:00 Nov 29, 2018
Additional comments may be
submitted on or before December 31,
2018.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0097 to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The National Emission
Standards for Hazardous Air Pollutants
(NESHAP) for Plating and Polishing
Area Sources (40 CFR part 63, subpart
WWWWWW) apply to both existing and
new plating and polishing facilities that
are an area source of hazardous air
pollutant (HAP) emissions and that use
one or more of the following metal HAP:
Cadmium, chromium, lead manganese,
or nickel (hereafter referred to as the
plating and polishing metal HAP). A
plating and polishing facility is a plant
site that is engaged in any of the
following processes: Non-chromium
electroplating; electroless or nonelectrolytic plating; other nonelectrolytic metal coating processes
such as chromate conversion coating,
nickel acetate sealing, sodium
DATES:
Jkt 247001
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
dichromate sealing, and manganese
phosphate coating, and thermal
spraying; dry mechanical polishing of
finished metals and formed products
after plating or thermal spraying;
electroforming; and electro-polishing.
New facilities include those that
commenced construction, modification,
or reconstruction after the date of
proposal. In general, all NESHAP
standards require initial notifications,
performance tests, and periodic reports
by the owners/operators of the affected
facilities. They are also required to
maintain records of the occurrence and
duration of any startup, shutdown, or
malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. These notifications, reports,
and records are essential in determining
compliance with 40 CFR part 63,
subpart WWWWWW.
Form Numbers: None.
Respondents/affected entities: Plating
and polishing area source facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
WWWWWW).
Estimated number of respondents:
2,900 (total).
Frequency of response: Initially and
annually.
Total estimated burden: 67,700 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $7,410,000 (per
year), which includes no annualized
capital/startup or operation &
maintenance costs.
Changes in the estimates: There is an
increase in the total estimated burden
and number of responses from the mostrecently approved ICR due to several
adjustments. First, burden hours were
added to allow each facility to
refamiliarize themselves with the
regulatory requirements each year.
Second, the number of sources that
complete but do not submit annual
compliance certifications was left out of
the response count in the previous
renewal and this has been corrected.
There is a decrease in the annualized
capital or operation & maintenance costs
since the previous renewal due to an
adjustment. There are no ongoing
monitoring requirements in the rule and
no new sources are expected to incur
capital/startup costs. Therefore, the
capital/startup costs were reduced to
zero since those costs have already been
incurred when the existing sources
became subject to the rule.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018–25771 Filed 11–29–18; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Pages 61626-61628]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26005]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-17-000]
Midship Pipeline Company, LLC; Notice of Intent To Prepare an
Environmental Assessment for a Proposed Amendment of the Midcontinent
Supply Header Interstate Pipeline Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of a proposed amendment (0.8-mile
reroute) of Midship Pipeline Company, LLC's (Midship Pipeline)
Midcontinent Supply Header Interstate Pipeline Project (MIDSHIP
Project) in Bryan County, Oklahoma.\1\ The Commission will use this EA
in its decision-making process to determine whether the amendment is in
the public convenience and necessity.
---------------------------------------------------------------------------
\1\ On August 13, 2018, the Commission issued a Certificate of
Public Convenience and Necessity for the 234.1-mile-long MIDSHIP
Project under Docket No. CP17-458-000.
---------------------------------------------------------------------------
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the amendment/reroute. The National
Environmental Policy Act (NEPA) requires the Commission to take into
account the environmental impacts that could result from its action
whenever it considers the issuance of a Certificate of Public
Convenience and Necessity. NEPA also requires the Commission to
discover concerns the public may have about proposals. This process is
referred to as ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this notice, the Commission requests public comments on the scope of
the issues to address in the EA. To ensure that your comments are
timely and properly recorded, please submit your comments so that the
Commission receives them in Washington, DC on or before 5:00 p.m.
Eastern Time on December 24, 2018.
You can make a difference by submitting your specific comments or
concerns about the reroute. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on November 14, 2018, you will need to file
those comments in Docket No. CP19-17-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this amendment. State and local government
representatives should notify their constituents of this proposed
amendment and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the amendment, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Midship Pipeline provided landowners with a fact sheet prepared by
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest
[[Page 61627]]
way to receive notification and provide a link to the document files
which can reduce the amount of time you spend researching proceedings.
To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP19-17-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
Midship Pipeline proposes a 0.8-mile reroute between mileposts
195.2 to 195.9 of the MIDSHIP Project in Bryan County, Oklahoma. This
reroute would shift the pipeline about 400 feet west and south of the
certificated pipeline route. The general location of the reroute is
shown in appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed reroute would disturb about 12.5 acres
of land. Following construction, Midship Pipeline would maintain about
5.3 acres for permanent operation of the project; the remaining acreage
would be restored and revert to former uses. This represents an
increase from the certificated route of about 1.2 acres during
construction and 0.5 acre during operation.
The EA Process
The EA will discuss impacts that could occur as a result of the
proposed amendment under these general headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed amendment, and make recommendations on how to lessen or avoid
impacts on the various resource areas as applicable.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \3\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to page 5
of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office
(SHPO), and to solicit their views and those of other government
agencies, interested Indian tribes, and the public on the project's
potential effects on historic properties.\5\ Commission staff will
define the project-specific Area of Potential Effects (APE) in
consultation with the SHPO as the project develops. On natural gas
facility projects, the APE at a minimum encompasses all areas subject
to ground disturbance (examples include construction right-of-way,
contractor/pipe storage yards, compressor stations, and access roads).
The EA for this project will document findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed amendment.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
[[Page 61628]]
Additional Information
Additional information about the amendment/reroute is available
from the Commission's Office of External Affairs, at (866) 208-FERC, or
on the FERC website at www.ferc.gov using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number in the ``Docket Number'' field, excluding the last three digits
(i.e., CP19-17). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Dated: November 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-26005 Filed 11-29-18; 8:45 am]
BILLING CODE 6717-01-P