Midship Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for a Proposed Amendment of the Midcontinent Supply Header Interstate Pipeline Project and Request for Comments on Environmental Issues, 61626-61628 [2018-26005]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 61626 Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.2 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-oftime, the movant is required to ‘‘show good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.3 The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy 2 Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018). 3 18 CFR 385.214(d)(1). VerDate Sep<11>2014 17:00 Nov 29, 2018 Jkt 247001 Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on December 14, 2018. Dated: November 23, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–25985 Filed 11–29–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–17–000] Midship Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for a Proposed Amendment of the Midcontinent Supply Header Interstate Pipeline Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of a proposed amendment (0.8-mile reroute) of Midship Pipeline Company, LLC’s (Midship Pipeline) Midcontinent Supply Header Interstate Pipeline Project (MIDSHIP Project) in Bryan County, Oklahoma.1 The Commission will use this EA in its decision-making process to determine whether the amendment is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the amendment/reroute. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in 1 On August 13, 2018, the Commission issued a Certificate of Public Convenience and Necessity for the 234.1-mile-long MIDSHIP Project under Docket No. CP17–458–000. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Washington, DC on or before 5:00 p.m. Eastern Time on December 24, 2018. You can make a difference by submitting your specific comments or concerns about the reroute. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider all filed comments during the preparation of the EA. If you sent comments on this project to the Commission before the opening of this docket on November 14, 2018, you will need to file those comments in Docket No. CP19–17–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this amendment. State and local government representatives should notify their constituents of this proposed amendment and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the amendment, that approval conveys with it the right of eminent domain. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. Midship Pipeline provided landowners with a fact sheet prepared by FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC website (www.ferc.gov) at https:// www.ferc.gov/resources/guides/gas/ gas.pdf. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest E:\FR\FM\30NON1.SGM 30NON1 Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/ esubscription.asp. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP19–17– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Summary of the Proposed Project Midship Pipeline proposes a 0.8-mile reroute between mileposts 195.2 to 195.9 of the MIDSHIP Project in Bryan County, Oklahoma. This reroute would shift the pipeline about 400 feet west and south of the certificated pipeline route. The general location of the reroute is shown in appendix 1.2 amozie on DSK3GDR082PROD with NOTICES1 Land Requirements for Construction Construction of the proposed reroute would disturb about 12.5 acres of land. Following construction, Midship 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. VerDate Sep<11>2014 17:00 Nov 29, 2018 Jkt 247001 Pipeline would maintain about 5.3 acres for permanent operation of the project; the remaining acreage would be restored and revert to former uses. This represents an increase from the certificated route of about 1.2 acres during construction and 0.5 acre during operation. The EA Process The EA will discuss impacts that could occur as a result of the proposed amendment under these general headings: • Geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • air quality and noise; • public safety; and • cumulative impacts. Commission staff will also evaluate reasonable alternatives to the proposed amendment, and make recommendations on how to lessen or avoid impacts on the various resource areas as applicable. The EA will present Commission staffs’ independent analysis of the issues. The EA will be available in electronic format in the public record through eLibrary 3 and the Commission’s website (https:// www.ferc.gov/industries/gas/enviro/ eis.asp). If eSubscribed, you will receive instant email notification when the EA is issued. The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. To ensure Commission staff have the opportunity to address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the EA.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s 3 For instructions on connecting to eLibrary, refer to page 5 of this notice. 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 61627 implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 Commission staff will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ pipe storage yards, compressor stations, and access roads). The EA for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, and anyone who submits comments on the project. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed amendment. If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the electronic document on the FERC’s website (www.ferc.gov). If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please return the attached ‘‘Mailing List Update Form’’ (appendix 2). 5 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\30NON1.SGM 30NON1 61628 Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices Additional Information Additional information about the amendment/reroute is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP19–17). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Dated: November 23, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–26005 Filed 11–29–18; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2014–0097 FRL–9986–26– OEI] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Plating and Polishing Area Sources (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Plating and Polishing Area Sources (EPA ICR Number 2294.05, OMB Control Number 2060–0623), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. amozie on DSK3GDR082PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 17:00 Nov 29, 2018 Additional comments may be submitted on or before December 31, 2018. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2014–0097 to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https:// www.epa.gov/dockets. Abstract: The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Plating and Polishing Area Sources (40 CFR part 63, subpart WWWWWW) apply to both existing and new plating and polishing facilities that are an area source of hazardous air pollutant (HAP) emissions and that use one or more of the following metal HAP: Cadmium, chromium, lead manganese, or nickel (hereafter referred to as the plating and polishing metal HAP). A plating and polishing facility is a plant site that is engaged in any of the following processes: Non-chromium electroplating; electroless or nonelectrolytic plating; other nonelectrolytic metal coating processes such as chromate conversion coating, nickel acetate sealing, sodium DATES: Jkt 247001 PO 00000 Frm 00030 Fmt 4703 Sfmt 9990 dichromate sealing, and manganese phosphate coating, and thermal spraying; dry mechanical polishing of finished metals and formed products after plating or thermal spraying; electroforming; and electro-polishing. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR part 63, subpart WWWWWW. Form Numbers: None. Respondents/affected entities: Plating and polishing area source facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart WWWWWW). Estimated number of respondents: 2,900 (total). Frequency of response: Initially and annually. Total estimated burden: 67,700 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $7,410,000 (per year), which includes no annualized capital/startup or operation & maintenance costs. Changes in the estimates: There is an increase in the total estimated burden and number of responses from the mostrecently approved ICR due to several adjustments. First, burden hours were added to allow each facility to refamiliarize themselves with the regulatory requirements each year. Second, the number of sources that complete but do not submit annual compliance certifications was left out of the response count in the previous renewal and this has been corrected. There is a decrease in the annualized capital or operation & maintenance costs since the previous renewal due to an adjustment. There are no ongoing monitoring requirements in the rule and no new sources are expected to incur capital/startup costs. Therefore, the capital/startup costs were reduced to zero since those costs have already been incurred when the existing sources became subject to the rule. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2018–25771 Filed 11–29–18; 8:45 am] BILLING CODE 6560–50–P E:\FR\FM\30NON1.SGM 30NON1

Agencies

[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Pages 61626-61628]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-26005]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-17-000]


Midship Pipeline Company, LLC; Notice of Intent To Prepare an 
Environmental Assessment for a Proposed Amendment of the Midcontinent 
Supply Header Interstate Pipeline Project and Request for Comments on 
Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of a proposed amendment (0.8-mile 
reroute) of Midship Pipeline Company, LLC's (Midship Pipeline) 
Midcontinent Supply Header Interstate Pipeline Project (MIDSHIP 
Project) in Bryan County, Oklahoma.\1\ The Commission will use this EA 
in its decision-making process to determine whether the amendment is in 
the public convenience and necessity.
---------------------------------------------------------------------------

    \1\ On August 13, 2018, the Commission issued a Certificate of 
Public Convenience and Necessity for the 234.1-mile-long MIDSHIP 
Project under Docket No. CP17-458-000.
---------------------------------------------------------------------------

    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the amendment/reroute. The National 
Environmental Policy Act (NEPA) requires the Commission to take into 
account the environmental impacts that could result from its action 
whenever it considers the issuance of a Certificate of Public 
Convenience and Necessity. NEPA also requires the Commission to 
discover concerns the public may have about proposals. This process is 
referred to as ``scoping.'' The main goal of the scoping process is to 
focus the analysis in the EA on the important environmental issues. By 
this notice, the Commission requests public comments on the scope of 
the issues to address in the EA. To ensure that your comments are 
timely and properly recorded, please submit your comments so that the 
Commission receives them in Washington, DC on or before 5:00 p.m. 
Eastern Time on December 24, 2018.
    You can make a difference by submitting your specific comments or 
concerns about the reroute. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider all filed comments during the preparation of the 
EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on November 14, 2018, you will need to file 
those comments in Docket No. CP19-17-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this amendment. State and local government 
representatives should notify their constituents of this proposed 
amendment and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the amendment, that approval conveys with it the right of 
eminent domain. Therefore, if you and the company do not reach an 
easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Midship Pipeline provided landowners with a fact sheet prepared by 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.

Public Participation

    The Commission offers a free service called eSubscription which 
makes it easy to stay informed of all issuances and submittals 
regarding the dockets/projects to which you subscribe. These instant 
email notifications are the fastest

[[Page 61627]]

way to receive notification and provide a link to the document files 
which can reduce the amount of time you spend researching proceedings. 
To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. Using eComment is an easy 
method for submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP19-17-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Midship Pipeline proposes a 0.8-mile reroute between mileposts 
195.2 to 195.9 of the MIDSHIP Project in Bryan County, Oklahoma. This 
reroute would shift the pipeline about 400 feet west and south of the 
certificated pipeline route. The general location of the reroute is 
shown in appendix 1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed reroute would disturb about 12.5 acres 
of land. Following construction, Midship Pipeline would maintain about 
5.3 acres for permanent operation of the project; the remaining acreage 
would be restored and revert to former uses. This represents an 
increase from the certificated route of about 1.2 acres during 
construction and 0.5 acre during operation.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
proposed amendment under these general headings:
     Geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts.
    Commission staff will also evaluate reasonable alternatives to the 
proposed amendment, and make recommendations on how to lessen or avoid 
impacts on the various resource areas as applicable.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in electronic format in the public 
record through eLibrary \3\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will 
receive instant email notification when the EA is issued. The EA may be 
issued for an allotted public comment period. Commission staff will 
consider all comments on the EA before making recommendations to the 
Commission. To ensure Commission staff have the opportunity to address 
your comments, please carefully follow the instructions in the Public 
Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to page 5 
of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office 
(SHPO), and to solicit their views and those of other government 
agencies, interested Indian tribes, and the public on the project's 
potential effects on historic properties.\5\ Commission staff will 
define the project-specific Area of Potential Effects (APE) in 
consultation with the SHPO as the project develops. On natural gas 
facility projects, the APE at a minimum encompasses all areas subject 
to ground disturbance (examples include construction right-of-way, 
contractor/pipe storage yards, compressor stations, and access roads). 
The EA for this project will document findings on the impacts on 
historic properties and summarize the status of consultations under 
section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, and anyone who submits 
comments on the project. Commission staff will update the environmental 
mailing list as the analysis proceeds to ensure that Commission notices 
related to this environmental review are sent to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed amendment.
    If the Commission issues the EA for an allotted public comment 
period, a Notice of Availability of the EA will be sent to the 
environmental mailing list and will provide instructions to access the 
electronic document on the FERC's website (www.ferc.gov). If you need 
to make changes to your name/address, or if you would like to remove 
your name from the mailing list, please return the attached ``Mailing 
List Update Form'' (appendix 2).

[[Page 61628]]

Additional Information

    Additional information about the amendment/reroute is available 
from the Commission's Office of External Affairs, at (866) 208-FERC, or 
on the FERC website at www.ferc.gov using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number in the ``Docket Number'' field, excluding the last three digits 
(i.e., CP19-17). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.

    Dated: November 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-26005 Filed 11-29-18; 8:45 am]
 BILLING CODE 6717-01-P