Notice of Availability of the Draft Environmental Assessment (Draft EA) for Palmetto Railways Camp Hall Rail Line, 61707 [2018-25446]
Download as PDF
Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices
office of the Exchange. All comments
received will be posted without change.
Persons submitting comments are
cautioned that we do not redact or edit
personal identifying information from
comment submissions. You should
submit only information that you wish
to make available publicly. All
submissions should refer to File
Number SR–NYSEAMER–2018–51 and
should be submitted on or before
December 21, 2018.
For the Commission, by the Division of
Trading and Markets, pursuant to delegated
authority.18
Eduardo A. Aleman,
Assistant Secretary.
[FR Doc. 2018–25996 Filed 11–29–18; 8:45 am]
BILLING CODE 8011–01–P
SURFACE TRANSPORTATION BOARD
Office of Environmental Analysis
[Finance Docket 36095]
Notice of Availability of the Draft
Environmental Assessment (Draft EA)
for Palmetto Railways Camp Hall Rail
Line
Surface Transportation Board
(Board) Office of Environmental
Analysis (OEA), U.S. Army Corps of
Engineers (Corps), joint lead agencies;
U.S. Coast Guard (Coast Guard), Federal
Railroad Administration (FRA),
cooperating agencies.
ACTION: Notice of Availability of the
Draft EA on November 30, 2018 and
request for comments.
AGENCY:
On August 3, 2017, Palmetto
Railways (Applicant) filed an exemption
petition with the Board pursuant to 49
U.S.C. 10502 to construct and operate
approximately 28 miles of new rail line
between the Cross Subdivision of CSX
Transportation, Inc. (CSXT) rail network
near the Santee Cooper Cross Generating
Station and the Camp Hall Commerce
Park in Berkeley County, South
Carolina. Implementation of the
proposed rail line would bring
industrial rail service to the Volvo Cars
facility, as well as areas being developed
by Santee Cooper. FRA and the Coast
Guard are cooperating agencies in the
preparation of this Draft EA pursuant to
CEQ NEPA implementing regulations
(40 CFR 1501.6).
The purpose of this Notice of
Availability (NOA) is to notify
individuals and agencies interested in
or affected by the proposed action of the
availability of the Draft EA for review
amozie on DSK3GDR082PROD with NOTICES1
SUMMARY:
18 17
CFR 200.30–3(a)(12).
VerDate Sep<11>2014
17:00 Nov 29, 2018
Jkt 247001
and comment on November 30, 2018.
The Draft EA analyzes the potential
environmental impacts of the proposed
action and alternatives, including the
no-action alternative. The Draft EA
addresses environmental issues and
concerns identified during the scoping
process. It also contains OEA’s
preliminary recommendations for
environmental mitigation measures, and
Palmetto Railways’ voluntary mitigation
measures.
The Draft EA will be available on
November 30, 2018 through the Board’s
website at https://www.stb.gov by
following the decisions link, through
the project website at https://
www.CampHallRailNEPA.com, and at
all public libraries in Berkeley County,
South Carolina.
Next Steps: Following the close of the
30-day comment period on December
30, 2018 of the Draft EA, OEA, the
Corps, and the cooperating agencies will
issue a Final EA that considers
comments on the Draft EA. The Board
will then issue a final decision based on
the Draft and Final EAs and all public
and agency comments in the public
record for this proceeding. The final
decision will address the transportation
merits of the proposed project and the
entire environmental record. That final
decision will take one of three actions:
Approve the proposed project, deny it,
or approve it with mitigation
conditions, including environmental
conditions.
Written Comments: Any interested
party may submit written comments on
the Draft EA. The procedures for
submitting written comments are
outlined below:
ADDRESSES: Please mail written
comments on the Draft EA and the
recommended environmental mitigation
to: Ms. Diana Wood, Surface
Transportation Board, Docket No. FD
36095, c/o ICF, 9300 Lee Highway,
Fairfax, VA 22031. Electronic comments
on this Draft EA may also be submitted
electronically on the joint lead agencies’
project website (https://www.CampHall
RailNepa.com) or emailed to
CampHallRailLineNEPA@icf.com.
Please refer to Docket No. FD 36095 in
all correspondence, including
electronic, addressed to the joint lead
agencies.
The EA will be available for
public review and comment on
November 30, 2018. Mailed comments
must be postmarked by December 30,
2018. Electronic comments must be
received by December 30, 2018.
FOR FURTHER INFORMATION CONTACT:
Diana Wood, Surface Transportation
DATES:
PO 00000
Frm 00109
Fmt 4703
Sfmt 4703
61707
Board, Docket No. FD 36095, c/o ICF,
9300 Lee Highway, Fairfax, VA 22031.
Dated: November 15, 2018.
By the Board, Victoria Ruston, Director,
Office of Environmental Analysis.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2018–25446 Filed 11–29–18; 8:45 am]
BILLING CODE 4915–01–P
TENNESSEE VALLEY AUTHORITY
Meeting of the Regional Energy
Resource Council
Tennessee Valley Authority
(TVA).
ACTION: Notice of meeting.
AGENCY:
The TVA Regional Energy
Resource Council (RERC) will hold a
meeting on Tuesday, December 18,
2018, to discuss the metrics and
evaluation criteria that TVA is
establishing for the 2019 Integrated
Resource Plan (IRP). The RERC was
established to advise TVA on its energy
resource activities and the priority to be
placed among competing objectives and
values. Notice of this meeting is given
under the Federal Advisory Committee
Act (FACA).
DATES: The public meeting will be held
on Tuesday, December 18, 2018, from
9:00 a.m. to 4:00 p.m., EST.
ADDRESSES: The meeting will be held at
the Hilton Downtown Knoxville, 501
Church Street, Knoxville, Tennessee
37902, and will be open to the public.
Anyone needing special access or
accommodations should let the contact
below know at least a week in advance.
FOR FURTHER INFORMATION CONTACT: Liz
Upchurch, 865–632–8305, efupchurch@
tva.gov.
SUPPLEMENTARY INFORMATION: The
meeting agenda includes the following:
1. Introductions
2. Overview of the 2019 Integrated
Resource Plan and Supplemental
Environmental Impact Statement
Status
3. Overview of the Metrics and
Scorecard Identified for the 2019
IRP
4. Public Comments
5. Council Discussion and Advice
The RERC will hear opinions and
views of citizens by providing a public
comment session starting at 10:00 a.m.,
EST, lasting up to one hour, on
Tuesday, December 18, 2018. Persons
wishing to speak are requested to
register at the door between 9:00 a.m.
and 10:00 a.m., EST, on Tuesday,
December 18, 2018, and will be called
SUMMARY:
E:\FR\FM\30NON1.SGM
30NON1
Agencies
- Surface Transportation Board
- Office of Environmental Analysis
[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Page 61707]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25446]
=======================================================================
-----------------------------------------------------------------------
SURFACE TRANSPORTATION BOARD
Office of Environmental Analysis
[Finance Docket 36095]
Notice of Availability of the Draft Environmental Assessment
(Draft EA) for Palmetto Railways Camp Hall Rail Line
AGENCY: Surface Transportation Board (Board) Office of Environmental
Analysis (OEA), U.S. Army Corps of Engineers (Corps), joint lead
agencies; U.S. Coast Guard (Coast Guard), Federal Railroad
Administration (FRA), cooperating agencies.
ACTION: Notice of Availability of the Draft EA on November 30, 2018 and
request for comments.
-----------------------------------------------------------------------
SUMMARY: On August 3, 2017, Palmetto Railways (Applicant) filed an
exemption petition with the Board pursuant to 49 U.S.C. 10502 to
construct and operate approximately 28 miles of new rail line between
the Cross Subdivision of CSX Transportation, Inc. (CSXT) rail network
near the Santee Cooper Cross Generating Station and the Camp Hall
Commerce Park in Berkeley County, South Carolina. Implementation of the
proposed rail line would bring industrial rail service to the Volvo
Cars facility, as well as areas being developed by Santee Cooper. FRA
and the Coast Guard are cooperating agencies in the preparation of this
Draft EA pursuant to CEQ NEPA implementing regulations (40 CFR 1501.6).
The purpose of this Notice of Availability (NOA) is to notify
individuals and agencies interested in or affected by the proposed
action of the availability of the Draft EA for review and comment on
November 30, 2018. The Draft EA analyzes the potential environmental
impacts of the proposed action and alternatives, including the no-
action alternative. The Draft EA addresses environmental issues and
concerns identified during the scoping process. It also contains OEA's
preliminary recommendations for environmental mitigation measures, and
Palmetto Railways' voluntary mitigation measures.
The Draft EA will be available on November 30, 2018 through the
Board's website at https://www.stb.gov by following the decisions link,
through the project website at https://www.CampHallRailNEPA.com, and at
all public libraries in Berkeley County, South Carolina.
Next Steps: Following the close of the 30-day comment period on
December 30, 2018 of the Draft EA, OEA, the Corps, and the cooperating
agencies will issue a Final EA that considers comments on the Draft EA.
The Board will then issue a final decision based on the Draft and Final
EAs and all public and agency comments in the public record for this
proceeding. The final decision will address the transportation merits
of the proposed project and the entire environmental record. That final
decision will take one of three actions: Approve the proposed project,
deny it, or approve it with mitigation conditions, including
environmental conditions.
Written Comments: Any interested party may submit written comments
on the Draft EA. The procedures for submitting written comments are
outlined below:
ADDRESSES: Please mail written comments on the Draft EA and the
recommended environmental mitigation to: Ms. Diana Wood, Surface
Transportation Board, Docket No. FD 36095, c/o ICF, 9300 Lee Highway,
Fairfax, VA 22031. Electronic comments on this Draft EA may also be
submitted electronically on the joint lead agencies' project website
(https://www.CampHallRailNepa.com) or emailed to
[email protected]. Please refer to Docket No. FD 36095 in
all correspondence, including electronic, addressed to the joint lead
agencies.
DATES: The EA will be available for public review and comment on
November 30, 2018. Mailed comments must be postmarked by December 30,
2018. Electronic comments must be received by December 30, 2018.
FOR FURTHER INFORMATION CONTACT: Diana Wood, Surface Transportation
Board, Docket No. FD 36095, c/o ICF, 9300 Lee Highway, Fairfax, VA
22031.
Dated: November 15, 2018.
By the Board, Victoria Ruston, Director, Office of Environmental
Analysis.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2018-25446 Filed 11-29-18; 8:45 am]
BILLING CODE 4915-01-P