Eastern Shore Natural Gas Company; Notice of Schedule for Environmental Review of the Del-Mar Energy Pathway Project, 60837-60838 [2018-25804]
Download as PDF
Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–25773 Filed 11–26–18; 8:45 am]
BILLING CODE 6717–01–P
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on December 14, 2018.
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
Iron Horse Pipeline, LLC; Notice of
Petition for Declaratory Order
Take notice that on November 16,
2018, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2) (2017), Iron Horse
Pipeline, LLC (Iron Horse or Petitioner)
filed a petition for declaratory order
requesting that the Commission approve
Iron Horse’s proposed rate structures,
Committed Shipper Rights, and certain
prorationing provisions for shippers and
the Transportation Service Agreement,
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
17:45 Nov 26, 2018
Dated: November 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25809 Filed 11–26–18; 8:45 am]
DEPARTMENT OF ENERGY
[FR Doc. 2018–25812 Filed 11–26–18; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. CP18–548–000]
Federal Energy Regulatory
Commission
Eastern Shore Natural Gas Company;
Notice of Schedule for Environmental
Review of the Del-Mar Energy Pathway
Project
[Docket No. OR19–9–000]
VerDate Sep<11>2014
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 11, 2018.
BILLING CODE 6717–01–P
Dated: November 20, 2018.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
60837
Jkt 247001
[Docket No. NJ17–19–000]
Buckeye Power, Inc.; Notice of Filing
Take notice that on October 31, 2018,
Buckeye Power, Inc. submitted its tariff
filing: Refund Report NJ17–19 and
NJ18–9 to be effective N/A.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
On September 14, 2018, Eastern Shore
Natural Gas Company (Eastern Shore)
filed an application in Docket No.
CP18–548–000 requesting a Certificate
of Public Convenience and Necessity
pursuant to Section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the DelMar Energy Pathway Project (Project),
and would provide about 11.8 million
cubic feet per day of additional natural
gas firm transportation and 2.5 million
cubic feet per day of off-peak
transportation service to three local
distribution companies and one
industrial shipper.
On September 27, 2018, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
E:\FR\FM\27NON1.SGM
27NON1
60838
Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—April 1, 2019.
90-day Federal Authorization
Decision Deadline—June 30, 2019.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Eastern Shore proposes to construct
and operate new natural gas pipelines
and meter and delivery stations in Kent
and Sussex Counties, Delaware, and
Wicomico and Somerset Counties,
Maryland.
The Project would consist of
construction and operation of the
following facilities:
Woodside Loop 1 Kent County, Delaware
• 4.9 miles of new 16-inch-diameter
pipeline looping its existing pipeline.
East Sussex Extension Sussex County,
Delaware
• 7.39 miles of new 8-inch-diameter
mainline extension to the existing
Milford Line;
• one aboveground pig launcher and
one pig receiver,2 and aboveground
mainline valve; and
• one new delivery metering and
regulation (M&R) station.
Millsboro Pressure Control Station
Upgrade Millsboro, Sussex County,
Delaware
• 0.35 mile of 10-inch-diameter
pipeline extension between the existing
Millsboro Pressure Control Station and
the existing Milford Line; and
• a dual run pressure control addition
to the existing Millsboro Pressure
Control Station with modifications to
the existing piping, valves, and
associated electronic transmitters.
amozie on DSK3GDR082PROD with NOTICES1
Somerset Extension Wicomico and
Somerset Counties, Maryland
• 6.83 miles of new 10-inch-diameter
pipeline extension to the existing
Parkesburg Line;
• one aboveground pig launcher and
one pig receiver, and aboveground
mainline valve; and
• one new delivery M&R station at
the Somerset Extension terminus.
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
2 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
VerDate Sep<11>2014
17:45 Nov 26, 2018
Jkt 247001
Background
DEPARTMENT OF ENERGY
On November 2, 2018 the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Del-Mar Energy
Pathway Project, Request for Comments
on Environmental Issues, Notice of
Public Scoping Session, and Notice of
Onsite Review (NOI). The NOI was sent
to affected landowners; federal, state,
and local government agencies; elected
officials; environmental and public
interest groups; Native American tribes;
other interested parties; and local
libraries and newspapers. Comments on
the NOI should be received by the
Commission in Washington, DC on or
before 5:00 p.m. Eastern Time on
December 3, 2018. All substantive
comments received at the scoping
session or filed in the Commission’s
public record will be addressed in the
EA.
Federal Energy Regulatory
Commission
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP18–548), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: November 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25804 Filed 11–26–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–27–000.
Applicants: IIF US Holding LP, IIF US
Holding 2 LP.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of IIF US
Holding LP, et al.
Filed Date: 11/16/18.
Accession Number: 20181116–5234.
Comments Due: 5 p.m. ET 12/7/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–23–000.
Applicants: Antelope DSR 3, LLC.
Description: Notice of SelfCertification of EWG Status of Antelope
DSR 3, LLC.
Filed Date: 11/19/18.
Accession Number: 20181119–5112.
Comments Due: 5 p.m. ET 12/10/18.
Docket Numbers: EG19–24–000.
Applicants: San Pablo Raceway, LLC.
Description: Notice of SelfCertification of EWG Status of San Pablo
Raceway, LLC.
Filed Date: 11/19/18.
Accession Number: 20181119–5113.
Comments Due: 5 p.m. ET 12/10/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2630–002;
ER16–1914–002.
Applicants: NGP Blue Mountain I
LLC, Patua Acquisition Company, LLC.
Description: Supplement to
September 27, 2018 Notice of NonMaterial Change in Status of NGP Blue
Mountain I LLC, et al.
Filed Date: 11/16/18.
Accession Number: 20181116–5239.
Comments Due: 5 p.m. ET 12/7/18.
Docket Numbers: ER10–2738–006.
Applicants: The Empire District
Electric Company.
Description: Supplement to June 29,
2018 Updated Market Power Analysis of
The Empire District Electric Company.
Filed Date: 11/16/18.
Accession Number: 20181116–5264.
Comments Due: 5 p.m. ET 12/7/18.
Docket Numbers: ER19–360–000.
Applicants: American Transmission
Company LLC.
Description: Application for
Authorization for Abandoned Plant
Incentive Rate Treatment of American
Transmission Company LLC.
E:\FR\FM\27NON1.SGM
27NON1
Agencies
[Federal Register Volume 83, Number 228 (Tuesday, November 27, 2018)]
[Notices]
[Pages 60837-60838]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25804]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-548-000]
Eastern Shore Natural Gas Company; Notice of Schedule for
Environmental Review of the Del-Mar Energy Pathway Project
On September 14, 2018, Eastern Shore Natural Gas Company (Eastern
Shore) filed an application in Docket No. CP18-548-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities. The proposed project is known as the Del-Mar
Energy Pathway Project (Project), and would provide about 11.8 million
cubic feet per day of additional natural gas firm transportation and
2.5 million cubic feet per day of off-peak transportation service to
three local distribution companies and one industrial shipper.
On September 27, 2018, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's
[[Page 60838]]
planned schedule for the completion of the EA for the Project.
Schedule for Environmental Review
Issuance of EA--April 1, 2019.
90-day Federal Authorization Decision Deadline--June 30, 2019.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Eastern Shore proposes to construct and operate new natural gas
pipelines and meter and delivery stations in Kent and Sussex Counties,
Delaware, and Wicomico and Somerset Counties, Maryland.
The Project would consist of construction and operation of the
following facilities:
Woodside Loop \1\ Kent County, Delaware
4.9 miles of new 16-inch-diameter pipeline looping its
existing pipeline.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
---------------------------------------------------------------------------
East Sussex Extension Sussex County, Delaware
7.39 miles of new 8-inch-diameter mainline extension to
the existing Milford Line;
one aboveground pig launcher and one pig receiver,\2\ and
aboveground mainline valve; and
---------------------------------------------------------------------------
\2\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
one new delivery metering and regulation (M&R) station.
Millsboro Pressure Control Station Upgrade Millsboro, Sussex County,
Delaware
0.35 mile of 10-inch-diameter pipeline extension between
the existing Millsboro Pressure Control Station and the existing
Milford Line; and
a dual run pressure control addition to the existing
Millsboro Pressure Control Station with modifications to the existing
piping, valves, and associated electronic transmitters.
Somerset Extension Wicomico and Somerset Counties, Maryland
6.83 miles of new 10-inch-diameter pipeline extension to
the existing Parkesburg Line;
one aboveground pig launcher and one pig receiver, and
aboveground mainline valve; and
one new delivery M&R station at the Somerset Extension
terminus.
Background
On November 2, 2018 the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Del-Mar Energy
Pathway Project, Request for Comments on Environmental Issues, Notice
of Public Scoping Session, and Notice of Onsite Review (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. Comments on the NOI should be received by the
Commission in Washington, DC on or before 5:00 p.m. Eastern Time on
December 3, 2018. All substantive comments received at the scoping
session or filed in the Commission's public record will be addressed in
the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP18-548), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: November 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25804 Filed 11-26-18; 8:45 am]