Download as PDF 60838 Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA—April 1, 2019. 90-day Federal Authorization Decision Deadline—June 30, 2019. If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Eastern Shore proposes to construct and operate new natural gas pipelines and meter and delivery stations in Kent and Sussex Counties, Delaware, and Wicomico and Somerset Counties, Maryland. The Project would consist of construction and operation of the following facilities: Woodside Loop 1 Kent County, Delaware • 4.9 miles of new 16-inch-diameter pipeline looping its existing pipeline. East Sussex Extension Sussex County, Delaware • 7.39 miles of new 8-inch-diameter mainline extension to the existing Milford Line; • one aboveground pig launcher and one pig receiver,2 and aboveground mainline valve; and • one new delivery metering and regulation (M&R) station. Millsboro Pressure Control Station Upgrade Millsboro, Sussex County, Delaware • 0.35 mile of 10-inch-diameter pipeline extension between the existing Millsboro Pressure Control Station and the existing Milford Line; and • a dual run pressure control addition to the existing Millsboro Pressure Control Station with modifications to the existing piping, valves, and associated electronic transmitters. amozie on DSK3GDR082PROD with NOTICES1 Somerset Extension Wicomico and Somerset Counties, Maryland • 6.83 miles of new 10-inch-diameter pipeline extension to the existing Parkesburg Line; • one aboveground pig launcher and one pig receiver, and aboveground mainline valve; and • one new delivery M&R station at the Somerset Extension terminus. 1 A pipeline loop is a segment of pipe constructed parallel to an existing pipeline to increase capacity. 2 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. VerDate Sep<11>2014 17:45 Nov 26, 2018 Jkt 247001 Background DEPARTMENT OF ENERGY On November 2, 2018 the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Del-Mar Energy Pathway Project, Request for Comments on Environmental Issues, Notice of Public Scoping Session, and Notice of Onsite Review (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. Comments on the NOI should be received by the Commission in Washington, DC on or before 5:00 p.m. Eastern Time on December 3, 2018. All substantive comments received at the scoping session or filed in the Commission’s public record will be addressed in the EA. Federal Energy Regulatory Commission Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP18–548), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: November 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–25804 Filed 11–26–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–27–000. Applicants: IIF US Holding LP, IIF US Holding 2 LP. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of IIF US Holding LP, et al. Filed Date: 11/16/18. Accession Number: 20181116–5234. Comments Due: 5 p.m. ET 12/7/18. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–23–000. Applicants: Antelope DSR 3, LLC. Description: Notice of SelfCertification of EWG Status of Antelope DSR 3, LLC. Filed Date: 11/19/18. Accession Number: 20181119–5112. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: EG19–24–000. Applicants: San Pablo Raceway, LLC. Description: Notice of SelfCertification of EWG Status of San Pablo Raceway, LLC. Filed Date: 11/19/18. Accession Number: 20181119–5113. Comments Due: 5 p.m. ET 12/10/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2630–002; ER16–1914–002. Applicants: NGP Blue Mountain I LLC, Patua Acquisition Company, LLC. Description: Supplement to September 27, 2018 Notice of NonMaterial Change in Status of NGP Blue Mountain I LLC, et al. Filed Date: 11/16/18. Accession Number: 20181116–5239. Comments Due: 5 p.m. ET 12/7/18. Docket Numbers: ER10–2738–006. Applicants: The Empire District Electric Company. Description: Supplement to June 29, 2018 Updated Market Power Analysis of The Empire District Electric Company. Filed Date: 11/16/18. Accession Number: 20181116–5264. Comments Due: 5 p.m. ET 12/7/18. Docket Numbers: ER19–360–000. Applicants: American Transmission Company LLC. Description: Application for Authorization for Abandoned Plant Incentive Rate Treatment of American Transmission Company LLC. E:\FR\FM\27NON1.SGM 27NON1 amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices Filed Date: 11/16/18. Accession Number: 20181116–5232. Comments Due: 5 p.m. ET 12/7/18. Docket Numbers: ER19–361–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company, Michigan Electric Transmission Company, LLC, ITC Midwest LLC. Description: Compliance filing: 2018– 11–19_Attachment O Compliance for ITC Companies re Transco Adder (EL18–140) to be effective 4/20/2018. Filed Date: 11/19/18. Accession Number: 20181119–5051. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: ER19–362–000. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: § 205(d) Rate Filing: 2018–11–19_SA 3211 MP–GRE IA (Birch Lake) to be effective 11/20/2018. Filed Date: 11/19/18. Accession Number: 20181119–5076. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: ER19–363–000. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: § 205(d) Rate Filing: 2018–11–19_SA 3212 MP–GRE ICA (Bergen Lake) to be effective 11/20/2018. Filed Date: 11/19/18. Accession Number: 20181119–5078. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: ER19–364–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Happy Hollow Solar Center LGIA Filing to be effective 11/5/2018. Filed Date: 11/19/18. Accession Number: 20181119–5116. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: ER19–365–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCo–WAPA–TSGT Inter–Entitle– O&M–367–Exh O–0.1.0 to be effective 11/20/2018. Filed Date: 11/19/18. Accession Number: 20181119–5124. Comments Due: 5 p.m. ET 12/10/18. Docket Numbers: ER19–366–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2018–11–19 Att N–LGIP—Xcel Queue Reform to be effective 2/1/2019. Filed Date: 11/19/18. Accession Number: 20181119–5152. Comments Due: 5 p.m. ET 12/10/18. The filings are accessible in the Commission’s eLibrary system by VerDate Sep<11>2014 17:45 Nov 26, 2018 Jkt 247001 clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 19, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–25756 Filed 11–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR19–14–000. Applicants: Louisville Gas and Electric Company. Description: Tariff filing per 284.123(b),(e)/: Revised Statement of Operating Conditions DDC and LAUFG to be effective 11/1/2018. Filed Date: 11/13/18. Accession Number: 201811135011. Comments/Protests Due: 5 p.m. ET 12/4/18. Docket Number: PR19–15–000. Applicants: Alpine High Pipeline LP. Description: Tariff filing per 284.123(b),(e)+(g): Revised Statement of Operating Conditions to be effective 11/ 1/2018. Filed Date: 11/13/18. Accession Number: 201811135267. Comments Due: 5 p.m. ET 12/4/18. 284.123(g) Protests Due: 5 p.m. ET 1/ 14/19. Docket Number: PR19–16–000. Applicants: Lee 8 Storage Partnership. Description: Tariff filing per 284.123(b)(2)+(g): Petition for Rate Approval to be effective 11/14/2018. Filed Date: 11/14/18. Accession Number: 201811145042. Comments Due: 5 p.m. ET 12/5/18. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 60839 284.123(g) Protests Due: 5 p.m. ET 1/ 14/19. Docket Number: PR19–17–000. Applicants: Black Hills Energy Arkansas, Inc. Description: Tariff filing per 284.123(b),(e)/: BHEA SOC Filing to be effective 11/15/2018. Filed Date: 11/15/18. Accession Number: 201811155052. Comments/Protests Due: 5 p.m. ET 12/6/18. Docket Number: PR19–18–000. Applicants: Rocky Mountain Natural Gas LLC. Description: Tariff filing per 284.123(b),(e)/: RMNG Revised SOC Filing to be effective 11/1/2018. Filed Date: 11/15/18. Accession Number: 201811155053. Comments/Protests Due: 5 p.m. ET 12/6/18. Docket Numbers: RP19–297–000. Applicants: Texas Eastern Transmission, LP. Description: eTariff filing per 1430: TETLP Extension to file Form 501–G. Filed Date: 11/16/18. Accession Number: 20181116–5177. Comments Due: 5 p.m. ET 11/21/18. Docket Numbers: RP19–298–000. Applicants: Columbia Gas Transmission, LLC. Description: § 4(d) Rate Filing: WBX East Amendments Filing to be effective 11/16/2018. Filed Date: 11/16/18. Accession Number: 20181116–5179. Comments Due: 5 p.m. ET 11/28/18. Docket Numbers: RP19–299–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Gulf Connector Initial Rate Filing—REV to be effective 12/1/2018. Filed Date: 11/19/18. Accession Number: 20181119–5000. Comments Due: 5 p.m. ET 12/3/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ E:\FR\FM\27NON1.SGM 27NON1

Agencies

[Federal Register Volume 83, Number 228 (Tuesday, November 27, 2018)]
[Notices]
[Pages 60838-60839]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25756]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC19-27-000.
    Applicants: IIF US Holding LP, IIF US Holding 2 LP.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of IIF US Holding LP, et al.
    Filed Date: 11/16/18.
    Accession Number: 20181116-5234.
    Comments Due: 5 p.m. ET 12/7/18.

    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG19-23-000.
    Applicants: Antelope DSR 3, LLC.
    Description: Notice of Self-Certification of EWG Status of Antelope 
DSR 3, LLC.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5112.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: EG19-24-000.
    Applicants: San Pablo Raceway, LLC.
    Description: Notice of Self-Certification of EWG Status of San 
Pablo Raceway, LLC.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5113.
    Comments Due: 5 p.m. ET 12/10/18.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-2630-002; ER16-1914-002.
    Applicants: NGP Blue Mountain I LLC, Patua Acquisition Company, 
LLC.
    Description: Supplement to September 27, 2018 Notice of Non-
Material Change in Status of NGP Blue Mountain I LLC, et al.
    Filed Date: 11/16/18.
    Accession Number: 20181116-5239.
    Comments Due: 5 p.m. ET 12/7/18.

    Docket Numbers: ER10-2738-006.
    Applicants: The Empire District Electric Company.
    Description: Supplement to June 29, 2018 Updated Market Power 
Analysis of The Empire District Electric Company.
    Filed Date: 11/16/18.
    Accession Number: 20181116-5264.
    Comments Due: 5 p.m. ET 12/7/18.

    Docket Numbers: ER19-360-000.
    Applicants: American Transmission Company LLC.
    Description: Application for Authorization for Abandoned Plant 
Incentive Rate Treatment of American Transmission Company LLC.

[[Page 60839]]

    Filed Date: 11/16/18.
    Accession Number: 20181116-5232.
    Comments Due: 5 p.m. ET 12/7/18.

    Docket Numbers: ER19-361-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
International Transmission Company, Michigan Electric Transmission 
Company, LLC, ITC Midwest LLC.
    Description: Compliance filing: 2018-11-19_Attachment O Compliance 
for ITC Companies re Transco Adder (EL18-140) to be effective 4/20/
2018.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5051.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: ER19-362-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-19_SA 3211 MP-GRE IA 
(Birch Lake) to be effective 11/20/2018.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5076.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: ER19-363-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-19_SA 3212 MP-GRE 
ICA (Bergen Lake) to be effective 11/20/2018.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5078.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: ER19-364-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Happy Hollow Solar Center 
LGIA Filing to be effective 11/5/2018.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5116.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: ER19-365-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: PSCo-WAPA-TSGT Inter-
Entitle-O&M-367-Exh O-0.1.0 to be effective 11/20/2018.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5124.
    Comments Due: 5 p.m. ET 12/10/18.

    Docket Numbers: ER19-366-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: 2018-11-19 Att N-LGIP--Xcel 
Queue Reform to be effective 2/1/2019.
    Filed Date: 11/19/18.
    Accession Number: 20181119-5152.
    Comments Due: 5 p.m. ET 12/10/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-25756 Filed 11-26-18; 8:45 am]
 BILLING CODE 6717-01-P