Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene; N.E.W. Hydro, LLC, 60417-60418 [2018-25638]
Download as PDF
Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 28, 2018.
Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 6, 2018.
Dated: November 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25640 Filed 11–23–18; 8:45 am]
[FR Doc. 2018–25582 Filed 11–23–18; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2689–040]
[Docket No. NJ19–1–000]
Notice of Supplement Filing; City of
Vernon, California
Take notice that on November 15,
2018, the City of Vernon, California
submitted a Letter Supplementing
October 31, 2018 City of Vernon,
California tariff filing (Error in
Transmission Revenue Balancing
Account Adjustment).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
VerDate Sep<11>2014
17:28 Nov 23, 2018
Jkt 247001
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene; N.E.W.
Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–2689–040.
c. Date Filed: November 2, 2018.
d. Licensee: N.E.W. Hydro, LLC.
e. Name and Location of Project:
Oconto Falls (Lower) Hydroelectric
Project, located on the Oconto River, in
the City of Oconto Falls, Oconto County,
Wisconsin.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Licensee Contact Information: Mr.
Michael Scarzello, Regulatory Director,
Eagle Creek Renewable Energy, LLC,
116 N State Street, P.O. Box 167,
Neshkoro, Wisconsin 54960, (973) 998–
8400, Michael.Scarzello@
eaglecrekre.com.
h. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice by the Commission. The
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
60417
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2689–040.
j. Description of Proceeding: N.E.W.
Hydro, LLC, licensee for the Oconto
Falls (Lower) Project No. 2689, filed a
request with the Commission to extend
the term of the project license, from
April 30, 2024 to October 31, 2027,
which would align its modified
expiration date with that of the
licensee’s Oconto Falls (Upper) Project
No. 2523, located approximately 2,000
feet upstream. The licensee requests the
license term extension to coordinate and
streamline relicensing efforts, including
developing and implementing study
plans and consultation with resource
agencies for both projects.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE, Washington, DC
20426. The filing may also be viewed on
the Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–2689–040)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
E:\FR\FM\26NON1.SGM
26NON1
60418
Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25638 Filed 11–23–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:28 Nov 23, 2018
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2837–033]
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions:
Erie Boulevard Hydropower, L.P.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2837–033.
c. Date filed: March 29, 2018.
d. Applicant: Erie Boulevard
Hydropower, L.P. (Erie).
e. Name of Project: Granby
Hydroelectric Project.
f. Location: On the Oswego River in
the town of Fulton in Oswego County,
New York. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Steven P.
Murphy, Director, U.S. Licensing, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, NY 13069;
(315) 598–6130.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2837–033.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Granby Hydroelectric
Project (Granby Project) consists of: (1)
An 88-foot-wide reinforced concrete
intake structure that includes two bays
containing trashracks and fixed-roller,
vertical-lift type gates; (2) a 17-foot-wide
sluice opening adjacent to the intake
structure; (3) a 112-foot-long, 88-footwide powerhouse containing two 5.04megawatt (MW) turbine-generator units,
with a total capacity of 10.08 MW; (4)
a 3,000-foot-long, 100-foot-wide tailrace;
(5) two 4.16-kilovolt, 120-foot-long
underground generator leads; (6) a 60foot-long by 48-foot-wide electrical
switchyard; and (7) appurtenant
facilities.
The Granby Project is operated in a
modified run-of-river mode. The Granby
Project and the Fulton Development at
Erie’s Oswego River Hydroelectric
Project (FERC Project No. 2474) are
located at opposite ends of the same
dam and share a single bypassed reach
and reservoir. The flow and
impoundment elevation requirements in
the Oswego Project license,1 which were
based on a 2004 Offer of Settlement,
affect the Granby Project. The average
annual generation at the Granby Project
is estimated to be 44,181 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
1 109
E:\FR\FM\26NON1.SGM
FERC ¶ 62, 141 (2004).
26NON1
Agencies
[Federal Register Volume 83, Number 227 (Monday, November 26, 2018)]
[Notices]
[Pages 60417-60418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25638]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2689-040]
Notice of Application Accepted for Filing, Soliciting Comments,
Protests and Motions To Intervene; N.E.W. Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Extension of License Term.
b. Project No.: P-2689-040.
c. Date Filed: November 2, 2018.
d. Licensee: N.E.W. Hydro, LLC.
e. Name and Location of Project: Oconto Falls (Lower) Hydroelectric
Project, located on the Oconto River, in the City of Oconto Falls,
Oconto County, Wisconsin.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Licensee Contact Information: Mr. Michael Scarzello, Regulatory
Director, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O.
Box 167, Neshkoro, Wisconsin 54960, (973) 998-8400,
[email protected].
h. FERC Contact: Mr. Ashish Desai, (202) 502-8370,
[email protected].
i. Deadline for filing comments, motions to intervene and protests,
is 30 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, comments, and recommendations, using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2689-040.
j. Description of Proceeding: N.E.W. Hydro, LLC, licensee for the
Oconto Falls (Lower) Project No. 2689, filed a request with the
Commission to extend the term of the project license, from April 30,
2024 to October 31, 2027, which would align its modified expiration
date with that of the licensee's Oconto Falls (Upper) Project No. 2523,
located approximately 2,000 feet upstream. The licensee requests the
license term extension to coordinate and streamline relicensing
efforts, including developing and implementing study plans and
consultation with resource agencies for both projects.
k. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may also be viewed on the Commission's
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-2689-040) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676 or email
[email protected]. For TTY, call (202) 502-8659.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments
[[Page 60418]]
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to the request to extend the license term. Agencies may obtain copies
of the application directly from the applicant. A copy of any protest
or motion to intervene must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: November 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25638 Filed 11-23-18; 8:45 am]
BILLING CODE 6717-01-P