Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene; N.E.W. Hydro, LLC, 60417-60418 [2018-25638]

Download as PDF Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 28, 2018. Dated: November 16, 2018. Kimberly D. Bose, Secretary. should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 6, 2018. Dated: November 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–25640 Filed 11–23–18; 8:45 am] [FR Doc. 2018–25582 Filed 11–23–18; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2689–040] [Docket No. NJ19–1–000] Notice of Supplement Filing; City of Vernon, California Take notice that on November 15, 2018, the City of Vernon, California submitted a Letter Supplementing October 31, 2018 City of Vernon, California tariff filing (Error in Transmission Revenue Balancing Account Adjustment). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically VerDate Sep<11>2014 17:28 Nov 23, 2018 Jkt 247001 Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene; N.E.W. Hydro, LLC Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Extension of License Term. b. Project No.: P–2689–040. c. Date Filed: November 2, 2018. d. Licensee: N.E.W. Hydro, LLC. e. Name and Location of Project: Oconto Falls (Lower) Hydroelectric Project, located on the Oconto River, in the City of Oconto Falls, Oconto County, Wisconsin. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. g. Licensee Contact Information: Mr. Michael Scarzello, Regulatory Director, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O. Box 167, Neshkoro, Wisconsin 54960, (973) 998– 8400, Michael.Scarzello@ eaglecrekre.com. h. FERC Contact: Mr. Ashish Desai, (202) 502–8370, Ashish.Desai@ferc.gov. i. Deadline for filing comments, motions to intervene and protests, is 30 days from the issuance date of this notice by the Commission. The PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 60417 Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, and recommendations, using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2689–040. j. Description of Proceeding: N.E.W. Hydro, LLC, licensee for the Oconto Falls (Lower) Project No. 2689, filed a request with the Commission to extend the term of the project license, from April 30, 2024 to October 31, 2027, which would align its modified expiration date with that of the licensee’s Oconto Falls (Upper) Project No. 2523, located approximately 2,000 feet upstream. The licensee requests the license term extension to coordinate and streamline relicensing efforts, including developing and implementing study plans and consultation with resource agencies for both projects. k. This notice is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the Docket number (P–2689–040) excluding the last three digits in the docket number field to access the notice. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments E:\FR\FM\26NON1.SGM 26NON1 60418 Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the request to extend the license term. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: November 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–25638 Filed 11–23–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:28 Nov 23, 2018 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2837–033] Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions: Erie Boulevard Hydropower, L.P. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2837–033. c. Date filed: March 29, 2018. d. Applicant: Erie Boulevard Hydropower, L.P. (Erie). e. Name of Project: Granby Hydroelectric Project. f. Location: On the Oswego River in the town of Fulton in Oswego County, New York. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Steven P. Murphy, Director, U.S. Licensing, Erie Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, NY 13069; (315) 598–6130. i. FERC Contact: Allyson Conner, (202) 502–6082 or allyson.conner@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2837–033. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, and is ready for environmental analysis at this time. l. The existing Granby Hydroelectric Project (Granby Project) consists of: (1) An 88-foot-wide reinforced concrete intake structure that includes two bays containing trashracks and fixed-roller, vertical-lift type gates; (2) a 17-foot-wide sluice opening adjacent to the intake structure; (3) a 112-foot-long, 88-footwide powerhouse containing two 5.04megawatt (MW) turbine-generator units, with a total capacity of 10.08 MW; (4) a 3,000-foot-long, 100-foot-wide tailrace; (5) two 4.16-kilovolt, 120-foot-long underground generator leads; (6) a 60foot-long by 48-foot-wide electrical switchyard; and (7) appurtenant facilities. The Granby Project is operated in a modified run-of-river mode. The Granby Project and the Fulton Development at Erie’s Oswego River Hydroelectric Project (FERC Project No. 2474) are located at opposite ends of the same dam and share a single bypassed reach and reservoir. The flow and impoundment elevation requirements in the Oswego Project license,1 which were based on a 2004 Offer of Settlement, affect the Granby Project. The average annual generation at the Granby Project is estimated to be 44,181 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the 1 109 E:\FR\FM\26NON1.SGM FERC ¶ 62, 141 (2004). 26NON1

Agencies

[Federal Register Volume 83, Number 227 (Monday, November 26, 2018)]
[Notices]
[Pages 60417-60418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25638]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2689-040]


Notice of Application Accepted for Filing, Soliciting Comments, 
Protests and Motions To Intervene; N.E.W. Hydro, LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Extension of License Term.
    b. Project No.: P-2689-040.
    c. Date Filed: November 2, 2018.
    d. Licensee: N.E.W. Hydro, LLC.
    e. Name and Location of Project: Oconto Falls (Lower) Hydroelectric 
Project, located on the Oconto River, in the City of Oconto Falls, 
Oconto County, Wisconsin.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    g. Licensee Contact Information: Mr. Michael Scarzello, Regulatory 
Director, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O. 
Box 167, Neshkoro, Wisconsin 54960, (973) 998-8400, 
[email protected].
    h. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
[email protected].
    i. Deadline for filing comments, motions to intervene and protests, 
is 30 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, comments, and recommendations, using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2689-040.
    j. Description of Proceeding: N.E.W. Hydro, LLC, licensee for the 
Oconto Falls (Lower) Project No. 2689, filed a request with the 
Commission to extend the term of the project license, from April 30, 
2024 to October 31, 2027, which would align its modified expiration 
date with that of the licensee's Oconto Falls (Upper) Project No. 2523, 
located approximately 2,000 feet upstream. The licensee requests the 
license term extension to coordinate and streamline relicensing 
efforts, including developing and implementing study plans and 
consultation with resource agencies for both projects.
    k. This notice is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE, 
Washington, DC 20426. The filing may also be viewed on the Commission's 
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
Docket number (P-2689-040) excluding the last three digits in the 
docket number field to access the notice. You may also register online 
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call toll-free 1-866-208-3676 or email 
[email protected]. For TTY, call (202) 502-8659.
    l. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    m. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments

[[Page 60418]]

filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    n. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the request to extend the license term. Agencies may obtain copies 
of the application directly from the applicant. A copy of any protest 
or motion to intervene must be served upon each representative of the 
applicant specified in the particular application. If an intervener 
files comments or documents with the Commission relating to the merits 
of an issue that may affect the responsibilities of a particular 
resource agency, they must also serve a copy of the document on that 
resource agency. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: November 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25638 Filed 11-23-18; 8:45 am]
 BILLING CODE 6717-01-P