Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions: Erie Boulevard Hydropower, L.P., 60418-60419 [2018-25580]
Download as PDF
60418
Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25638 Filed 11–23–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:28 Nov 23, 2018
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2837–033]
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions:
Erie Boulevard Hydropower, L.P.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2837–033.
c. Date filed: March 29, 2018.
d. Applicant: Erie Boulevard
Hydropower, L.P. (Erie).
e. Name of Project: Granby
Hydroelectric Project.
f. Location: On the Oswego River in
the town of Fulton in Oswego County,
New York. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Steven P.
Murphy, Director, U.S. Licensing, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, NY 13069;
(315) 598–6130.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2837–033.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Granby Hydroelectric
Project (Granby Project) consists of: (1)
An 88-foot-wide reinforced concrete
intake structure that includes two bays
containing trashracks and fixed-roller,
vertical-lift type gates; (2) a 17-foot-wide
sluice opening adjacent to the intake
structure; (3) a 112-foot-long, 88-footwide powerhouse containing two 5.04megawatt (MW) turbine-generator units,
with a total capacity of 10.08 MW; (4)
a 3,000-foot-long, 100-foot-wide tailrace;
(5) two 4.16-kilovolt, 120-foot-long
underground generator leads; (6) a 60foot-long by 48-foot-wide electrical
switchyard; and (7) appurtenant
facilities.
The Granby Project is operated in a
modified run-of-river mode. The Granby
Project and the Fulton Development at
Erie’s Oswego River Hydroelectric
Project (FERC Project No. 2474) are
located at opposite ends of the same
dam and share a single bypassed reach
and reservoir. The flow and
impoundment elevation requirements in
the Oswego Project license,1 which were
based on a 2004 Offer of Settlement,
affect the Granby Project. The average
annual generation at the Granby Project
is estimated to be 44,181 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
1 109
E:\FR\FM\26NON1.SGM
FERC ¶ 62, 141 (2004).
26NON1
Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and
conditions, or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Comments, Recommendations
and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply
Comments.
Commission issues EA .........
Comments on EA Due ..........
January 2019.
March 2019.
July 2019.
August 2019.
Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25580 Filed 11–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–43–000]
Alabama Power Company, Georgia
Power Company, Gulf Power
Company, Mississippi Power
Company; Notice of Amended Petition
for Declaratory Order
Take notice that on November 15,
2018, pursuant to Rule 207(a)(2) of the
VerDate Sep<11>2014
17:28 Nov 23, 2018
Jkt 247001
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2), Southern Company
Services, Inc., acting as agent for
Alabama Power Company, Georgia
Power Company, Gulf Power Company,
and Mississippi Power Company
(collectively, Southern Companies),
submitted an amendment to its petition
for declaratory order and request to hold
proceedings in abeyance, filed on
November 28, 2017. In the amendment,
Southern Companies requests that the
Commission lift the abeyance in this
proceeding and seeks declarations that:
(1) Those certain audit
recommendations be set aside, and (2)
Southern Companies’ formula rate in its
Open Access Transmission Tariff
provide the requisite flexibility to make
the ratemaking adjustment necessary to
allow Southern Companies to avoid
normalization violation, as more fully
explained in the amended petition for
declaratory order.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
60419
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov.or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 6, 2018.
Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25583 Filed 11–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. NJ19–2–000]
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on November 7,
2018, Oncor Electric Delivery Company
LLC submitted its tariff filing: Oncor
Tex-La Tariff Rate Changes to be
effective 10/10/2018.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
E:\FR\FM\26NON1.SGM
26NON1
Agencies
[Federal Register Volume 83, Number 227 (Monday, November 26, 2018)]
[Notices]
[Pages 60418-60419]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25580]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2837-033]
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions: Erie Boulevard Hydropower, L.P.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2837-033.
c. Date filed: March 29, 2018.
d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
e. Name of Project: Granby Hydroelectric Project.
f. Location: On the Oswego River in the town of Fulton in Oswego
County, New York. The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Steven P. Murphy, Director, U.S. Licensing,
Erie Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, NY
13069; (315) 598-6130.
i. FERC Contact: Allyson Conner, (202) 502-6082 or
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2837-033.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The existing Granby Hydroelectric Project (Granby Project)
consists of: (1) An 88-foot-wide reinforced concrete intake structure
that includes two bays containing trashracks and fixed-roller,
vertical-lift type gates; (2) a 17-foot-wide sluice opening adjacent to
the intake structure; (3) a 112-foot-long, 88-foot-wide powerhouse
containing two 5.04-megawatt (MW) turbine-generator units, with a total
capacity of 10.08 MW; (4) a 3,000-foot-long, 100-foot-wide tailrace;
(5) two 4.16-kilovolt, 120-foot-long underground generator leads; (6) a
60-foot-long by 48-foot-wide electrical switchyard; and (7) appurtenant
facilities.
The Granby Project is operated in a modified run-of-river mode. The
Granby Project and the Fulton Development at Erie's Oswego River
Hydroelectric Project (FERC Project No. 2474) are located at opposite
ends of the same dam and share a single bypassed reach and reservoir.
The flow and impoundment elevation requirements in the Oswego Project
license,\1\ which were based on a 2004 Offer of Settlement, affect the
Granby Project. The average annual generation at the Granby Project is
estimated to be 44,181 megawatt-hours.
---------------------------------------------------------------------------
\1\ 109 FERC ] 62, 141 (2004).
---------------------------------------------------------------------------
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the
[[Page 60419]]
filing; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions, or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Each
filing must be accompanied by proof of service on all persons listed on
the service list prepared by the Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Comments, January 2019.
Recommendations and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply Comments....... March 2019.
Commission issues EA..................... July 2019.
Comments on EA Due....................... August 2019.
------------------------------------------------------------------------
Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25580 Filed 11-23-18; 8:45 am]
BILLING CODE 6717-01-P