Marine Renewable Energy Collaborative of New England; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a Hydrokinetic Pilot Project License Application, and Soliciting Comments, 58242 [2018-25175]
Download as PDF
58242
Federal Register / Vol. 83, No. 223 / Monday, November 19, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14775–001]
khammond on DSK30JT082PROD with NOTICES
Marine Renewable Energy
Collaborative of New England; Notice
of Intent To File License Application,
Filing of Draft Application, Request for
Waivers of Integrated Licensing
Process Regulations Necessary for
Expedited Processing of a
Hydrokinetic Pilot Project License
Application, and Soliciting Comments
a. Type of Filing: Notice of Intent to
File a License Application for an
Original License for a Hydrokinetic Pilot
Project.
b. Project No.: 14775–001.
c. Date Filed: November 6, 2018.
d. Submitted By: Marine Renewable
Energy Collaborative of New England
(MRECo).
e. Name of Project: Bourne Tidal Test
Site.
f. Location: On the Cape Cod Canal
near the Town of Bourne, in Barnstable
County, MA.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: John Miller,
Director, Marine Renewable Energy
Collaborative of New England, P.O. Box
479, Marion, MA 02738; (508) 728–
5825.
i. FERC Contact: John Ramer at (202)
502–8969 or email at john.ramer@
ferc.gov.
j. MRECo has filed the following prefiling materials with the Commission:
(1) A notice of intent (NOI) to file an
application for an original license for a
hydrokinetic pilot project and a draft
license application with monitoring
plans; (2) a request for waivers of the
integrated licensing process regulations
necessary for expedited processing of a
hydrokinetic pilot project license
application; (3) a proposed process plan
and schedule; (4) a request to be
designated as the non-federal
representative for section 7 of the
Endangered Species Act (ESA)
consultation; and (5) a request to be
designated as the non-federal
representative for section 106
consultation under the National Historic
Preservation Act.
k. With this notice, we are soliciting
comments on the pre-filing materials
listed in paragraph j above, including
the draft license application and
monitoring plans. All comments should
also be sent to the address above in
paragraph h. In addition, all comments
VerDate Sep<11>2014
17:20 Nov 16, 2018
Jkt 247001
may be filed electronically via the
internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Any
individual or entity interested in
submitting comments on the pre-filing
materials must do so by December 20,
2018.
l. With this notice, we are approving
MRECo’s request to be designated as the
non-federal representative for section 7
of the ESA and its request to initiate
consultation under section 106 of the
National Historic Preservation Act; and
recommending that it begin informal
consultation with: (a) The U.S. Fish and
Wildlife Service and the National
Marine Fisheries Service as required by
section 7 of ESA; and (b) the
Massachusetts State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
m. With this notice, we are also
asking federal, state, local, and tribal
agencies with jurisdiction and/or
expertise with respect to environmental
issues to cooperate with us in the
preparation of the environmental
document. Agencies who would like to
request cooperating status should follow
the instructions for filing comments
described in paragraph ‘‘k’’ above.
n. This notice does not constitute the
Commission’s approval of MRECo’s
request to use the Pilot Project Licensing
Procedures. Upon its review of the
project’s overall characteristics relative
to the pilot project criteria, the draft
license application contents, and any
comments filed, the Commission will
determine whether there is adequate
information to conclude the pre-filing
process.
o. The proposed Bourne Tidal Test
Site Project would consist of: (1) An
existing turbine support platform
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
mounted on two primary pilings that are
spaced approximately 23 feet apart and
embedded to a depth of 50 feet below
the seabed, and that rise approximately
45-feet above the seabed; (2) a proposed
horizontal, axial, open-bladed turbine
having a 3-meter-diameter sweep area
and an installed capacity of 100
kilowatts (other in-stream turbinegenerators would also be tested at the
site); (3) two proposed 500-foot-long,
13.2kilovolt transmission lines
connecting the project turbine to a
battery storage cabinet and to an
interconnection with the regional grid;
and (4) appurtenant facilities. The
hydrokinetic project would have an
estimated average annual generation of
100-megawatt hours.
p. A copy of the draft license
application and all pre-filing materials
are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number (P–
14775), excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659.
q. Pre-filing process schedule. The
pre-filing process will be conducted
pursuant to the following tentative
schedule. Revisions to the schedule
below may be made based on staff’s
review of the draft application and any
comments received.
Milestone
Comments on pre-filing materials due.
Issuance of meeting
notice (if needed).
Public meeting/technical conference (if
needed).
Date
December 20, 2018.
January 5, 2019.
February 5, 2019.
r. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: November 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–25175 Filed 11–16–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 83, Number 223 (Monday, November 19, 2018)]
[Notices]
[Page 58242]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25175]
[[Page 58242]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14775-001]
Marine Renewable Energy Collaborative of New England; Notice of
Intent To File License Application, Filing of Draft Application,
Request for Waivers of Integrated Licensing Process Regulations
Necessary for Expedited Processing of a Hydrokinetic Pilot Project
License Application, and Soliciting Comments
a. Type of Filing: Notice of Intent to File a License Application
for an Original License for a Hydrokinetic Pilot Project.
b. Project No.: 14775-001.
c. Date Filed: November 6, 2018.
d. Submitted By: Marine Renewable Energy Collaborative of New
England (MRECo).
e. Name of Project: Bourne Tidal Test Site.
f. Location: On the Cape Cod Canal near the Town of Bourne, in
Barnstable County, MA.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contact: John Miller, Director, Marine Renewable
Energy Collaborative of New England, P.O. Box 479, Marion, MA 02738;
(508) 728-5825.
i. FERC Contact: John Ramer at (202) 502-8969 or email at
[email protected].
j. MRECo has filed the following pre-filing materials with the
Commission: (1) A notice of intent (NOI) to file an application for an
original license for a hydrokinetic pilot project and a draft license
application with monitoring plans; (2) a request for waivers of the
integrated licensing process regulations necessary for expedited
processing of a hydrokinetic pilot project license application; (3) a
proposed process plan and schedule; (4) a request to be designated as
the non-federal representative for section 7 of the Endangered Species
Act (ESA) consultation; and (5) a request to be designated as the non-
federal representative for section 106 consultation under the National
Historic Preservation Act.
k. With this notice, we are soliciting comments on the pre-filing
materials listed in paragraph j above, including the draft license
application and monitoring plans. All comments should also be sent to
the address above in paragraph h. In addition, all comments may be
filed electronically via the internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's website https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected] or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. Although the Commission strongly encourages electronic
filing, documents may also be paper-filed. To paper-file, mail an
original and seven copies to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426. Any individual or entity interested in submitting comments on
the pre-filing materials must do so by December 20, 2018.
l. With this notice, we are approving MRECo's request to be
designated as the non-federal representative for section 7 of the ESA
and its request to initiate consultation under section 106 of the
National Historic Preservation Act; and recommending that it begin
informal consultation with: (a) The U.S. Fish and Wildlife Service and
the National Marine Fisheries Service as required by section 7 of ESA;
and (b) the Massachusetts State Historic Preservation Officer, as
required by section 106, National Historical Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. With this notice, we are also asking federal, state, local, and
tribal agencies with jurisdiction and/or expertise with respect to
environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing comments described in
paragraph ``k'' above.
n. This notice does not constitute the Commission's approval of
MRECo's request to use the Pilot Project Licensing Procedures. Upon its
review of the project's overall characteristics relative to the pilot
project criteria, the draft license application contents, and any
comments filed, the Commission will determine whether there is adequate
information to conclude the pre-filing process.
o. The proposed Bourne Tidal Test Site Project would consist of:
(1) An existing turbine support platform mounted on two primary pilings
that are spaced approximately 23 feet apart and embedded to a depth of
50 feet below the seabed, and that rise approximately 45-feet above the
seabed; (2) a proposed horizontal, axial, open-bladed turbine having a
3-meter-diameter sweep area and an installed capacity of 100 kilowatts
(other in-stream turbine-generators would also be tested at the site);
(3) two proposed 500-foot-long, 13.2kilovolt transmission lines
connecting the project turbine to a battery storage cabinet and to an
interconnection with the regional grid; and (4) appurtenant facilities.
The hydrokinetic project would have an estimated average annual
generation of 100-megawatt hours.
p. A copy of the draft license application and all pre-filing
materials are available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website (https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket number (P-
14775), excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected] or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659.
q. Pre-filing process schedule. The pre-filing process will be
conducted pursuant to the following tentative schedule. Revisions to
the schedule below may be made based on staff's review of the draft
application and any comments received.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Comments on pre-filing materials due December 20, 2018.
Issuance of meeting notice (if January 5, 2019.
needed).
Public meeting/technical conference February 5, 2019.
(if needed).
------------------------------------------------------------------------
r. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: November 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25175 Filed 11-16-18; 8:45 am]
BILLING CODE 6717-01-P