Notice of Request Under Blanket Authorization Florida Gas Transmission Company, LLC, 57470 [2018-24887]
Download as PDF
57470
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24885 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–12–000]
khammond on DSK30JT082PROD with NOTICES
Notice of Request Under Blanket
Authorization Florida Gas
Transmission Company, LLC
Take notice that on November 1,
2018, Florida Gas Transmission
Company, LLC (FGT), 1300 Main St.,
Houston, Texas 77002, filed in Docket
No. CP19–12–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
and FGT’s blanket certificate issued in
Docket No. CP82–553–000 for
authorization of the East Louisiana
Project. FGT proposes to construct/
modify, own, and operate, certain
natural gas mainline facilities and
appurtenances at an existing compressor
station site in Perry County, Mississippi.
In addition, FGT proposes to install a
new regulator, valves, Electronic Flow
Meter and Supervisory Control and Data
Acquisition, and appurtenances, in
FGT’s permanent right of-way easement
at an existing mainline valve site in
Washington Parish, Louisiana. This
project will allow FGT to provide
additional capacity of up to 75 million
cubic feet per day of available firm
transportation service to Entergy
Louisiana, LLC in Washington Parish,
Louisiana, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main St., Houston,
Texas 77002, or via eMail to
Blair.Lichtenwalter@energytransfer.com,
or call (713) 989–2605.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24887 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–122–000.
Applicants: GridLiance High Plains
LLC.
Description: Response to October 11,
2018 Deficiency Letter of GridLiance
High Plains LLC.
Filed Date: 11/7/18.
Accession Number: 20181107–5128.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: EC19–24–000.
Applicants: Northern Iowa
Windpower LLC, Black Hills Electric
Generation, LLC, Black Hills
Corporation, Top Deer Wind Ventures,
LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Northern
Iowa Windpower LLC, et al.
Filed Date: 11/7/18.
Accession Number: 20181107–5130.
Comments Due: 5 p.m. ET 11/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–115–000.
Applicants: FL Solar 5, LLC.
Description: Supplement to October
16, 2018 FL Solar 5, LLC tariff filing.
Filed Date: 11/7/18.
Accession Number: 20181107–5140.
Comments Due: 5 p.m. ET 11/21/18.
Docket Numbers: ER19–302–000.
Applicants: NTE Southeast Electric
Company, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 1/1/2019.
Filed Date: 11/7/18.
Accession Number: 20181107–5114.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19–303–000.
Applicants: Duquesne Light
Company.
Description: Application for Incentive
Rate Treatment, et al. of Duquesne Light
Company.
Filed Date: 11/7/18.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Page 57470]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24887]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-12-000]
Notice of Request Under Blanket Authorization Florida Gas
Transmission Company, LLC
Take notice that on November 1, 2018, Florida Gas Transmission
Company, LLC (FGT), 1300 Main St., Houston, Texas 77002, filed in
Docket No. CP19-12-000 a prior notice request pursuant to sections
157.205, 157.208, and 157.210 of the Commission's regulations under the
Natural Gas Act and FGT's blanket certificate issued in Docket No.
CP82-553-000 for authorization of the East Louisiana Project. FGT
proposes to construct/modify, own, and operate, certain natural gas
mainline facilities and appurtenances at an existing compressor station
site in Perry County, Mississippi. In addition, FGT proposes to install
a new regulator, valves, Electronic Flow Meter and Supervisory Control
and Data Acquisition, and appurtenances, in FGT's permanent right of-
way easement at an existing mainline valve site in Washington Parish,
Louisiana. This project will allow FGT to provide additional capacity
of up to 75 million cubic feet per day of available firm transportation
service to Entergy Louisiana, LLC in Washington Parish, Louisiana, all
as more fully set forth in the request which is on file with the
Commission and open to public inspection.
The filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Blair Lichtenwalter, Senior Director of Certificates, Florida Gas
Transmission Company, LLC, 1300 Main St., Houston, Texas 77002, or via
eMail to [email protected], or call (713) 989-
2605.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24887 Filed 11-14-18; 8:45 am]