Notice of Availability of Draft Environmental Assessment: California Department of Water Resources, 57469-57470 [2018-24885]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Filed Date: 11/7/18.
Accession Number: 20181107–5139.
Comments Due: 5 p.m. ET 11/14/18.
Docket Numbers: RP19–256–000.
Applicants: Fayetteville Express
Pipeline LLC.
Description: eTariff filing per 1430:
FERC Form No. 501–G Report.
Filed Date: 11/8/18.
Accession Number: 20181108–5002.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–257–000.
Applicants: Southwest Gas Storage
Company.
Description: eTariff filing per 1430:
FERC Form No. 501–G Report.
Filed Date: 11/8/18.
Accession Number: 20181108–5003.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–258–000.
Applicants: Lake Charles LNG
Company, LLC.
Description: eTariff filing per 1430:
FERC Form No. 501–G Report.
Filed Date: 11/8/18.
Accession Number: 20181108–5004.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–259–000.
Applicants: Gulf States Transmission
LLC.
Description: eTariff filing per 1430:
FERC Form No. 501–G Report.
Filed Date: 11/8/18.
Accession Number: 20181108–5005.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–260–000.
Applicants: Bison Pipeline LLC.
Description: eTariff filing per 1430:
Bison Form No. 501–G Filing.
Filed Date: 11/8/18.
Accession Number: 20181108–5027.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–261–000.
Applicants: Blue Lake Gas Storage
Company.
Description: Compliance filing Blue
Lake 501–G Settlement.
Filed Date: 11/8/18.
Accession Number: 20181108–5028.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–262–000.
Applicants: Hardy Storage Company,
LLC.
Description: Compliance filing Hardy
Storage 501–G Settlement.
Filed Date: 11/8/18.
Accession Number: 20181108–5029.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–263–000.
Applicants: Black Hills Shoshone
Pipeline, LLC.
Description: eTariff filing per 1430:
BHS FERC 501–G Filing.
Filed Date: 11/8/18.
Accession Number: 20181108–5030.
Comments Due: 5 p.m. ET 11/20/18.
Docket Numbers: RP19–264–000.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Applicants: PGPipeline LLC.
Description: eTariff filing per 1430:
PGPipeline LLC FERC Form 501–G
Filing.
Filed Date: 11/8/18.
Accession Number: 20181108–5031.
Comments Due: 5 p.m. ET 11/20/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–24881 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2100–185—California]
Notice of Availability of Draft
Environmental Assessment: California
Department of Water Resources
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 Code of Federal
Regulations (CFR) Part 380, the Office of
Energy Projects has reviewed an
application filed by the California
Department of Water Resources
(California DWR), licensee for the
Feather River Hydroelectric Project, to
repair the Oroville Dam main spillway,
modify the existing emergency spillway,
and relocate a buried transmission line.
The specifications for the proposal were
filed with the Commission on January
29, 2018, and supplemented with
additional supporting information on
February 13, July 16, and August 1,
2018. The project is located on the
Feather River in Butte County,
California.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
57469
California DWR proposes to repair
and reconstruct the Lake Oroville main
spillway as a result of the failure of the
main spillway beginning on February 7,
2017. California DWR also proposes to
fortify the existing emergency spillway
located adjacent to the main spillway
and to relocate a buried transmission
line near the Hyatt Power Plant. The
proposed work would take place over
two years, with major portions of the
work at the main spillway completed on
an expedited basis prior to the
commencement of the normal wet
season on November 1, 2017. The
remainder of the work would be
completed by January 2019. Staff
prepared a draft environmental
assessment (EA), which analyzes the
potential environmental effects
associated with the reconstruction and
modification of project structures. The
draft EA also discusses the
environmental effects of California
DWR’s response to the spillway failure
and concludes that California DWR’s
proposed activities, with specified
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the draft EA is available for
review at the Commission’s Public
Reference Room or it may be viewed on
the Commission’s website at
www.ferc.gov using the eLibrary link.
Enter the docket number P–2100 in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659. All comments must be
filed by December 10, 2018.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can also submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2100–185.
For further information, contact Mr.
John Aedo at (415) 369–3335 or by
email at john.aedo@ferc.gov.
E:\FR\FM\15NON1.SGM
15NON1
57470
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24885 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–12–000]
khammond on DSK30JT082PROD with NOTICES
Notice of Request Under Blanket
Authorization Florida Gas
Transmission Company, LLC
Take notice that on November 1,
2018, Florida Gas Transmission
Company, LLC (FGT), 1300 Main St.,
Houston, Texas 77002, filed in Docket
No. CP19–12–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
and FGT’s blanket certificate issued in
Docket No. CP82–553–000 for
authorization of the East Louisiana
Project. FGT proposes to construct/
modify, own, and operate, certain
natural gas mainline facilities and
appurtenances at an existing compressor
station site in Perry County, Mississippi.
In addition, FGT proposes to install a
new regulator, valves, Electronic Flow
Meter and Supervisory Control and Data
Acquisition, and appurtenances, in
FGT’s permanent right of-way easement
at an existing mainline valve site in
Washington Parish, Louisiana. This
project will allow FGT to provide
additional capacity of up to 75 million
cubic feet per day of available firm
transportation service to Entergy
Louisiana, LLC in Washington Parish,
Louisiana, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main St., Houston,
Texas 77002, or via eMail to
Blair.Lichtenwalter@energytransfer.com,
or call (713) 989–2605.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24887 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–122–000.
Applicants: GridLiance High Plains
LLC.
Description: Response to October 11,
2018 Deficiency Letter of GridLiance
High Plains LLC.
Filed Date: 11/7/18.
Accession Number: 20181107–5128.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: EC19–24–000.
Applicants: Northern Iowa
Windpower LLC, Black Hills Electric
Generation, LLC, Black Hills
Corporation, Top Deer Wind Ventures,
LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Northern
Iowa Windpower LLC, et al.
Filed Date: 11/7/18.
Accession Number: 20181107–5130.
Comments Due: 5 p.m. ET 11/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–115–000.
Applicants: FL Solar 5, LLC.
Description: Supplement to October
16, 2018 FL Solar 5, LLC tariff filing.
Filed Date: 11/7/18.
Accession Number: 20181107–5140.
Comments Due: 5 p.m. ET 11/21/18.
Docket Numbers: ER19–302–000.
Applicants: NTE Southeast Electric
Company, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 1/1/2019.
Filed Date: 11/7/18.
Accession Number: 20181107–5114.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19–303–000.
Applicants: Duquesne Light
Company.
Description: Application for Incentive
Rate Treatment, et al. of Duquesne Light
Company.
Filed Date: 11/7/18.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Pages 57469-57470]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24885]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2100-185--California]
Notice of Availability of Draft Environmental Assessment:
California Department of Water Resources
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission or FERC's)
regulations, 18 Code of Federal Regulations (CFR) Part 380, the Office
of Energy Projects has reviewed an application filed by the California
Department of Water Resources (California DWR), licensee for the
Feather River Hydroelectric Project, to repair the Oroville Dam main
spillway, modify the existing emergency spillway, and relocate a buried
transmission line. The specifications for the proposal were filed with
the Commission on January 29, 2018, and supplemented with additional
supporting information on February 13, July 16, and August 1, 2018. The
project is located on the Feather River in Butte County, California.
California DWR proposes to repair and reconstruct the Lake Oroville
main spillway as a result of the failure of the main spillway beginning
on February 7, 2017. California DWR also proposes to fortify the
existing emergency spillway located adjacent to the main spillway and
to relocate a buried transmission line near the Hyatt Power Plant. The
proposed work would take place over two years, with major portions of
the work at the main spillway completed on an expedited basis prior to
the commencement of the normal wet season on November 1, 2017. The
remainder of the work would be completed by January 2019. Staff
prepared a draft environmental assessment (EA), which analyzes the
potential environmental effects associated with the reconstruction and
modification of project structures. The draft EA also discusses the
environmental effects of California DWR's response to the spillway
failure and concludes that California DWR's proposed activities, with
specified environmental protection measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the draft EA is available for review at the Commission's
Public Reference Room or it may be viewed on the Commission's website
at www.ferc.gov using the eLibrary link. Enter the docket number P-2100
in the docket number field to access the document. For assistance,
contact FERC Online Support at [email protected] or toll-free
at 1-866-208-3676, or for TTY, 202-502-8659. All comments must be filed
by December 10, 2018.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can also submit brief comments up
to 6,000 characters, without prior registration, using the eComment
system at https://www.ferc.gov/docs-filing/ecomment.asp. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, please send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426. The first page of any filing should include docket number P-
2100-185.
For further information, contact Mr. John Aedo at (415) 369-3335 or
by email at [email protected].
[[Page 57470]]
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24885 Filed 11-14-18; 8:45 am]
BILLING CODE 6717-01-P