Notice of Petition for Declaratory Order; Blue Marmot V LLC, Blue Marmot VI LLC, Blue Marmot VII LLC, Blue Marmot VIII LLC, and Blue Marmot IX LLC, 57471-57472 [2018-24884]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Accession Number: 20181107–5132.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19–304–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits an ECSA, Service
Agreement No. 5195 with MetEd to be
effective 1/8/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5026.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–305–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Rev
to Day-ahead Energy Mrkt Timeline
Expedited Action Shortened Comment
Period to be effective 12/31/9998.
Filed Date: 11/8/18.
Accession Number: 20181108–5032.
Comments Due: 5 p.m. ET 11/15/18.
Docket Numbers: ER19–306–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–NCEMC NITSA (SA No. 210)
Amendment to be effective 1/1/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5099.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–307–000.
Applicants: Hudson Shore Energy
Partners LLC.
Description: § 205(d) Rate Filing:
Notice of Succssion to be effective 11/
9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5111.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–308–000.
Applicants: California Independent
System Operator Corporation.
Description: Petition for Approval of
Disposition of Proceeds of Penalty
Assessments of California Independent
System Operator Corporation.
Filed Date: 11/8/18.
Accession Number: 20181108–5116.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–309–000.
Applicants: ISO New England Inc.,
NSTAR Electric Company.
Description: § 205(d) Rate Filing: ISO–
NE and NSTAR; Original Service
Agreement under Schedule 21–ES of the
OATT to be effective 1/7/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5122.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–310–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–08_SA 3200 Sholes WindMidAmerican FCA (C027) to be effective
10/25/2018.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Filed Date: 11/8/18.
Accession Number: 20181108–5124.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–311–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–08_SA 3201 Shiawassee WindMETC GIA (J602) to be effective 10/25/
2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5155.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–312–000.
Applicants: Cedar Creek Wind
Energy, LLC.
Description: § 205(d) Rate Filing:
Category 2 Notice for NW Region and
Revised Market-Based Rate Tariff to be
effective 11/9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5161.
Comments Due: 5 p.m. ET 11/29/18.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC19–1–000.
Applicants: I Squared Capital.
Description: Notification of SelfCertification of Foreign Utility Company
Status of the Ibereolica Solar
Companies.
Filed Date: 11/8/18.
Accession Number: 20181108–5081.
Comments Due: 5 p.m. ET 11/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL19–13–000; QF16–1090–
002; QF16–1091–002; QF17–475–001; QF17–
579–001; QF17–476–001]
Notice of Petition for Declaratory
Order; Blue Marmot V LLC, Blue
Marmot VI LLC, Blue Marmot VII LLC,
Blue Marmot VIII LLC, and Blue
Marmot IX LLC
Take notice that on November 7,
2018, pursuant to Rule 207 of the
Commission’s Rules of Practice and
Procedure,1 Blue Marmot V LLC, Blue
Marmot VI LLC, Blue Marmot VII LLC,
Blue Marmot VIII LLC, and Blue
Marmot IX LLC (collectively,
Petitioners) filed a petition for
declaratory order (petition) requesting
that the Commission find that
transmission congestion does not
mitigate the purchase obligation under
section 210 of the Public Utility
Regulatory Policies Act of 1978, as
amended,2 and that transmission costs
associated with the delivery of power on
the Portland General Electric Company
system are within the Commission’s
authority, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
[FR Doc. 2018–24882 Filed 11–14–18; 8:45 am]
1 18
BILLING CODE 6717–01–P
2 16
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
57471
CFR 385.207 (2017).
U.S.C. 824a–3.
E:\FR\FM\15NON1.SGM
15NON1
57472
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 7, 2018.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24884 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–302–000]
khammond on DSK30JT082PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization; NTE Southeast Electric
Company, LLC
This is a supplemental notice in the
above-referenced NTE Southeast
Electric Company, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
28, 2018.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–24883 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2804–035]
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions;
Goose River Hydro, Inc.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Application: New Minor
License.
b. Project No: 2804–035.
c. Date filed: February 2, 2018.
d. Applicant: Goose River Hydro, Inc.
e. Name of Project: Goose River
Hydroelectric Project.
f. Location: On the Goose River, in
Waldo County, Maine. No federal lands
are occupied by the project works or
located within the project boundary.
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nicholas
Cabral, Goose River Hydro, Inc., 41
Sedgewood Drive, Kennebunk, ME
04043; (207) 604–4394; or email at
gooseriverhydro@gmail.com.
i. FERC Contact: Julia Kolberg at (202)
502–8261; or email at julia.kolberg@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include the relevant docket number P–
2804–035.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The project consists of the following
existing facilities:
Swan Lake Dam
(1) A 14-foot-high, 250-foot-long rock
masonry gravity dam impounding Swan
Lake with a surface area of
approximately 1,364 acres at an
elevation of 201 feet above sea level; (2)
a concrete inlet structure; (3) three 3.5foot-high, 4-foot-wide manually
operated butterfly gates that regulate
flow through the inlet structure; (4) two
culverts that convey flow under Route
141; and (5) appurtenant facilities.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Pages 57471-57472]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24884]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL19-13-000; QF16-1090-002; QF16-1091-002; QF17-475-001;
QF17-579-001; QF17-476-001]
Notice of Petition for Declaratory Order; Blue Marmot V LLC, Blue
Marmot VI LLC, Blue Marmot VII LLC, Blue Marmot VIII LLC, and Blue
Marmot IX LLC
Take notice that on November 7, 2018, pursuant to Rule 207 of the
Commission's Rules of Practice and Procedure,\1\ Blue Marmot V LLC,
Blue Marmot VI LLC, Blue Marmot VII LLC, Blue Marmot VIII LLC, and Blue
Marmot IX LLC (collectively, Petitioners) filed a petition for
declaratory order (petition) requesting that the Commission find that
transmission congestion does not mitigate the purchase obligation under
section 210 of the Public Utility Regulatory Policies Act of 1978, as
amended,\2\ and that transmission costs associated with the delivery of
power on the Portland General Electric Company system are within the
Commission's authority, all as more fully explained in the petition.
---------------------------------------------------------------------------
\1\ 18 CFR 385.207 (2017).
\2\ 16 U.S.C. 824a-3.
---------------------------------------------------------------------------
Any person desiring to intervene or to protest in this proceeding
must file in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a notice
of intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioners.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
[[Page 57472]]
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above proceeding are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the website that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email [email protected] or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on December 7, 2018.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24884 Filed 11-14-18; 8:45 am]
BILLING CODE 6717-01-P