Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; NTE Southeast Electric Company, LLC, 57472 [2018-24883]

Download as PDF 57472 Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on December 7, 2018. Dated: November 8, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–24884 Filed 11–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–302–000] khammond on DSK30JT082PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; NTE Southeast Electric Company, LLC This is a supplemental notice in the above-referenced NTE Southeast Electric Company, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is November 28, 2018. VerDate Sep<11>2014 16:53 Nov 14, 2018 Jkt 247001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 8, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–24883 Filed 11–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2804–035] Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Goose River Hydro, Inc. Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection. a. Type of Application: New Minor License. b. Project No: 2804–035. c. Date filed: February 2, 2018. d. Applicant: Goose River Hydro, Inc. e. Name of Project: Goose River Hydroelectric Project. f. Location: On the Goose River, in Waldo County, Maine. No federal lands are occupied by the project works or located within the project boundary. PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Nicholas Cabral, Goose River Hydro, Inc., 41 Sedgewood Drive, Kennebunk, ME 04043; (207) 604–4394; or email at gooseriverhydro@gmail.com. i. FERC Contact: Julia Kolberg at (202) 502–8261; or email at julia.kolberg@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include the relevant docket number P– 2804–035. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. The project consists of the following existing facilities: Swan Lake Dam (1) A 14-foot-high, 250-foot-long rock masonry gravity dam impounding Swan Lake with a surface area of approximately 1,364 acres at an elevation of 201 feet above sea level; (2) a concrete inlet structure; (3) three 3.5foot-high, 4-foot-wide manually operated butterfly gates that regulate flow through the inlet structure; (4) two culverts that convey flow under Route 141; and (5) appurtenant facilities. E:\FR\FM\15NON1.SGM 15NON1

Agencies

[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Page 57472]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24883]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER19-302-000]


Supplemental Notice That Initial Market-Based Rate Filing 
Includes Request for Blanket Section 204 Authorization; NTE Southeast 
Electric Company, LLC

    This is a supplemental notice in the above-referenced NTE Southeast 
Electric Company, LLC's application for market-based rate authority, 
with an accompanying rate tariff, noting that such application includes 
a request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is November 28, 2018.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-24883 Filed 11-14-18; 8:45 am]
 BILLING CODE 6717-01-P