Combined Notice of Filings #1, 57470-57471 [2018-24882]
Download as PDF
57470
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24885 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–12–000]
khammond on DSK30JT082PROD with NOTICES
Notice of Request Under Blanket
Authorization Florida Gas
Transmission Company, LLC
Take notice that on November 1,
2018, Florida Gas Transmission
Company, LLC (FGT), 1300 Main St.,
Houston, Texas 77002, filed in Docket
No. CP19–12–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
and FGT’s blanket certificate issued in
Docket No. CP82–553–000 for
authorization of the East Louisiana
Project. FGT proposes to construct/
modify, own, and operate, certain
natural gas mainline facilities and
appurtenances at an existing compressor
station site in Perry County, Mississippi.
In addition, FGT proposes to install a
new regulator, valves, Electronic Flow
Meter and Supervisory Control and Data
Acquisition, and appurtenances, in
FGT’s permanent right of-way easement
at an existing mainline valve site in
Washington Parish, Louisiana. This
project will allow FGT to provide
additional capacity of up to 75 million
cubic feet per day of available firm
transportation service to Entergy
Louisiana, LLC in Washington Parish,
Louisiana, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main St., Houston,
Texas 77002, or via eMail to
Blair.Lichtenwalter@energytransfer.com,
or call (713) 989–2605.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24887 Filed 11–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–122–000.
Applicants: GridLiance High Plains
LLC.
Description: Response to October 11,
2018 Deficiency Letter of GridLiance
High Plains LLC.
Filed Date: 11/7/18.
Accession Number: 20181107–5128.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: EC19–24–000.
Applicants: Northern Iowa
Windpower LLC, Black Hills Electric
Generation, LLC, Black Hills
Corporation, Top Deer Wind Ventures,
LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Northern
Iowa Windpower LLC, et al.
Filed Date: 11/7/18.
Accession Number: 20181107–5130.
Comments Due: 5 p.m. ET 11/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–115–000.
Applicants: FL Solar 5, LLC.
Description: Supplement to October
16, 2018 FL Solar 5, LLC tariff filing.
Filed Date: 11/7/18.
Accession Number: 20181107–5140.
Comments Due: 5 p.m. ET 11/21/18.
Docket Numbers: ER19–302–000.
Applicants: NTE Southeast Electric
Company, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 1/1/2019.
Filed Date: 11/7/18.
Accession Number: 20181107–5114.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19–303–000.
Applicants: Duquesne Light
Company.
Description: Application for Incentive
Rate Treatment, et al. of Duquesne Light
Company.
Filed Date: 11/7/18.
E:\FR\FM\15NON1.SGM
15NON1
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices
Accession Number: 20181107–5132.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19–304–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits an ECSA, Service
Agreement No. 5195 with MetEd to be
effective 1/8/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5026.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–305–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Rev
to Day-ahead Energy Mrkt Timeline
Expedited Action Shortened Comment
Period to be effective 12/31/9998.
Filed Date: 11/8/18.
Accession Number: 20181108–5032.
Comments Due: 5 p.m. ET 11/15/18.
Docket Numbers: ER19–306–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–NCEMC NITSA (SA No. 210)
Amendment to be effective 1/1/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5099.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–307–000.
Applicants: Hudson Shore Energy
Partners LLC.
Description: § 205(d) Rate Filing:
Notice of Succssion to be effective 11/
9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5111.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–308–000.
Applicants: California Independent
System Operator Corporation.
Description: Petition for Approval of
Disposition of Proceeds of Penalty
Assessments of California Independent
System Operator Corporation.
Filed Date: 11/8/18.
Accession Number: 20181108–5116.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–309–000.
Applicants: ISO New England Inc.,
NSTAR Electric Company.
Description: § 205(d) Rate Filing: ISO–
NE and NSTAR; Original Service
Agreement under Schedule 21–ES of the
OATT to be effective 1/7/2019.
Filed Date: 11/8/18.
Accession Number: 20181108–5122.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–310–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–08_SA 3200 Sholes WindMidAmerican FCA (C027) to be effective
10/25/2018.
VerDate Sep<11>2014
16:53 Nov 14, 2018
Jkt 247001
Filed Date: 11/8/18.
Accession Number: 20181108–5124.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–311–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–08_SA 3201 Shiawassee WindMETC GIA (J602) to be effective 10/25/
2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5155.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19–312–000.
Applicants: Cedar Creek Wind
Energy, LLC.
Description: § 205(d) Rate Filing:
Category 2 Notice for NW Region and
Revised Market-Based Rate Tariff to be
effective 11/9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108–5161.
Comments Due: 5 p.m. ET 11/29/18.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC19–1–000.
Applicants: I Squared Capital.
Description: Notification of SelfCertification of Foreign Utility Company
Status of the Ibereolica Solar
Companies.
Filed Date: 11/8/18.
Accession Number: 20181108–5081.
Comments Due: 5 p.m. ET 11/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL19–13–000; QF16–1090–
002; QF16–1091–002; QF17–475–001; QF17–
579–001; QF17–476–001]
Notice of Petition for Declaratory
Order; Blue Marmot V LLC, Blue
Marmot VI LLC, Blue Marmot VII LLC,
Blue Marmot VIII LLC, and Blue
Marmot IX LLC
Take notice that on November 7,
2018, pursuant to Rule 207 of the
Commission’s Rules of Practice and
Procedure,1 Blue Marmot V LLC, Blue
Marmot VI LLC, Blue Marmot VII LLC,
Blue Marmot VIII LLC, and Blue
Marmot IX LLC (collectively,
Petitioners) filed a petition for
declaratory order (petition) requesting
that the Commission find that
transmission congestion does not
mitigate the purchase obligation under
section 210 of the Public Utility
Regulatory Policies Act of 1978, as
amended,2 and that transmission costs
associated with the delivery of power on
the Portland General Electric Company
system are within the Commission’s
authority, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
[FR Doc. 2018–24882 Filed 11–14–18; 8:45 am]
1 18
BILLING CODE 6717–01–P
2 16
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
57471
CFR 385.207 (2017).
U.S.C. 824a–3.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Pages 57470-57471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24882]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-122-000.
Applicants: GridLiance High Plains LLC.
Description: Response to October 11, 2018 Deficiency Letter of
GridLiance High Plains LLC.
Filed Date: 11/7/18.
Accession Number: 20181107-5128.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: EC19-24-000.
Applicants: Northern Iowa Windpower LLC, Black Hills Electric
Generation, LLC, Black Hills Corporation, Top Deer Wind Ventures, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Northern Iowa Windpower LLC, et al.
Filed Date: 11/7/18.
Accession Number: 20181107-5130.
Comments Due: 5 p.m. ET 11/28/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-115-000.
Applicants: FL Solar 5, LLC.
Description: Supplement to October 16, 2018 FL Solar 5, LLC tariff
filing.
Filed Date: 11/7/18.
Accession Number: 20181107-5140.
Comments Due: 5 p.m. ET 11/21/18.
Docket Numbers: ER19-302-000.
Applicants: NTE Southeast Electric Company, LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
1/1/2019.
Filed Date: 11/7/18.
Accession Number: 20181107-5114.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19-303-000.
Applicants: Duquesne Light Company.
Description: Application for Incentive Rate Treatment, et al. of
Duquesne Light Company.
Filed Date: 11/7/18.
[[Page 57471]]
Accession Number: 20181107-5132.
Comments Due: 5 p.m. ET 11/28/18.
Docket Numbers: ER19-304-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits an ECSA,
Service Agreement No. 5195 with MetEd to be effective 1/8/2019.
Filed Date: 11/8/18.
Accession Number: 20181108-5026.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-305-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Rev to Day-ahead Energy Mrkt
Timeline Expedited Action Shortened Comment Period to be effective 12/
31/9998.
Filed Date: 11/8/18.
Accession Number: 20181108-5032.
Comments Due: 5 p.m. ET 11/15/18.
Docket Numbers: ER19-306-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-NCEMC NITSA (SA No. 210)
Amendment to be effective 1/1/2019.
Filed Date: 11/8/18.
Accession Number: 20181108-5099.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-307-000.
Applicants: Hudson Shore Energy Partners LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succssion to be
effective 11/9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108-5111.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-308-000.
Applicants: California Independent System Operator Corporation.
Description: Petition for Approval of Disposition of Proceeds of
Penalty Assessments of California Independent System Operator
Corporation.
Filed Date: 11/8/18.
Accession Number: 20181108-5116.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-309-000.
Applicants: ISO New England Inc., NSTAR Electric Company.
Description: Sec. 205(d) Rate Filing: ISO-NE and NSTAR; Original
Service Agreement under Schedule 21-ES of the OATT to be effective 1/7/
2019.
Filed Date: 11/8/18.
Accession Number: 20181108-5122.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-310-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-08_SA 3200 Sholes
Wind-MidAmerican FCA (C027) to be effective 10/25/2018.
Filed Date: 11/8/18.
Accession Number: 20181108-5124.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-311-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-08_SA 3201
Shiawassee Wind-METC GIA (J602) to be effective 10/25/2018.
Filed Date: 11/8/18.
Accession Number: 20181108-5155.
Comments Due: 5 p.m. ET 11/29/18.
Docket Numbers: ER19-312-000.
Applicants: Cedar Creek Wind Energy, LLC.
Description: Sec. 205(d) Rate Filing: Category 2 Notice for NW
Region and Revised Market-Based Rate Tariff to be effective 11/9/2018.
Filed Date: 11/8/18.
Accession Number: 20181108-5161.
Comments Due: 5 p.m. ET 11/29/18.
Take notice that the Commission received the following foreign
utility company status filings:
Docket Numbers: FC19-1-000.
Applicants: I Squared Capital.
Description: Notification of Self-Certification of Foreign Utility
Company Status of the Ibereolica Solar Companies.
Filed Date: 11/8/18.
Accession Number: 20181108-5081.
Comments Due: 5 p.m. ET 11/29/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-24882 Filed 11-14-18; 8:45 am]
BILLING CODE 6717-01-P