Goodyear Lake Hydro, LLC; Notice of Availability of Environmental Assessment, 56315 [2018-24703]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 219 / Tuesday, November 13, 2018 / Notices
Filed Date: 11/5/18.
Accession Number: 20181105–5197.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER18–2324–000.
Applicants: NorthWestern
Corporation.
Description: Supplement (Diagram) to
August 27, 2018 Request for Limited
Waiver of Filed Tariff of NorthWestern
Corporation.
Filed Date: 11/2/18.
Accession Number: 20181102–5259.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–286–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3101R2 Heartland Consumers Power
District NITSA and NOA to be effective
4/22/2018.
Filed Date: 11/5/18.
Accession Number: 20181105–5063.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER19–287–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 5227; Queue No.
AB2–158 to be effective 10/8/2018.
Filed Date: 11/5/18.
Accession Number: 20181105–5064.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER19–288–000.
Applicants: Carson Hybrid Energy
Storage LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate to be
effective 12/1/2018.
Filed Date: 11/5/18.
Accession Number: 20181105–5076.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER19–289–000.
Applicants: Cleco Cajun LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 1/5/2019.
Filed Date: 11/5/18.
Accession Number: 20181105–5181.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER19–290–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Revisions to Appendix A to the US DOE
Berkeley Site Office IA (SA 63) to be
effective 11/6/2018.
Filed Date: 11/5/18.
Accession Number: 20181105–5198.
Comments Due: 5 p.m. ET 11/26/18.
Docket Numbers: ER19–291–000.
Applicants: ISO New England Inc.,
New England Power Pool.
Description: ISO New England Inc., et
al. submits Installed Capacity
Requirement, Hydro Quebec
Interconnection Capability Credits and
Related Values for the 2022/2023
Capacity Commitment Period.
VerDate Sep<11>2014
17:34 Nov 09, 2018
Jkt 247001
Filed Date: 11/6/18.
Accession Number: 20181106–5025.
Comments Due: 5 p.m. ET 11/27/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
56315
[Project No. 2788–017]
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2788–017.
For further information, contact Emily
Carter at (202) 502–6512 or by email at
emily.carter@ferc.gov.
Goodyear Lake Hydro, LLC; Notice of
Availability of Environmental
Assessment
Dated: November 6, 2018.
Kimberly D. Bose,
Secretary.
Dated: November 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–24671 Filed 11–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a subsequent license for
the Colliersville Hydroelectric Project,
located on the Susquehanna River, in
the Town of Milford, Otsego County,
New York, and has prepared an
Environmental Assessment (EA) for the
project.
The EA contains staff’s analysis of the
potential environmental impacts of the
project and concludes that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
[FR Doc. 2018–24703 Filed 11–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11426–000]
T.A. Keck, III and H.S. Keck; Notice of
Existing Licensee’s Failure To File a
Notice of Intent To File a Subsequent
License Application, and Soliciting
Notices of Intent To File a License
Application and Pre-Application
Documents
The current license for T.A. Keck, III
and H.S. Keck’s (the Kecks’) Blackstone
Mill Hydroelectric Project No. 11426
(Blackstone Mill Project) was issued on
November 18, 1993, for a term of 30
years, ending October 31, 2023.1 The 651 See T.A. Keck, III and H.S. Keck, 65 FERC
¶ 62,149 (1993).
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 83, Number 219 (Tuesday, November 13, 2018)]
[Notices]
[Page 56315]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24703]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2788-017]
Goodyear Lake Hydro, LLC; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a subsequent license for the Colliersville
Hydroelectric Project, located on the Susquehanna River, in the Town of
Milford, Otsego County, New York, and has prepared an Environmental
Assessment (EA) for the project.
The EA contains staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's website at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-2788-017.
For further information, contact Emily Carter at (202) 502-6512 or
by email at [email protected].
Dated: November 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24703 Filed 11-9-18; 8:45 am]
BILLING CODE 6717-01-P