Goodyear Lake Hydro, LLC; Notice of Availability of Environmental Assessment, 56315 [2018-24703]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 83, No. 219 / Tuesday, November 13, 2018 / Notices Filed Date: 11/5/18. Accession Number: 20181105–5197. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER18–2324–000. Applicants: NorthWestern Corporation. Description: Supplement (Diagram) to August 27, 2018 Request for Limited Waiver of Filed Tariff of NorthWestern Corporation. Filed Date: 11/2/18. Accession Number: 20181102–5259. Comments Due: 5 p.m. ET 11/9/18. Docket Numbers: ER19–286–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3101R2 Heartland Consumers Power District NITSA and NOA to be effective 4/22/2018. Filed Date: 11/5/18. Accession Number: 20181105–5063. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER19–287–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA SA No. 5227; Queue No. AB2–158 to be effective 10/8/2018. Filed Date: 11/5/18. Accession Number: 20181105–5064. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER19–288–000. Applicants: Carson Hybrid Energy Storage LLC. Description: Baseline eTariff Filing: Application for Market Based Rate to be effective 12/1/2018. Filed Date: 11/5/18. Accession Number: 20181105–5076. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER19–289–000. Applicants: Cleco Cajun LLC. Description: Baseline eTariff Filing: Baseline new to be effective 1/5/2019. Filed Date: 11/5/18. Accession Number: 20181105–5181. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER19–290–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Revisions to Appendix A to the US DOE Berkeley Site Office IA (SA 63) to be effective 11/6/2018. Filed Date: 11/5/18. Accession Number: 20181105–5198. Comments Due: 5 p.m. ET 11/26/18. Docket Numbers: ER19–291–000. Applicants: ISO New England Inc., New England Power Pool. Description: ISO New England Inc., et al. submits Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the 2022/2023 Capacity Commitment Period. VerDate Sep<11>2014 17:34 Nov 09, 2018 Jkt 247001 Filed Date: 11/6/18. Accession Number: 20181106–5025. Comments Due: 5 p.m. ET 11/27/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 56315 [Project No. 2788–017] Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2788–017. For further information, contact Emily Carter at (202) 502–6512 or by email at emily.carter@ferc.gov. Goodyear Lake Hydro, LLC; Notice of Availability of Environmental Assessment Dated: November 6, 2018. Kimberly D. Bose, Secretary. Dated: November 6, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–24671 Filed 11–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a subsequent license for the Colliersville Hydroelectric Project, located on the Susquehanna River, in the Town of Milford, Otsego County, New York, and has prepared an Environmental Assessment (EA) for the project. The EA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 [FR Doc. 2018–24703 Filed 11–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11426–000] T.A. Keck, III and H.S. Keck; Notice of Existing Licensee’s Failure To File a Notice of Intent To File a Subsequent License Application, and Soliciting Notices of Intent To File a License Application and Pre-Application Documents The current license for T.A. Keck, III and H.S. Keck’s (the Kecks’) Blackstone Mill Hydroelectric Project No. 11426 (Blackstone Mill Project) was issued on November 18, 1993, for a term of 30 years, ending October 31, 2023.1 The 651 See T.A. Keck, III and H.S. Keck, 65 FERC ¶ 62,149 (1993). E:\FR\FM\13NON1.SGM 13NON1

Agencies

[Federal Register Volume 83, Number 219 (Tuesday, November 13, 2018)]
[Notices]
[Page 56315]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24703]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2788-017]


Goodyear Lake Hydro, LLC; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for a subsequent license for the Colliersville 
Hydroelectric Project, located on the Susquehanna River, in the Town of 
Milford, Otsego County, New York, and has prepared an Environmental 
Assessment (EA) for the project.
    The EA contains staff's analysis of the potential environmental 
impacts of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's website at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket number P-2788-017.
    For further information, contact Emily Carter at (202) 502-6512 or 
by email at [email protected].

    Dated: November 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24703 Filed 11-9-18; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.