Combined Notice of Filings #2, 56069-56070 [2018-24535]

Download as PDF Federal Register / Vol. 83, No. 218 / Friday, November 9, 2018 / Notices characteristics. 10 CFR 430.27(k)(1). Likewise, GD Midea may request that DOE rescind or modify the waiver if GD Midea discovers an error in the information provided to DOE as part of its petition, determines that the waiver is no longer needed, or for other appropriate reasons. 10 CFR 430.27(k)(2). (6) Granting of this waiver does not release GD Midea from the certification requirements set forth at 10 CFR part 429. Signed in Washington, DC, on November 1, 2018. Kathleen B. Hogan, Deputy Assistant Secretary for Energy Efficiency, Energy Efficiency and Renewable Energy. [FR Doc. 2018–24547 Filed 11–8–18; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSK30JT082PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–16–000. Applicants: TG High Prairie, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of TG High Prairie, LLC. Filed Date: 11/2/18. Accession Number: 20181102–5067. Comments Due: 5 p.m. ET 11/23/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2551–009; ER10–1846–008; ER10–1849–014; ER10–1852–020; ER10–1855–008; ER10–1887–014; ER10–1920–016; ER10–1928–016; ER10–1952–014; ER10–1961–014; ER10–1994–008; ER10–1995–009; ER10–2720–016; ER11–2642–009; ER11–4428–016; ER11–4462–029; ER12–1228–016; ER12–1880–015; ER12–2227–014; ER12–569–015; ER12–895–014; ER13– 2474–010; ER13–712–016; ER14–2707– 011; ER14–2708–012; ER14–2709–011; ER14–2710–011; ER15–1925–008; ER15–2676–007; ER15–30–009; ER15– 58–009; ER16–1440–005; ER16–1672– 005; ER16–2190–004; ER16–2191–004; ER16–2240–005; ER16–2241–004; ER16–2275–004; ER16–2276–004; ER16–2297–004; ER16–2453–005; ER17–2152–001; ER17–838–004; ER18– 2067–001; ER18–2314–001. Applicants: Baldwin Wind, LLC, Blackwell Wind, LLC, Brady VerDate Sep<11>2014 17:36 Nov 08, 2018 Jkt 247001 Interconnection, LLC, Brady Wind, LLC, Brady Wind II, LLC, Breckinridge Wind Project, LLC, Cedar Bluff Wind, LLC, Chaves County Solar, LLC, Cimarron Wind Energy, LLC, Cottonwood Wind Project, LLC, Day County Wind, LLC, Elk City Wind, LLC, Ensign Wind, LLC, Florida Power & Light Company, FPL Energy Burleigh County Wind, LLC, FPL Energy Cowboy Wind, LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, FPL Energy South Dakota Wind, LLC, Gray County Wind Energy, LLC, High Majestic Wind Energy Center, LLC, High Majestic Wind II, LLC, Kingman Wind Energy I, LLC, Kingman Wind Energy II, LLC, Mammoth Plains Wind Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, Minco Wind Interconnection Services, LLC, Minco Wind V, LLC, Ninnescah Wind Energy, LLC, Osborn Wind Energy, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Roswell Solar, LLC, Rush Springs Wind Energy, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Seiling Wind Interconnection Services, LLC, Sholes Wind Energy, LLC, Steele Flats Wind Project, LLC, Wessington Wind Energy Center, LLC, Wilton Wind II, LLC, NEPM II, LLC, NextEra Energy Marketing, LLC. Description: Notification of NonMaterial Change in Status, et al. of NextEra Resources Entities. Filed Date: 11/1/18. Accession Number: 20181101–5228. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–256–000. Applicants: Wisconsin Power and Light Company. Description: § 205(d) Rate Filing: Wisconsin Power and Light Company Wholesale Formula Rate Changes to be effective 12/31/2018. Filed Date: 11/1/18. Accession Number: 20181101–5224. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–275–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–11–02_Q3 Clean-up Filing to be effective 1/2/2019. Filed Date: 11/2/18. Accession Number: 20181102–5079. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–277–000. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: § 205(d) Rate Filing: 2018–11–02_SA 3201 MP–GRE ICA (Brainerd) to be effective 11/3/2018. Filed Date: 11/2/18. Accession Number: 20181102–5084. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 56069 Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–278–000. Applicants: Midcontinent Independent System Operator, Inc., ALLETE, Inc. Description: § 205(d) Rate Filing: 2018–11–02_SA 3203 MP–GRE ICA (Baxter) to be effective 11/3/2018. Filed Date: 11/2/18. Accession Number: 20181102–5097. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–279–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEF–RCID NITSA–NOA Amendment (SA–147) to be effective 12/1/2018. Filed Date: 11/2/18. Accession Number: 20181102–5110. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–280–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–11–02_Revisions to Attachment FF–4 to be effective 1/2/2019. Filed Date: 11/2/18. Accession Number: 20181102–5126. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–281–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: BPA Construct Agmt for Hilltop Happy Camp to be effective 12/24/2018. Filed Date: 11/2/18. Accession Number: 20181102–5131. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–283–000. Applicants: ALLETE, Inc. Description: Initial rate filing: Reactive Power to be effective 1/1/2019. Filed Date: 11/2/18. Accession Number: 20181102–5166. Comments Due: 5 p.m. ET 11/23/18. Docket Numbers: ER19–284–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL and FKEC Amendments to Rate Schedule FERC No. 322 to be effective 4/1/2018. Filed Date: 11/2/18. Accession Number: 20181102–5170. Comments Due: 5 p.m. ET 11/23/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\09NON1.SGM 09NON1 56070 Federal Register / Vol. 83, No. 218 / Friday, November 9, 2018 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 2, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–24535 Filed 11–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–9–000] khammond on DSK30JT082PROD with NOTICES National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization Take notice that on October 26, 2018, National Fuel Gas Supply Corporation (National Fuel), 6363 Main Street, Williamsville, New York 14221, filed in Docket No. CP19–9–000 a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to abandon certain natural gas storage facilities within the Zoar Storage Field in Erie County, New York. Specifically, National Fuel requests to plug and abandon in place two active injection/ withdrawal storage wells and their associated 4-inch-diameter well lines, totaling approximately 55.5 feet in length. National Fuel states the proposed abandonments will have no impact on their existing customers or storage operations, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Alice A. Curtiss, Deputy General Counsel, National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221, by telephone at (716) 857– VerDate Sep<11>2014 17:36 Nov 08, 2018 Jkt 247001 7075, or by email at curtissa@ natfuel.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: November 26, 2018. Dated: November 5, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–24560 Filed 11–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–274–000] TG High Prairie, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced TG High Prairie, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is November 23, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 83, Number 218 (Friday, November 9, 2018)]
[Notices]
[Pages 56069-56070]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24535]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-16-000.
    Applicants: TG High Prairie, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of TG High Prairie, LLC.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5067.
    Comments Due: 5 p.m. ET 11/23/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2551-009; ER10-1846-008; ER10-1849-014; ER10-
1852-020; ER10-1855-008; ER10-1887-014; ER10-1920-016; ER10-1928-016; 
ER10-1952-014; ER10-1961-014; ER10-1994-008; ER10-1995-009; ER10-2720-
016; ER11-2642-009; ER11-4428-016; ER11-4462-029; ER12-1228-016; ER12-
1880-015; ER12-2227-014; ER12-569-015; ER12-895-014; ER13-2474-010; 
ER13-712-016; ER14-2707-011; ER14-2708-012; ER14-2709-011; ER14-2710-
011; ER15-1925-008; ER15-2676-007; ER15-30-009; ER15-58-009; ER16-1440-
005; ER16-1672-005; ER16-2190-004; ER16-2191-004; ER16-2240-005; ER16-
2241-004; ER16-2275-004; ER16-2276-004; ER16-2297-004; ER16-2453-005; 
ER17-2152-001; ER17-838-004; ER18-2067-001; ER18-2314-001.
    Applicants: Baldwin Wind, LLC, Blackwell Wind, LLC, Brady 
Interconnection, LLC, Brady Wind, LLC, Brady Wind II, LLC, Breckinridge 
Wind Project, LLC, Cedar Bluff Wind, LLC, Chaves County Solar, LLC, 
Cimarron Wind Energy, LLC, Cottonwood Wind Project, LLC, Day County 
Wind, LLC, Elk City Wind, LLC, Ensign Wind, LLC, Florida Power & Light 
Company, FPL Energy Burleigh County Wind, LLC, FPL Energy Cowboy Wind, 
LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, FPL 
Energy South Dakota Wind, LLC, Gray County Wind Energy, LLC, High 
Majestic Wind Energy Center, LLC, High Majestic Wind II, LLC, Kingman 
Wind Energy I, LLC, Kingman Wind Energy II, LLC, Mammoth Plains Wind 
Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, 
Minco Wind Interconnection Services, LLC, Minco Wind V, LLC, Ninnescah 
Wind Energy, LLC, Osborn Wind Energy, LLC, Palo Duro Wind Energy, LLC, 
Palo Duro Wind Interconnection Services, LLC, Roswell Solar, LLC, Rush 
Springs Wind Energy, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, 
Seiling Wind Interconnection Services, LLC, Sholes Wind Energy, LLC, 
Steele Flats Wind Project, LLC, Wessington Wind Energy Center, LLC, 
Wilton Wind II, LLC, NEPM II, LLC, NextEra Energy Marketing, LLC.
    Description: Notification of Non-Material Change in Status, et al. 
of NextEra Resources Entities.
    Filed Date: 11/1/18.
    Accession Number: 20181101-5228.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-256-000.
    Applicants: Wisconsin Power and Light Company.
    Description: Sec.  205(d) Rate Filing: Wisconsin Power and Light 
Company Wholesale Formula Rate Changes to be effective 12/31/2018.
    Filed Date: 11/1/18.
    Accession Number: 20181101-5224.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-275-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-02_Q3 Clean-up 
Filing to be effective 1/2/2019.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5079.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-277-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-02_SA 3201 MP-GRE 
ICA (Brainerd) to be effective 11/3/2018.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5084.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-278-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-02_SA 3203 MP-GRE 
ICA (Baxter) to be effective 11/3/2018.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5097.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-279-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF-RCID NITSA-NOA Amendment 
(SA-147) to be effective 12/1/2018.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5110.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-280-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-11-02_Revisions to 
Attachment FF-4 to be effective 1/2/2019.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5126.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-281-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: BPA Construct Agmt for 
Hilltop Happy Camp to be effective 12/24/2018.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5131.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-283-000.
    Applicants: ALLETE, Inc.
    Description: Initial rate filing: Reactive Power to be effective 1/
1/2019.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5166.
    Comments Due: 5 p.m. ET 11/23/18.

    Docket Numbers: ER19-284-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL and FKEC Amendments to 
Rate Schedule FERC No. 322 to be effective 4/1/2018.
    Filed Date: 11/2/18.
    Accession Number: 20181102-5170.
    Comments Due: 5 p.m. ET 11/23/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

[[Page 56070]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-24535 Filed 11-8-18; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.