Combined Notice of Filings #2, 56069-56070 [2018-24535]
Download as PDF
Federal Register / Vol. 83, No. 218 / Friday, November 9, 2018 / Notices
characteristics. 10 CFR 430.27(k)(1).
Likewise, GD Midea may request that
DOE rescind or modify the waiver if GD
Midea discovers an error in the
information provided to DOE as part of
its petition, determines that the waiver
is no longer needed, or for other
appropriate reasons. 10 CFR
430.27(k)(2).
(6) Granting of this waiver does not
release GD Midea from the certification
requirements set forth at 10 CFR part
429.
Signed in Washington, DC, on November 1,
2018.
Kathleen B. Hogan,
Deputy Assistant Secretary for Energy
Efficiency, Energy Efficiency and Renewable
Energy.
[FR Doc. 2018–24547 Filed 11–8–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSK30JT082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–16–000.
Applicants: TG High Prairie, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of TG High Prairie,
LLC.
Filed Date: 11/2/18.
Accession Number: 20181102–5067.
Comments Due: 5 p.m. ET 11/23/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2551–009;
ER10–1846–008; ER10–1849–014;
ER10–1852–020; ER10–1855–008;
ER10–1887–014; ER10–1920–016;
ER10–1928–016; ER10–1952–014;
ER10–1961–014; ER10–1994–008;
ER10–1995–009; ER10–2720–016;
ER11–2642–009; ER11–4428–016;
ER11–4462–029; ER12–1228–016;
ER12–1880–015; ER12–2227–014;
ER12–569–015; ER12–895–014; ER13–
2474–010; ER13–712–016; ER14–2707–
011; ER14–2708–012; ER14–2709–011;
ER14–2710–011; ER15–1925–008;
ER15–2676–007; ER15–30–009; ER15–
58–009; ER16–1440–005; ER16–1672–
005; ER16–2190–004; ER16–2191–004;
ER16–2240–005; ER16–2241–004;
ER16–2275–004; ER16–2276–004;
ER16–2297–004; ER16–2453–005;
ER17–2152–001; ER17–838–004; ER18–
2067–001; ER18–2314–001.
Applicants: Baldwin Wind, LLC,
Blackwell Wind, LLC, Brady
VerDate Sep<11>2014
17:36 Nov 08, 2018
Jkt 247001
Interconnection, LLC, Brady Wind, LLC,
Brady Wind II, LLC, Breckinridge Wind
Project, LLC, Cedar Bluff Wind, LLC,
Chaves County Solar, LLC, Cimarron
Wind Energy, LLC, Cottonwood Wind
Project, LLC, Day County Wind, LLC,
Elk City Wind, LLC, Ensign Wind, LLC,
Florida Power & Light Company, FPL
Energy Burleigh County Wind, LLC, FPL
Energy Cowboy Wind, LLC, FPL Energy
Oklahoma Wind, LLC, FPL Energy
Sooner Wind, LLC, FPL Energy South
Dakota Wind, LLC, Gray County Wind
Energy, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, Kingman Wind Energy I, LLC,
Kingman Wind Energy II, LLC,
Mammoth Plains Wind Project, LLC,
Minco Wind, LLC, Minco Wind II, LLC,
Minco Wind III, LLC, Minco Wind
Interconnection Services, LLC, Minco
Wind V, LLC, Ninnescah Wind Energy,
LLC, Osborn Wind Energy, LLC, Palo
Duro Wind Energy, LLC, Palo Duro
Wind Interconnection Services, LLC,
Roswell Solar, LLC, Rush Springs Wind
Energy, LLC, Seiling Wind, LLC, Seiling
Wind II, LLC, Seiling Wind
Interconnection Services, LLC, Sholes
Wind Energy, LLC, Steele Flats Wind
Project, LLC, Wessington Wind Energy
Center, LLC, Wilton Wind II, LLC,
NEPM II, LLC, NextEra Energy
Marketing, LLC.
Description: Notification of NonMaterial Change in Status, et al. of
NextEra Resources Entities.
Filed Date: 11/1/18.
Accession Number: 20181101–5228.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–256–000.
Applicants: Wisconsin Power and
Light Company.
Description: § 205(d) Rate Filing:
Wisconsin Power and Light Company
Wholesale Formula Rate Changes to be
effective 12/31/2018.
Filed Date: 11/1/18.
Accession Number: 20181101–5224.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–275–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–02_Q3 Clean-up Filing to be
effective 1/2/2019.
Filed Date: 11/2/18.
Accession Number: 20181102–5079.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–277–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–11–02_SA 3201 MP–GRE ICA
(Brainerd) to be effective 11/3/2018.
Filed Date: 11/2/18.
Accession Number: 20181102–5084.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
56069
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–278–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–11–02_SA 3203 MP–GRE ICA
(Baxter) to be effective 11/3/2018.
Filed Date: 11/2/18.
Accession Number: 20181102–5097.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–279–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing:
DEF–RCID NITSA–NOA Amendment
(SA–147) to be effective 12/1/2018.
Filed Date: 11/2/18.
Accession Number: 20181102–5110.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–280–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–11–02_Revisions to Attachment
FF–4 to be effective 1/2/2019.
Filed Date: 11/2/18.
Accession Number: 20181102–5126.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–281–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
Construct Agmt for Hilltop Happy Camp
to be effective 12/24/2018.
Filed Date: 11/2/18.
Accession Number: 20181102–5131.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–283–000.
Applicants: ALLETE, Inc.
Description: Initial rate filing:
Reactive Power to be effective 1/1/2019.
Filed Date: 11/2/18.
Accession Number: 20181102–5166.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19–284–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and FKEC Amendments to Rate
Schedule FERC No. 322 to be effective
4/1/2018.
Filed Date: 11/2/18.
Accession Number: 20181102–5170.
Comments Due: 5 p.m. ET 11/23/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
E:\FR\FM\09NON1.SGM
09NON1
56070
Federal Register / Vol. 83, No. 218 / Friday, November 9, 2018 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–24535 Filed 11–8–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–9–000]
khammond on DSK30JT082PROD with NOTICES
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization
Take notice that on October 26, 2018,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed in
Docket No. CP19–9–000 a prior notice
request pursuant to sections 157.205
and 157.216 of the Commission’s
regulations under the Natural Gas Act
(NGA) for authorization to abandon
certain natural gas storage facilities
within the Zoar Storage Field in Erie
County, New York. Specifically,
National Fuel requests to plug and
abandon in place two active injection/
withdrawal storage wells and their
associated 4-inch-diameter well lines,
totaling approximately 55.5 feet in
length. National Fuel states the
proposed abandonments will have no
impact on their existing customers or
storage operations, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Alice
A. Curtiss, Deputy General Counsel,
National Fuel Gas Supply Corporation,
6363 Main Street, Williamsville, New
York 14221, by telephone at (716) 857–
VerDate Sep<11>2014
17:36 Nov 08, 2018
Jkt 247001
7075, or by email at curtissa@
natfuel.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: November 26, 2018.
Dated: November 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24560 Filed 11–8–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–274–000]
TG High Prairie, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced TG High Prairie, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
23, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 83, Number 218 (Friday, November 9, 2018)]
[Notices]
[Pages 56069-56070]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-24535]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-16-000.
Applicants: TG High Prairie, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of TG High Prairie, LLC.
Filed Date: 11/2/18.
Accession Number: 20181102-5067.
Comments Due: 5 p.m. ET 11/23/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2551-009; ER10-1846-008; ER10-1849-014; ER10-
1852-020; ER10-1855-008; ER10-1887-014; ER10-1920-016; ER10-1928-016;
ER10-1952-014; ER10-1961-014; ER10-1994-008; ER10-1995-009; ER10-2720-
016; ER11-2642-009; ER11-4428-016; ER11-4462-029; ER12-1228-016; ER12-
1880-015; ER12-2227-014; ER12-569-015; ER12-895-014; ER13-2474-010;
ER13-712-016; ER14-2707-011; ER14-2708-012; ER14-2709-011; ER14-2710-
011; ER15-1925-008; ER15-2676-007; ER15-30-009; ER15-58-009; ER16-1440-
005; ER16-1672-005; ER16-2190-004; ER16-2191-004; ER16-2240-005; ER16-
2241-004; ER16-2275-004; ER16-2276-004; ER16-2297-004; ER16-2453-005;
ER17-2152-001; ER17-838-004; ER18-2067-001; ER18-2314-001.
Applicants: Baldwin Wind, LLC, Blackwell Wind, LLC, Brady
Interconnection, LLC, Brady Wind, LLC, Brady Wind II, LLC, Breckinridge
Wind Project, LLC, Cedar Bluff Wind, LLC, Chaves County Solar, LLC,
Cimarron Wind Energy, LLC, Cottonwood Wind Project, LLC, Day County
Wind, LLC, Elk City Wind, LLC, Ensign Wind, LLC, Florida Power & Light
Company, FPL Energy Burleigh County Wind, LLC, FPL Energy Cowboy Wind,
LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, FPL
Energy South Dakota Wind, LLC, Gray County Wind Energy, LLC, High
Majestic Wind Energy Center, LLC, High Majestic Wind II, LLC, Kingman
Wind Energy I, LLC, Kingman Wind Energy II, LLC, Mammoth Plains Wind
Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC,
Minco Wind Interconnection Services, LLC, Minco Wind V, LLC, Ninnescah
Wind Energy, LLC, Osborn Wind Energy, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection Services, LLC, Roswell Solar, LLC, Rush
Springs Wind Energy, LLC, Seiling Wind, LLC, Seiling Wind II, LLC,
Seiling Wind Interconnection Services, LLC, Sholes Wind Energy, LLC,
Steele Flats Wind Project, LLC, Wessington Wind Energy Center, LLC,
Wilton Wind II, LLC, NEPM II, LLC, NextEra Energy Marketing, LLC.
Description: Notification of Non-Material Change in Status, et al.
of NextEra Resources Entities.
Filed Date: 11/1/18.
Accession Number: 20181101-5228.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-256-000.
Applicants: Wisconsin Power and Light Company.
Description: Sec. 205(d) Rate Filing: Wisconsin Power and Light
Company Wholesale Formula Rate Changes to be effective 12/31/2018.
Filed Date: 11/1/18.
Accession Number: 20181101-5224.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-275-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-02_Q3 Clean-up
Filing to be effective 1/2/2019.
Filed Date: 11/2/18.
Accession Number: 20181102-5079.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-277-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-02_SA 3201 MP-GRE
ICA (Brainerd) to be effective 11/3/2018.
Filed Date: 11/2/18.
Accession Number: 20181102-5084.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-278-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-02_SA 3203 MP-GRE
ICA (Baxter) to be effective 11/3/2018.
Filed Date: 11/2/18.
Accession Number: 20181102-5097.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-279-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-RCID NITSA-NOA Amendment
(SA-147) to be effective 12/1/2018.
Filed Date: 11/2/18.
Accession Number: 20181102-5110.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-280-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-11-02_Revisions to
Attachment FF-4 to be effective 1/2/2019.
Filed Date: 11/2/18.
Accession Number: 20181102-5126.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-281-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA Construct Agmt for
Hilltop Happy Camp to be effective 12/24/2018.
Filed Date: 11/2/18.
Accession Number: 20181102-5131.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-283-000.
Applicants: ALLETE, Inc.
Description: Initial rate filing: Reactive Power to be effective 1/
1/2019.
Filed Date: 11/2/18.
Accession Number: 20181102-5166.
Comments Due: 5 p.m. ET 11/23/18.
Docket Numbers: ER19-284-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL and FKEC Amendments to
Rate Schedule FERC No. 322 to be effective 4/1/2018.
Filed Date: 11/2/18.
Accession Number: 20181102-5170.
Comments Due: 5 p.m. ET 11/23/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
[[Page 56070]]
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-24535 Filed 11-8-18; 8:45 am]
BILLING CODE 6717-01-P