Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process: Watson Associates, 55159-55160 [2018-23996]
Download as PDF
Federal Register / Vol. 83, No. 213 / Friday, November 2, 2018 / Notices
Subsidiary No. 11 LLC, Emera Energy
Services Subsidiary No. 12 LLC, Emera
Energy Services Subsidiary No. 13 LLC,
Emera Energy Services Subsidiary No.
14 LLC, Emera Energy Services
Subsidiary No. 15 LLC, NS Power
Energy Marketing Inc.
Description: Notice of Change in
Status of the Emera Entities.
Filed Date: 10/26/18.
Accession Number: 20181026–5162.
Comments Due: 5 p.m. ET 11/16/18.
Docket Numbers: ER18–1952–002.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Gulf
Power Deficiency Filing to be effective
12/31/9998. Also, on October 29, 2108
submitted Market Power Analysis (Excel
Spreadsheet).
Filed Date: 10/26/18, 10/29/18.
Accession Number: 20181026–5139;
20181029–5000.
Comments Due: 5 p.m. ET 11/13/18.
Docket Numbers: ER18–2105–001.
Applicants: Arizona Public Service
Company.
Description: Compliance filing:
Service Agreement No. 218,
Amendment No. 1 to be effective 7/1/
2018.
Filed Date: 10/26/18.
Accession Number: 20181026–5152.
Comments Due: 5 p.m. ET 11/16/18.
Docket Numbers: ER18–2412–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–10–29_SA 3164 LA3 West Baton
Rouge-Entergy Louisiana GIA (J683) Sub
Orig to be effective 8/27/2018.
Filed Date: 10/29/18.
Accession Number: 20181029–5066.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–200–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Notice of Cancellation of
the Operation and Maintenance
Agreement (Rate Schedule No. 499) of
Northern States Power Company, a
Minnesota corporation.
Filed Date: 10/26/18.
Accession Number: 20181026–5160.
Comments Due: 5 p.m. ET 11/16/18.
Docket Numbers: ER19–201–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Eight Small Generator Interconnection
Agreements of Pacific Gas and Electric
Company.
Filed Date: 10/26/18.
Accession Number: 20181026–5164.
Comments Due: 5 p.m. ET 11/16/18.
Docket Numbers: ER19–202–000.
Applicants: Southwest Power Pool,
Inc.
VerDate Sep<11>2014
17:57 Nov 01, 2018
Jkt 247001
Description: § 205(d) Rate Filing:
3434R1 East Texas Electric Cooperative
NITSA and NOA to be effective 10/1/
2018.
Filed Date: 10/29/18.
Accession Number: 20181029–5039.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–203–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3246R1 Tenaska Power and MontanaDakota Utilities Att AO to be effective
10/1/2018.
Filed Date: 10/29/18.
Accession Number: 20181029–5046.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–204–000.
Applicants: Public Service Electric
and Gas Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
PSEG submits revisions to OATT, Att.
H–10A re: Tax Cut Jobs Act to be
effective 1/1/2019.
Filed Date: 10/29/18.
Accession Number: 20181029–5054.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–205–000.
Applicants: Dearborn Industrial
Generation, L.L.C.
Description: Initial rate filing: DIG
TSA 205 Filing to be effective 12/28/
2018.
Filed Date: 10/29/18.
Accession Number: 20181029–5064.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–206–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Pinehurst Solar LGIA Filing to be
effective 10/15/2018.
Filed Date: 10/29/18.
Accession Number: 20181029–5072.
Comments Due: 5 p.m. ET 11/19/18.
Docket Numbers: ER19–207–000.
Applicants: Xcel Energy Transmission
Development Company, LLC.
Description: Request of Xcel Energy
Transmission Development Company,
LLC for Authorization to Replicate the
XETD Formula Rate and Incentives.
Filed Date: 10/26/18.
Accession Number: 20181026–5179.
Comments Due: 5 p.m. ET 11/16/18.
Docket Numbers: ER19–208–000.
Applicants: PacifiCorp.
Description: Tariff Cancellation:
Termination of Tri-State Construct Agmt
? Monolith Tap IC to be effective 1/9/
2019.
Filed Date: 10/29/18.
Accession Number: 20181029–5100.
Comments Due: 5 p.m. ET 11/19/18.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
55159
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–24025 Filed 11–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6240–063]
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process: Watson
Associates
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 6240–063.
c. Date Filed: August 27, 2018.
d. Submitted By: Watson Associates.
e. Name of Project: Watson Dam
Project.
f. Location: On the Cocheco River in
Dover, Strafford County, New
Hampshire. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: John
Webster, Watson Associates, P.O. Box
178, 10 Butler Street, South Berwick,
Maine 03908; Phone at (207) 384–5334,
or email at Hydromagnt@gwi.net.
i. FERC Contact: Amy Chang at (202)
502–8250; or amy.chang@ferc.gov.
j. Watson Associates filed its request
to use the Traditional Licensing Process
on August 27, 2018, and provided
public notice of the request on
September 19, 2018. In a letter dated
October 26, 2018, the Director of the
Division of Hydropower Licensing
E:\FR\FM\02NON1.SGM
02NON1
55160
Federal Register / Vol. 83, No. 213 / Friday, November 2, 2018 / Notices
approved Watson Associates’ request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the New Hampshire
State Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Watson Associates as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act;
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Watson Associates filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission on August 27,
2018, pursuant to 18 CFR 5.6 of the
Commission’s regulations. Watson
Associates filed a revised PAD with the
Commission on October 11, 2018.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 6240.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by August 31, 2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
VerDate Sep<11>2014
17:57 Nov 01, 2018
Jkt 247001
Dated: October 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23996 Filed 11–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14889–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications: FreedomWorks, LLC
On August 24, 2018, FreedomWorks,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Big Run Pump Storage Hydro Project to
be located near Parsons in Tucker
County, West Virginia. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 1,213 acres and
a storage capacity of 119,387 acre-feet at
a surface elevation of approximately
3,350 feet above mean sea level (msl)
created through construction of a
circular dam and/or dike; (2) a new
lower reservoir with a surface area of
1,061 acres and a storage capacity of
113,398 acre-feet at a surface elevation
of 2,250 feet msl created through
construction of a semi-circular dam; (3)
as many as four new 7,000-foot-long, 12foot-diameter penstocks connecting the
upper reservoir and lower reservoir; (4)
a new 600-foot-long, 50-foot-wide, 25foot-high powerhouse containing four
turbine-generator units with a total rated
capacity of 1,000 megawatts; (5) a new
transmission line connecting the
powerhouse to a nearby electric grid
interconnection point with options to
evaluate multiple grid interconnection
locations; and (6) appurtenant facilities.
The proposed project would have an
annual generation of 4,380,000
megawatt-hours.
Applicant Contact: Tim Williamson,
FreedomWorks, LLC, 525 Wren Lane,
Harpers Ferry, WV 25425; phone: 267–
254–6107.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14889–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14889) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–24000 Filed 11–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2100–188]
California Department of Water
Resources; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Recreation Plan to realign a recreation
trail.
b. Project No.: 2100–188.
E:\FR\FM\02NON1.SGM
02NON1
Agencies
[Federal Register Volume 83, Number 213 (Friday, November 2, 2018)]
[Notices]
[Pages 55159-55160]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6240-063]
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process: Watson Associates
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 6240-063.
c. Date Filed: August 27, 2018.
d. Submitted By: Watson Associates.
e. Name of Project: Watson Dam Project.
f. Location: On the Cocheco River in Dover, Strafford County, New
Hampshire. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Potential Applicant Contact: John Webster, Watson Associates,
P.O. Box 178, 10 Butler Street, South Berwick, Maine 03908; Phone at
(207) 384-5334, or email at [email protected].
i. FERC Contact: Amy Chang at (202) 502-8250; or
[email protected].
j. Watson Associates filed its request to use the Traditional
Licensing Process on August 27, 2018, and provided public notice of the
request on September 19, 2018. In a letter dated October 26, 2018, the
Director of the Division of Hydropower Licensing
[[Page 55160]]
approved Watson Associates' request to use the Traditional Licensing
Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New Hampshire State Historic Preservation
Officer, as required by section 106 of the National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Watson Associates as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act; and
consultation pursuant to section 106 of the National Historic
Preservation Act.
m. Watson Associates filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission on
August 27, 2018, pursuant to 18 CFR 5.6 of the Commission's
regulations. Watson Associates filed a revised PAD with the Commission
on October 11, 2018.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 6240. Pursuant to
18 CFR 16.20, each application for a subsequent license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by August 31,
2021.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: October 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-23996 Filed 11-1-18; 8:45 am]
BILLING CODE 6717-01-P