Pace Renewable Energy 1 LLC: Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 54734 [2018-23767]
Download as PDF
54734
Federal Register / Vol. 83, No. 211 / Wednesday, October 31, 2018 / Notices
Comments Due: 5 p.m. ET 11/14/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–3–000.
Applicants: New Hampshire
Transmission, LLC.
Description: Application for
Authorization of Issuance of Long-Term
Debt Securities under Section 204 of the
Federal Power Act, et al. of New
Hampshire Transmission, LLC.
Filed Date: 10/24/18.
Accession Number: 20181024–5045.
Comments Due: 5 p.m. ET 11/14/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23766 Filed 10–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–178–000]
amozie on DSK3GDR082PROD with NOTICES1
Pace Renewable Energy 1 LLC:
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
Dated: October 25, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23767 Filed 10–30–18; 8:45 am]
This is a supplemental notice in the
above-referenced proceeding of PACE
RENEWABLE ENERGY 1 LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
VerDate Sep<11>2014
18:06 Oct 30, 2018
Jkt 247001
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
14, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Filings Instituting Proceedings
Docket Numbers: RP19–115–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Direct Energy 8953561
to be effective 11/1/2018.
Filed Date: 10/24/18.
Accession Number: 20181024–5023.
Comments Due: 5 p.m. ET 11/5/18.
Docket Numbers: RP19–116–000.
Applicants: DTE Midstream
Appalachia, LLC.
Description: § 4(d) Rate Filing: Tariff
Filing in Compliance Comm Order
CP17–409 to be effective 11/30/2018.
Filed Date: 10/24/18.
Accession Number: 20181024–5130.
Comments Due: 5 p.m. ET 11/5/18.
Docket Numbers: RP19–117–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: PCB
TETLP DEC 2018 Filing to be effective
12/1/2018.
Filed Date: 10/24/18.
Accession Number: 20181024–5132.
Comments Due: 5 p.m. ET 11/5/18.
Docket Numbers: RP19–118–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Negotiated Rate AgreementCapacityRelease Macquarie to be
effective 10/24/2018.
Filed Date: 10/24/18.
Accession Number: 20181024–5146.
Comments Due: 5 p.m. ET 11/5/18.
Docket Numbers: RP19–119–000.
Applicants: Southern LNG Company,
L.L.C.
Description: § 4(d) Rate Filing: SLNG
Electric Power Cost Adjustment—2018
to be effective 12/1/2018.
Filed Date: 10/25/18.
Accession Number: 20181025–5018.
Comments Due: 5 p.m. ET 11/6/18.
Docket Numbers: RP19–120–000.
Applicants: OkTex Pipeline
Company, L.L.C.
Description: Pre-Arranged/Pre-Agreed
(Petition for Approval of Settlement)
Filing, et al. of OkTex Pipeline
Company, L.L.C. under RP19–120.
Filed Date: 10/24/18.
Accession Number: 20181024–5191.
Comments Due: 5 p.m. ET 11/5/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 83, Number 211 (Wednesday, October 31, 2018)]
[Notices]
[Page 54734]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23767]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-178-000]
Pace Renewable Energy 1 LLC: Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
PACE RENEWABLE ENERGY 1 LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is November 14, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected] or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Dated: October 25, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23767 Filed 10-30-18; 8:45 am]
BILLING CODE 6717-01-P