Notice of Request Under Blanket Authorization: Perryville Gas Storage LLC, 54340 [2018-23529]
Download as PDF
54340
Federal Register / Vol. 83, No. 209 / Monday, October 29, 2018 / Notices
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
n. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 5089.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by August 31, 2021.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23530 Filed 10–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–5–000]
amozie on DSK3GDR082PROD with NOTICES1
Notice of Request Under Blanket
Authorization: Perryville Gas Storage
LLC
Take notice that on October 5, 2018,
Perryville Gas Storage LLC (Perryville),
Three Riverway, Suite 1250, Houston,
Texas 77056, filed a prior notice
application pursuant to section 213(b) of
the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Perryville’s blanket certificate issued in
Docket No. CP09–418–000. Perryville
requests authorization to reclassify
certain quantities of working gas as base
gas at Perryville’s natural gas storage
facility in Franklin and Richland
Parishes, Louisiana, all as more fully set
forth in the application, which is open
to the public for inspection. The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
VerDate Sep<11>2014
17:48 Oct 26, 2018
Jkt 247001
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Debbie
Caperton, Director, Reservoir
Engineering and Geology, Perryville Gas
Storage Company, LLC, Three Riverway,
Suite 1250, Houston, Texas 77056, or
phone (713) 350–2529, or by email
Debbie.caperton@cardinalgs.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: October 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23529 Filed 10–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
October 23, 2018.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–13–000.
Applicants: Gateway Energy Storage,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 10/23/18.
Accession Number: 20181023–5241.
Comments Due: 5 p.m. ET 11/13/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2340–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–10–23_SA 3153 Crescent WindMETC GIA (J538) Substitute Original to
be effective 8/15/2018.
Filed Date: 10/23/18.
Accession Number: 20181023–5064.
Comments Due: 5 p.m. ET 11/13/18.
Docket Numbers: ER19–156–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing: DEP
As-Available Capacity Agreement
Concurrence Filing to be effective 12/
22/2018.
Filed Date: 10/22/18.
E:\FR\FM\29OCN1.SGM
29OCN1
Agencies
[Federal Register Volume 83, Number 209 (Monday, October 29, 2018)]
[Notices]
[Page 54340]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23529]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-5-000]
Notice of Request Under Blanket Authorization: Perryville Gas
Storage LLC
Take notice that on October 5, 2018, Perryville Gas Storage LLC
(Perryville), Three Riverway, Suite 1250, Houston, Texas 77056, filed a
prior notice application pursuant to section 213(b) of the Federal
Energy Regulatory Commission's (Commission) regulations under the
Natural Gas Act (NGA), and Perryville's blanket certificate issued in
Docket No. CP09-418-000. Perryville requests authorization to
reclassify certain quantities of working gas as base gas at
Perryville's natural gas storage facility in Franklin and Richland
Parishes, Louisiana, all as more fully set forth in the application,
which is open to the public for inspection. The filing may also be
viewed on the web at https://www.ferc.gov using the ``eLibrary'' link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Debbie Caperton, Director, Reservoir Engineering and Geology,
Perryville Gas Storage Company, LLC, Three Riverway, Suite 1250,
Houston, Texas 77056, or phone (713) 350-2529, or by email
[email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: October 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23529 Filed 10-26-18; 8:45 am]
BILLING CODE 6717-01-P