Combined Notice of Filings, 54101-54102 [2018-23443]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 208 / Friday, October 26, 2018 / Notices
Description: § 205(d) Rate Filing:
Second Revised ISA, SA No. 1127;
Queue No. AD1–099 to be effective
9/20/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5128.
Comments Due: 5 p.m. ET 11/8/18.
Docket Numbers: ER19–144–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–10–19_SA 3188 MP–GRE T–L IA
(Motley) to be effective 10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5042.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–145–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2018–10–19_SA 3189 MP–GRE T–L IA
(Bear Creek) to be effective 10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5093.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–146–000.
Applicants: NSTAR Electric
Company.
Description: Initial rate filing:
NSTAR–HQUS Transfer Agreement
(ENE Use Rights) to be effective
11/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5122.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–147–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIAs
and Distribution Service Agmts Hecate
Energy Johanna Facility LLC to be
effective 10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5134.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–148–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIAs
and Distribution Service Agmts
Convergent Energy and Power LP to be
effective 10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5137.
Comments Due: 5 p.m. ET 11/9/18.
Docket Numbers: ER19–149–000.
Applicants: New York State Electric &
Gas Corporation.
Description: § 205(d) Rate Filing:
NYSEG–DCEC Attachment C Annual
Update to be effective 1/1/2019.
Filed Date: 10/19/18.
Accession Number: 20181019–5155.
Comments Due: 5 p.m. ET 11/9/18.
The filings are accessible in the
Commission’s eLibrary system by
VerDate Sep<11>2014
18:32 Oct 25, 2018
Jkt 247001
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23439 Filed 10–25–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19–6–000.
Applicants: Natural Gas Pipeline
Company of America LLC and Kinder
Morgan Illinois Pipeline LLC.
Description: Joint Application of
Natural Gas Pipeline Company of
America LLC and Kinder Morgan
Illinois Pipeline LLC for Certificate and
Abandonment Authorization under
CP19–6.
Filed Date: 10/12/18.
Accession Number: 20181012–5227.
Comments Due: 5 p.m. ET 11/2/18.
Docket Numbers: RP15–904–001.
Applicants: Gas Transmission
Northwest LLC.
Description: Pre-Arranged/Pre-Agreed
(Amended Stipulation and Agreement
of Settlement) Filing of Gas
Transmission Northwest LLC under
RP15–904.
Filed Date: 10/16/18.
Accession Number: 20181016–5172.
Comments Due: 5 p.m. ET 10/29/18.
Docket Numbers: RP19–94–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Keyspan to Brooklyn
797626 to be effective 11/1/2018.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
54101
Filed Date: 10/18/18.
Accession Number: 20181018–5020.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–95–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing 10/18/18 to be effective
12/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5021.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–96–000.
Applicants: Centra Pipelines
Minnesota Inc.
Description: § 4(d) Rate Filing:
Updated Shipper Index December 2018
to be effective 12/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5029.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–97–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–10–18 Encana to be effective
10/18/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5063.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–98–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Spotlight 911548 to be
effective 11/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5083.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–99–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—EQT Energy 911235 to
be effective 11/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018–5093.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19–100–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—ConEd to High Rise
797652 eff 10–20–18 to be effective
10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5013.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–101–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing STEP
Project (CP15–499) In-Service
Compliance Filing to be effective
12/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5032.
E:\FR\FM\26OCN1.SGM
26OCN1
khammond on DSK30JT082PROD with NOTICES
54102
Federal Register / Vol. 83, No. 208 / Friday, October 26, 2018 / Notices
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–102–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate EQT to Colonial
8953383 to be effective 11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5057.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–103–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Volume No. 2 Bay State Gas Company
d/b/a Columbia Gas of Massachusetts
SP330904 to be effective 11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5068.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–104–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—ConEd to High Rise
797663 to be effective 10/21/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5128.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–105–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Sempra Deal IDs
951842 and 951848 to be effective
11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5154.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–106–000.
Applicants: Northwest Pipeline LLC.
Description: eTariff filing per 1430:
Petition for a waiver of the requirement
to file FERC Form No. 501–G.
Filed Date: 10/19/18.
Accession Number: 20181019–5160.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19–107–000.
Applicants: Spire Storage West LLC.
Description: § 4(d) Rate Filing: Spire
Storage West LLC—Modification of
Creditworthiness Provisions to be
effective 11/19/2018.
Filed Date: 10/19/18.
Accession Number: 20181019–5185.
Comments Due: 5 p.m. ET 10/31/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
VerDate Sep<11>2014
18:32 Oct 25, 2018
Jkt 247001
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23443 Filed 10–25–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–3–000]
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on October 9, 2018,
Gulf South Pipeline Company, LP (Gulf
South), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) and the
Federal Energy Regulatory
Commission’s (Commission) regulations
seeking authorization to construct,
operate, and maintain two new electricdriven 5,000 horsepower compressor
units, within the existing Petal III
Compressor Station (Petal III CS)
building, associated with the Petal Gas
Storage facility in Forrest County,
Mississippi (Petal III Compression
Project). Gulf South also proposes to
add a dehydration unit, thermal
oxidizer, and other auxiliary,
appurtenant facilities which would be
all located adjacent to the Petal III CS.
The Petal III Compression Project would
allow Gulf South to (i) increase the
injection capability to 1,738 million
cubic feet per day (MMcf/d); and (ii)
decrease the certificated withdrawal
capability to 2,495 MMcf/d., all as more
fully described in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Juan
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Eligio Jr., Supervisor of Regulatory
Affairs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046; by telephone at
(713) 479–3480 or by email at
juan.eligio@bwpmlp.com or Payton
Barrientos, Senior Regulatory Analyst,
Gulf South Pipeline Company, LP, 9
Greenway Plaza, Suite 2800, Houston,
Texas, 77046; by telephone at (713)
479–8157 or by email at
payton.barrientos@bwpmlp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
E:\FR\FM\26OCN1.SGM
26OCN1
Agencies
[Federal Register Volume 83, Number 208 (Friday, October 26, 2018)]
[Notices]
[Pages 54101-54102]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23443]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19-6-000.
Applicants: Natural Gas Pipeline Company of America LLC and Kinder
Morgan Illinois Pipeline LLC.
Description: Joint Application of Natural Gas Pipeline Company of
America LLC and Kinder Morgan Illinois Pipeline LLC for Certificate and
Abandonment Authorization under CP19-6.
Filed Date: 10/12/18.
Accession Number: 20181012-5227.
Comments Due: 5 p.m. ET 11/2/18.
Docket Numbers: RP15-904-001.
Applicants: Gas Transmission Northwest LLC.
Description: Pre-Arranged/Pre-Agreed (Amended Stipulation and
Agreement of Settlement) Filing of Gas Transmission Northwest LLC under
RP15-904.
Filed Date: 10/16/18.
Accession Number: 20181016-5172.
Comments Due: 5 p.m. ET 10/29/18.
Docket Numbers: RP19-94-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--Keyspan to
Brooklyn 797626 to be effective 11/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5020.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-95-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Fuel Tracker Filing 10/18/18
to be effective 12/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5021.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-96-000.
Applicants: Centra Pipelines Minnesota Inc.
Description: Sec. 4(d) Rate Filing: Updated Shipper Index December
2018 to be effective 12/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5029.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-97-000.
Applicants: Rockies Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Neg Rate 2018-10-18 Encana to
be effective 10/18/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5063.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-98-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--Spotlight
911548 to be effective 11/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5083.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-99-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--EQT Energy
911235 to be effective 11/1/2018.
Filed Date: 10/18/18.
Accession Number: 20181018-5093.
Comments Due: 5 p.m. ET 10/30/18.
Docket Numbers: RP19-100-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--ConEd to High
Rise 797652 eff 10-20-18 to be effective 10/20/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5013.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-101-000.
Applicants: Texas Eastern Transmission, LP.
Description: Compliance filing STEP Project (CP15-499) In-Service
Compliance Filing to be effective 12/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5032.
[[Page 54102]]
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-102-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rate EQT to
Colonial 8953383 to be effective 11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5057.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-103-000.
Applicants: Tennessee Gas Pipeline Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Volume No. 2 Bay State Gas
Company d/b/a Columbia Gas of Massachusetts SP330904 to be effective
11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5068.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-104-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--ConEd to High
Rise 797663 to be effective 10/21/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5128.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-105-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--Sempra Deal
IDs 951842 and 951848 to be effective 11/1/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5154.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-106-000.
Applicants: Northwest Pipeline LLC.
Description: eTariff filing per 1430: Petition for a waiver of the
requirement to file FERC Form No. 501-G.
Filed Date: 10/19/18.
Accession Number: 20181019-5160.
Comments Due: 5 p.m. ET 10/31/18.
Docket Numbers: RP19-107-000.
Applicants: Spire Storage West LLC.
Description: Sec. 4(d) Rate Filing: Spire Storage West LLC--
Modification of Creditworthiness Provisions to be effective 11/19/2018.
Filed Date: 10/19/18.
Accession Number: 20181019-5185.
Comments Due: 5 p.m. ET 10/31/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23443 Filed 10-25-18; 8:45 am]
BILLING CODE 6717-01-P