Combined Notice of Filings #1, 54103-54104 [2018-23441]

Download as PDF Federal Register / Vol. 83, No. 208 / Friday, October 26, 2018 / Notices khammond on DSK30JT082PROD with NOTICES to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-oftime, the movant is required to ‘‘show good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on November 9, 2018. Dated: October 19, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–23440 Filed 10–25–18; 8:45 am] BILLING CODE 6717–01–P 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶61,167 at ¶50 (2018). 2 18 CFR 385.214(d)(1). VerDate Sep<11>2014 18:32 Oct 25, 2018 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14883–000] Tenn-Tom Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 5, 2018, Tenn-Tom Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Aberdeen Hydropower Project (Aberdeen Project or project) to be located at the U.S. Army Corps of Engineers’ (Corps) Aberdeen Lock and Dam on the Tennessee-Tombigbee Waterway, in Monroe County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A cylindrical intake structure in each of the three existing gated spillways sections, on the eastern end of the dam; (2) four proprietary shaped penstocks with run underneath each of the existing three Corps’ spillway gates; (3) four submerged generating units, below each spillway section for a total of twelve units, with a total combined capacity of 4.8 megawatts; (4) a 50-foot-long, 50-footwide control building with switchyard on the dam’s east abutment; (5) a 0.8 mile-long transmission line. The proposed project would have an estimated average annual generation of 32,000 megawatt-hours, and operate run-of-river utilizing surplus water from the Aberdeen Lock & Dam, as directed by the Corps. Applicant Contact: Mr. Jeremy Wells, Wells Engineering, LLC, 101 Yearwood Drive, Macon, Georgia 31206; phone: (478) 238–3054. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ferc.gov Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 54103 The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14883–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14883) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 19, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–23442 Filed 10–25–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–14–000. Applicants: Fawkes Holdings, LLC, Wheelabrator Technologies Inc. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Wheelabrator Technologies Inc., et al. Filed Date: 10/19/18. Accession Number: 20181019–5233. Comments Due: 5 p.m. ET 11/9/18. Docket Numbers: EC19–15–000. Applicants: Bishop Hill Energy III LLC, Bishop Hill Interconnection LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Bishop Hill Energy III LLC, et al. Filed Date: 10/19/18. Accession Number: 20181019–5235. Comments Due: 5 p.m. ET 11/9/18. E:\FR\FM\26OCN1.SGM 26OCN1 khammond on DSK30JT082PROD with NOTICES 54104 Federal Register / Vol. 83, No. 208 / Friday, October 26, 2018 / Notices Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–1609–002. Applicants: ID SOLAR 1, LLC. Description: Compliance filing: ID Solar 1 Notice of Change in Status to be effective 10/23/2018. Filed Date: 10/22/18. Accession Number: 20181022–5097. Comments Due: 5 p.m. ET 11/13/18. Docket Numbers: ER18–2339–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–10–22_SA 3152 Polaris Wind Energy-METC GIA (J533) Substitute Original to be effective 8/15/2018. Filed Date: 10/22/18. Accession Number: 20181022–5077. Comments Due: 5 p.m. ET 11/13/18. Docket Numbers: ER19–150–000. Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: Concurrence filing for Prairie Wind Remote LBA Gen. Interchange Agt. to be effective 10/15/2018. Filed Date: 10/19/18. Accession Number: 20181019–5157. Comments Due: 5 p.m. ET 11/9/18. Docket Numbers: ER19–151–000. Applicants: MATL LLP. Description: § 205(d) Rate Filing: Open Solicitation Filing to be effective 10/23/2018. Filed Date: 10/22/18. Accession Number: 20181022–5039. Comments Due: 5 p.m. ET 11/13/18. Docket Numbers: ER19–152–000. Applicants: Arizona Public Service Company. Description: Notice of Cancellation of Transmission Service Agreement No. 132 of Arizona Public Service Company. Filed Date: 10/19/18. Accession Number: 20181019–5239. Comments Due: 5 p.m. ET 11/9/18. Docket Numbers: ER19–153–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Cooperative Energy NITSA Amendment (Remove West Hattiesburg DP) to be effective 10/1/2018. Filed Date: 10/22/18. Accession Number: 20181022–5136. Comments Due: 5 p.m. ET 11/13/18. Docket Numbers: ER19–154–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Agreement for Interconnection of the Harry Allen to Eldorado 500kV Line to be effective 10/23/2018. Filed Date: 10/22/18. Accession Number: 20181022–5137. VerDate Sep<11>2014 18:32 Oct 25, 2018 Jkt 247001 Comments Due: 5 p.m. ET 11/13/18. Docket Numbers: ER19–155–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC–DEP As-Available Capacity Agreement to be effective 12/22/2018. Filed Date: 10/22/18. Accession Number: 20181022–5144. Comments Due: 5 p.m. ET 11/13/18. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF19–129–000. Applicants: Flint Hills Resources Pine Bend, LLC. Description: Form 556 of Flint Hills Resources Pine Bend, LLC. Filed Date: 10/12/18. Accession Number: 20181012–5240. Comments Due: None-Applicable. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 22, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–23441 Filed 10–25–18; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2017–0619; FRL–9983–97– OEI] Agency Information Collection Activities; Submitted to OMB for Review and Approval; Comment Request; Pesticide Program Public Sector Collections (FIFRA Sections 18 & 24(c)) (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted the SUMMARY: PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 following information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (PRA): Pesticide Program Public Sector Collections (FIFRA Sections 18 & 24(c)) (EPA ICR Number 2311.03 and OMB Control Number 2070–0182). The ICR, which is available in the docket along with other related materials, provides a detailed explanation of the collection activities and the burden estimate that is only briefly summarized in this document. This is a request to renew the approval of an existing ICR, which is currently approved through October 31, 2018. EPA did not receive any comments in response to the previously provided public review opportunity issued in the Federal Register on May 18, 2018. With this submission, EPA is providing an additional 30 days for public review. DATES: Comments must be received on or before November 26, 2018. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2017–0619, to both EPA and OMB as follows: • To EPA online using https:// www.regulations.gov (our preferred method) or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460. • To OMB via email to oira_ submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. Do not submit electronically any information you consider to be CBI or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Connie Hernandez, Field and External Affairs Division (7506P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460–0001; telephone number: (703) 305–5190; email address: Hernandez.Connie@ epa.gov. SUPPLEMENTARY INFORMATION: Docket: Supporting documents, including the ICR that explains in detail the information collection activities and the related burden and cost estimates that are summarized in this document, are available in the docket for this ICR. The docket can be viewed online at E:\FR\FM\26OCN1.SGM 26OCN1

Agencies

[Federal Register Volume 83, Number 208 (Friday, October 26, 2018)]
[Notices]
[Pages 54103-54104]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23441]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-14-000.
    Applicants: Fawkes Holdings, LLC, Wheelabrator Technologies Inc.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Wheelabrator Technologies Inc., et 
al.
    Filed Date: 10/19/18.
    Accession Number: 20181019-5233.
    Comments Due: 5 p.m. ET 11/9/18.

    Docket Numbers: EC19-15-000.
    Applicants: Bishop Hill Energy III LLC, Bishop Hill Interconnection 
LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Bishop Hill Energy III LLC, et al.
    Filed Date: 10/19/18.
    Accession Number: 20181019-5235.
    Comments Due: 5 p.m. ET 11/9/18.


[[Page 54104]]


    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER16-1609-002.
    Applicants: ID SOLAR 1, LLC.
    Description: Compliance filing: ID Solar 1 Notice of Change in 
Status to be effective 10/23/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5097.
    Comments Due: 5 p.m. ET 11/13/18.

    Docket Numbers: ER18-2339-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2018-10-22_SA 3152 Polaris Wind 
Energy-METC GIA (J533) Substitute Original to be effective 8/15/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5077.
    Comments Due: 5 p.m. ET 11/13/18.

    Docket Numbers: ER19-150-000.
    Applicants: MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: Concurrence filing for 
Prairie Wind Remote LBA Gen. Interchange Agt. to be effective 10/15/
2018.
    Filed Date: 10/19/18.
    Accession Number: 20181019-5157.
    Comments Due: 5 p.m. ET 11/9/18.

    Docket Numbers: ER19-151-000.
    Applicants: MATL LLP.
    Description: Sec.  205(d) Rate Filing: Open Solicitation Filing to 
be effective 10/23/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5039.
    Comments Due: 5 p.m. ET 11/13/18.

    Docket Numbers: ER19-152-000.
    Applicants: Arizona Public Service Company.
    Description: Notice of Cancellation of Transmission Service 
Agreement No. 132 of Arizona Public Service Company.
    Filed Date: 10/19/18.
    Accession Number: 20181019-5239.
    Comments Due: 5 p.m. ET 11/9/18.

    Docket Numbers: ER19-153-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Cooperative Energy NITSA 
Amendment (Remove West Hattiesburg DP) to be effective 10/1/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5136.
    Comments Due: 5 p.m. ET 11/13/18.

    Docket Numbers: ER19-154-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Agreement for 
Interconnection of the Harry Allen to Eldorado 500kV Line to be 
effective 10/23/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5137.
    Comments Due: 5 p.m. ET 11/13/18.

    Docket Numbers: ER19-155-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-DEP As-Available 
Capacity Agreement to be effective 12/22/2018.
    Filed Date: 10/22/18.
    Accession Number: 20181022-5144.
    Comments Due: 5 p.m. ET 11/13/18.

    Take notice that the Commission received the following qualifying 
facility filings:
    Docket Numbers: QF19-129-000.
    Applicants: Flint Hills Resources Pine Bend, LLC.
    Description: Form 556 of Flint Hills Resources Pine Bend, LLC.
    Filed Date: 10/12/18.
    Accession Number: 20181012-5240.
    Comments Due: None-Applicable.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23441 Filed 10-25-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.