Shell Energy North America (US), LP; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions, 53630-53631 [2018-23214]
Download as PDF
53630
Federal Register / Vol. 83, No. 206 / Wednesday, October 24, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14795–002]
Shell Energy North America (US), LP;
Notice of Application Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations, Terms
and Conditions, and Fishway
Prescriptions
amozie on DSK3GDR082PROD with NOTICES1
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original major
license.
b. Project No.: 14795–002.
c. Date Filed: November 1, 2017.
d. Applicant: Shell Energy North
America (US), L.P.
e. Name of Project: Hydro Battery
Pearl Hill Pumped Storage Project.
f. Location: On the Columbia River
and Rufus Woods Lake, near Bridgeport,
Douglas County, Washington. The
project would be located on state lands
except for the lower reservoir and power
generation and pumping equipment
which would be located on Rufus
Woods Lake, a reservoir operated by the
U.S. Army Corps of Engineers (Corps).
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Kent Watt,
Shell US Hosting Company, Shell
Woodcreek Office, 150 North Dairy
Ashford, Houston, TX 77079, (832) 337–
1160, kent.watt@shell.com.
i. FERC Contact: Ryan Hansen at (202)
502–8074 or ryan.hansen@ferc.gov.
j. Deadline for Filing Comments,
Recommendations, Terms and
Conditions, and Prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and fishway prescriptions
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14795–002.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The proposed project would utilize
the Corps’ existing Rufus Woods Lake
Reservoir and would consist of the
following new facilities: (1) A 300-footdiameter, 20-foot-tall lined corrugated
steel tank upper reservoir with storage
capacity of 26.5 acre-feet; (2) a 3-footdiameter, 3,400-foot-long above-ground
carbon steel penstock transitioning to a
3-foot-diameter, 2,700-foot-long buried
carbon steel penstock; (3) a 77-foot-long,
77-foot-wide structural steel power
platform housing five 2,400 horsepower
vertical turbine pumps, one 5-megawatt
twin-jet Pelton turbine and synchronous
generator, and accompanying electrical
equipment; (4) five vertical turbine
pump intakes, each fitted with a 27inch-diameter by 94-inch-long T-style
fish screen; (5) a 2,500-foot-long, 24.9kilovolt buried/affixed transmission line
interconnecting to an existing nonproject transmission line; (6)
approximately 3,847 feet of gravel
project access road; and (7) appurtenant
facilities. The average annual generation
is estimated to be 24 gigawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ........................
Commission issues draft Environmental Analysis (EA) ...................................................................................................................
Comments on draft EA .....................................................................................................................................................................
Commission issues final EA .............................................................................................................................................................
December 2018.
June 2019.
August 2019.
November 2019.
VerDate Sep<11>2014
17:43 Oct 23, 2018
Jkt 247001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 83, No. 206 / Wednesday, October 24, 2018 / Notices
Dated: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2018–23214 Filed 10–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–135–000]
amozie on DSK3GDR082PROD with NOTICES1
Peony Solar LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Peony
Solar LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 7,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
VerDate Sep<11>2014
17:43 Oct 23, 2018
Jkt 247001
Dated: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23212 Filed 10–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14276–014]
FFP Project 92, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-capacity
amendment of license.
b. Project No.: 14276–014.
c. Date Filed: October 2, 2018.
d. Applicant: Rye Development, on
behalf of FFP Project 92, LLC.
e. Name of Project: Kentucky River
Lock and Dam No. 11 Hydroelectric
Project.
f. Location: At the Kentucky River
Authority’s Lock and Dam No. 11 on the
Kentucky River, near the Town of Waco
in Madison and Estill counties,
Kentucky.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Paul Jacob,
Rye Development, 745 Atlantic Avenue,
8th Floor, Boston, MA 02111, (617) 701–
3288, paul@ryedevelopment.com.
i. FERC Contact: Mr. Jeremy Jessup,
(202) 502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
53631
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14276–014.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The
applicant proposes to update the project
design to correspond to changes
resulting from engineering development
since license issuance. The new design
is more economical to construct and
eliminates removing the landward lock
wall, which was objected to by the
Kentucky River Authority. The licensee
proposes to reduce the size of the
powerhouse, intake structure, and
tailrace to fit completely inside the lock
chamber. In addition, the licensee is
proposing to change from two 2.5megawatt (MW) horizontal pit Kaplan
turbine generators to five 528-kilowatt
Flygt submersible turbine-generator
units. The authorized installed capacity
will reduce from 5 MW to 2.64 MW, and
the maximum total hydraulic capacity
will decrease from 4,000 cubic feet per
second (cfs) to 2,250 cfs. Lastly, the
licensee proposes to add a control
building located at the right abutment
adjacent to the existing concrete
esplanade. The proposed amendment
will not change the approved run-ofriver operation mode of the project or
the approved project boundary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs- filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 83, Number 206 (Wednesday, October 24, 2018)]
[Notices]
[Pages 53630-53631]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23214]
[[Page 53630]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14795-002]
Shell Energy North America (US), LP; Notice of Application Ready
for Environmental Analysis, and Soliciting Comments, Recommendations,
Terms and Conditions, and Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original major license.
b. Project No.: 14795-002.
c. Date Filed: November 1, 2017.
d. Applicant: Shell Energy North America (US), L.P.
e. Name of Project: Hydro Battery Pearl Hill Pumped Storage
Project.
f. Location: On the Columbia River and Rufus Woods Lake, near
Bridgeport, Douglas County, Washington. The project would be located on
state lands except for the lower reservoir and power generation and
pumping equipment which would be located on Rufus Woods Lake, a
reservoir operated by the U.S. Army Corps of Engineers (Corps).
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Kent Watt, Shell US Hosting Company, Shell
Woodcreek Office, 150 North Dairy Ashford, Houston, TX 77079, (832)
337-1160, [email protected].
i. FERC Contact: Ryan Hansen at (202) 502-8074 or
[email protected].
j. Deadline for Filing Comments, Recommendations, Terms and
Conditions, and Prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and fishway
prescriptions using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14795-002.
k. This application has been accepted and is now ready for
environmental analysis.
l. The proposed project would utilize the Corps' existing Rufus
Woods Lake Reservoir and would consist of the following new facilities:
(1) A 300-foot-diameter, 20-foot-tall lined corrugated steel tank upper
reservoir with storage capacity of 26.5 acre-feet; (2) a 3-foot-
diameter, 3,400-foot-long above-ground carbon steel penstock
transitioning to a 3-foot-diameter, 2,700-foot-long buried carbon steel
penstock; (3) a 77-foot-long, 77-foot-wide structural steel power
platform housing five 2,400 horsepower vertical turbine pumps, one 5-
megawatt twin-jet Pelton turbine and synchronous generator, and
accompanying electrical equipment; (4) five vertical turbine pump
intakes, each fitted with a 27-inch-diameter by 94-inch-long T-style
fish screen; (5) a 2,500-foot-long, 24.9-kilovolt buried/affixed
transmission line interconnecting to an existing non-project
transmission line; (6) approximately 3,847 feet of gravel project
access road; and (7) appurtenant facilities. The average annual
generation is estimated to be 24 gigawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
o. Procedural Schedule: The application will be processed according
to the following revised Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of comments, recommendations, December 2018.
preliminary terms and conditions, and
preliminary fishway prescriptions.
Commission issues draft Environmental June 2019.
Analysis (EA).
Comments on draft EA......................... August 2019.
Commission issues final EA................... November 2019.
------------------------------------------------------------------------
[[Page 53631]]
Dated: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23214 Filed 10-23-18; 8:45 am]
BILLING CODE 6717-01-P