Download as PDF 53470 Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices justification by reference to factors set forth in Rule 214(d)(1) (18 CFR 385.214(d)(1)) of the Commission’s Rules and Regulations. The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on November 7, 2018. Dated: October 17, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–23115 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11845–001] Notice of Transfer of Exemption; The Harrisburg Authority, Capital Region Water khammond on DSK30JT082PROD with NOTICES October 17, 2018. 1. By letter filed October 1, 2018, The Harrisburg Authority informed the Commission that the exemption from licensing for the Harrisburg Water Supply Project No. 11845, originally issued September 12, 2000 1 has been transferred from The Harrisburg Authority to Capital Region Water. The project pipe runs between the DeHart Reservoir and the Harrisburg water treatment plant in Daupin County, Pennsylvania. The transfer of an exemption does not require Commission approval. 2. Capital Region Water is now the exemptee of the Harrisburg Water Supply Project No. 11845. All correspondence should be forwarded to: Mr. Michael McFadden, Director of Water Operations, Capital Region Water, 100 Pine Drive, Harrisburg, PA 17103, Phone: 888–510–0606, Email: michael.mcfadden@ capitalwaterregion.com and Ms. Tanya Dierolf, Manager of Sustainability & Strategic Projects, Capital Water Region, 212 Locust Street, Suite 500, Harrisburg, PA 17101, Phone: 888–510–0606, Email: tanya.dierolf@capitalregionswater.com. 1 Order Granting Exemption From Licensing (Conduit). The Harrisburg Authority, 92 FERC ¶ 62,212 (2000). VerDate Sep<11>2014 20:20 Oct 22, 2018 Jkt 247001 Dated: October 17, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–23118 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–13–000. Applicants: AltaGas Renewable Energy Colorado LLC, Black Hills Electric Generation, LLC, Black Hills Corporation, AltaGas Power Holdings (U.S.) Inc. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of AltaGas Renewable Energy Colorado LLC, et. al. Filed Date: 10/16/18. Accession Number: 20181016–5173. Comments Due: 5 p.m. ET 11/6/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–505–004. Applicants: GridLiance High Plains LLC. Description: Compliance filing: SCMCN Compliance Filing ER16–505– 003 Amendment to be effective 4/1/ 2016. Filed Date: 10/17/18. Accession Number: 20181017–5103. Comments Due: 5 p.m. ET 11/7/18. Docket Numbers: ER17–256–006; ER17–242–006; ER17–243–006; ER17– 245–006; ER17–652–006. Applicants: Darby Power, LLC, Gavin Power, LLC, Lawrenceburg Power, LLC, Waterford Power, LLC, Lightstone Marketing LLC. Description: Notice of Non-Material Change in Status of Darby Power, LLC, et. al. Filed Date: 10/16/18. Accession Number: 20181016–5177. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER18–730–001. Applicants: Linden VFT, LLC. Description: Post-Open Solicitation Compliance Filing, et al. of Linden VFT, LLC. Filed Date: 10/16/18. Accession Number: 20181016–5198. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER18–1267–004. Applicants: GridLiance High Plains LLC. Description: Compliance filing: GridLiance High Plains LLC Compliance PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Filing ER18–1267 to be effective 3/31/ 2018. Filed Date: 10/16/18. Accession Number: 20181016–5160. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER18–1652–002; ER10–1595–011; ER10–1598–011; ER10–1616–011; ER10–1618–011; ER10–2960–009; ER15–356–010; ER15– 357–010; ER18–1821–003; ER18–2418– 001. Applicants: AL Mesquite Marketing, LLC, Astoria Generating Company, L.P., Chief Conemaugh Power, LLC, Chief Keystone Power, LLC, Crete Energy Venture, LLC, Great River Hydro, LLC, Lincoln Generating Facility, LLC, New Covert Generating Company, LLC, Rolling Hills Generating, L.L.C., Walleye Power, LLC. Description: Notice of Non-Material Change in Status of AL Mesquite Marketing, LLC, et al. Filed Date: 10/16/18. Accession Number: 20181016–5178. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER19–119–000. Applicants: Techren Solar I LLC. Description: Baseline eTariff Filing: Application for MBR, Waivers, Blanket Authority, Confidential & Expedited Action to be effective 12/31/9998. Filed Date: 10/16/18. Accession Number: 20181016–5141. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER19–120–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL and WM Renewable Energy, LLC Firm P-to-P TSA to be effective 10/17/2018. Filed Date: 10/16/18. Accession Number: 20181016–5159. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER19–121–000. Applicants: AltaGas Renewable Energy Colorado LLC, Black Hills Electric Generation, LLC. Description: § 205(d) Rate Filing: Request for Authorization of Affiliate Transactions of AltaGas and Black Hills to be effective 11/30/2018. Filed Date: 10/16/18. Accession Number: 20181016–5165. Comments Due: 5 p.m. ET 11/6/18. Docket Numbers: ER19–122–000. Applicants: ISO New England Inc., The Connecticut Light and Power Company. Description: § 205(d) Rate Filing: CL&P Request for Approval of Updated Depreciation Rates & Revisions to Sch 21–ES to be effective 5/1/2018. Filed Date: 10/17/18. Accession Number: 20181017–5035. Comments Due: 5 p.m. ET 11/7/18. Docket Numbers: ER19–123–000. E:\FR\FM\23OCN1.SGM 23OCN1 khammond on DSK30JT082PROD with NOTICES Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices Applicants: ISO New England Inc., NSTAR Electric Company. Description: § 205(d) Rate Filing: NSTAR Electric Company Request for Approval of Updated Depreciation Rates to be effective 7/1/2018. Filed Date: 10/17/18. Accession Number: 20181017–5036. Comments Due: 5 p.m. ET 11/7/18. Docket Numbers: ER19–124–000. Applicants: PECO Energy Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PECO Energy submits revisions to OATT, Att. H–7A re: Stipulation in ER17–1519 to be effective 12/1/2017. Filed Date: 10/17/18. Accession Number: 20181017–5037. Comments Due: 5 p.m. ET 11/7/18. Docket Numbers: ER19–125–000. Applicants: Duke Energy Florida, LLC. Description: Tariff Cancellation: DEF– US EcoGen Notice of Termination SA– 180 (LGIA) to be effective 12/17/2018. Filed Date: 10/17/18. Accession Number: 20181017–5075. Comments Due: 5 p.m. ET 11/7/18. Docket Numbers: ER19–126–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–10–17_SA 3179 Long Branch Solar-Cooperative Energy GIA (J709) to be effective 10/2/2018. Filed Date: 10/17/18. Accession Number: 20181017–5105. Comments Due: 5 p.m. ET 11/7/18. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR19–1–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Revisions to Appendix 4E to the Rules of Procedure. Filed Date: 10/16/18. Accession Number: 20181016–5192. Comments Due: 5 p.m. ET 11/6/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Sep<11>2014 20:20 Oct 22, 2018 Jkt 247001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 17, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–23130 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–ORD–2014–0859; FRL–9985–68– ORD] Integrated Science Assessment for Particulate Matter (External Review Draft) Environmental Protection Agency (EPA). ACTION: Notice of public comment period. AGENCY: The Environmental Protection Agency (EPA) is announcing a public comment period for the draft document titled, ‘‘Integrated Science Assessment for Particulate Matter (External Review Draft)’’ (EPA/600/R–18/179). The draft document was prepared by the National Center for Environmental Assessment (NCEA) within EPA’s Office of Research and Development (ORD) as part of the review of the primary (health-based) and secondary (welfare-based) National Ambient Air Quality Standards (NAAQS) for particulate matter. The welfare-based effects evaluated consist of non-ecological effects, specifically visibility impairment, climate effects, and effects on materials. The Integrated Science Assessment (ISA), in conjunction with additional technical and policy assessments, provides the scientific basis for EPA’s decisions on the adequacy of the current NAAQS and the appropriateness of possible alternative standards. EPA is currently developing a separate ISA to support the secondary NAAQS review for ecological effects for oxides of nitrogen, oxides of sulfur, and particulate matter. EPA is releasing this draft document to seek review by the Clean Air Scientific Advisory Committee (CASAC) and the public. In addition, the date and location of a public meeting for CASAC review of this document will be specified in a separate Federal Register notice. This draft document is not final and it does not represent, and should not be construed to represent, any final Agency policy or views. When revising the document, EPA will consider any SUMMARY: PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 53471 public comments submitted during the public comment period specified in this notice. DATES: The public comment period begins on October 23, 2018, and ends December 11, 2018. Comments must be received on or before December 11, 2018. ADDRESSES: The ‘‘Integrated Science Assessment for Particulate Matter (External Review Draft)’’ will be available primarily via the internet on EPA’s Integrated Science Assessment Particulate Matter page at https:// www.epa.gov/isa/integrated-scienceassessment-isa-particulate-matter or the public docket at https:// www.regulations.gov, Docket ID: EPA– HQ–ORD–2014–0859. A limited number of CD–ROM copies will be available. Contact Ms. Marieka Boyd by phone: 919–541–0031; fax: 919–541–5078; or email: boyd.marieka@epa.gov to request a CD–ROM, and please provide your name; your mailing address; and the document title, ‘‘Integrated Science Assessment for Particulate Matter (External Review Draft)’’ to facilitate processing of your request. FOR FURTHER INFORMATION CONTACT: For information on the public comment period, contact the ORD Docket at the EPA Headquarters Docket Center; phone: 202–566–1752; fax: 202–566– 9744; or email: Docket_ORD@epa.gov. For technical information, contact Mr. Jason Sacks, NCEA; phone: 919–541– 9729; fax: 919–541–1818; or email: sacks.jason@epa.gov. SUPPLEMENTARY INFORMATION: I. Information About the Document Section 108(a) of the Clean Air Act directs the Administrator to identify certain pollutants which, among other things, ‘‘cause or contribute to air pollution which may reasonably be anticipated to endanger public health or welfare’’ and to issue air quality criteria for them. These air quality criteria are to ‘‘accurately reflect the latest scientific knowledge useful in indicating the kind and extent of all identifiable effects on public health or welfare which may be expected from the presence of [a] pollutant in the ambient air. . .’’ Under section 109 of the Act, EPA is then to establish NAAQS for each pollutant for which EPA has issued criteria. Section 109(d) of the Act subsequently requires periodic review and, if appropriate, revision of existing air quality criteria to reflect advances in scientific knowledge on the effects of the pollutant on public health or welfare. EPA is also required to review and, if appropriate, revise the NAAQS, based on the revised air quality criteria (for more information on the E:\FR\FM\23OCN1.SGM 23OCN1

Agencies

[Federal Register Volume 83, Number 205 (Tuesday, October 23, 2018)]
[Notices]
[Pages 53470-53471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23130]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-13-000.
    Applicants: AltaGas Renewable Energy Colorado LLC, Black Hills 
Electric Generation, LLC, Black Hills Corporation, AltaGas Power 
Holdings (U.S.) Inc.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of AltaGas Renewable Energy Colorado 
LLC, et. al.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5173.
    Comments Due: 5 p.m. ET 11/6/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER16-505-004.
    Applicants: GridLiance High Plains LLC.
    Description: Compliance filing: SCMCN Compliance Filing ER16-505-
003 Amendment to be effective 4/1/2016.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5103.
    Comments Due: 5 p.m. ET 11/7/18.

    Docket Numbers: ER17-256-006; ER17-242-006; ER17-243-006; ER17-245-
006; ER17-652-006.
    Applicants: Darby Power, LLC, Gavin Power, LLC, Lawrenceburg Power, 
LLC, Waterford Power, LLC, Lightstone Marketing LLC.
    Description: Notice of Non-Material Change in Status of Darby 
Power, LLC, et. al.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5177.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER18-730-001.
    Applicants: Linden VFT, LLC.
    Description: Post-Open Solicitation Compliance Filing, et al. of 
Linden VFT, LLC.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5198.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER18-1267-004.
    Applicants: GridLiance High Plains LLC.
    Description: Compliance filing: GridLiance High Plains LLC 
Compliance Filing ER18-1267 to be effective 3/31/2018.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5160.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER18-1652-002; ER10-1595-011; ER10-1598-011; ER10-
1616-011; ER10-1618-011; ER10-2960-009; ER15-356-010; ER15-357-010; 
ER18-1821-003; ER18-2418-001.
    Applicants: AL Mesquite Marketing, LLC, Astoria Generating Company, 
L.P., Chief Conemaugh Power, LLC, Chief Keystone Power, LLC, Crete 
Energy Venture, LLC, Great River Hydro, LLC, Lincoln Generating 
Facility, LLC, New Covert Generating Company, LLC, Rolling Hills 
Generating, L.L.C., Walleye Power, LLC.
    Description: Notice of Non-Material Change in Status of AL Mesquite 
Marketing, LLC, et al.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5178.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER19-119-000.
    Applicants: Techren Solar I LLC.
    Description: Baseline eTariff Filing: Application for MBR, Waivers, 
Blanket Authority, Confidential & Expedited Action to be effective 12/
31/9998.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5141.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER19-120-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL and WM Renewable Energy, 
LLC Firm P-to-P TSA to be effective 10/17/2018.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5159.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER19-121-000.
    Applicants: AltaGas Renewable Energy Colorado LLC, Black Hills 
Electric Generation, LLC.
    Description: Sec.  205(d) Rate Filing: Request for Authorization of 
Affiliate Transactions of AltaGas and Black Hills to be effective 11/
30/2018.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5165.
    Comments Due: 5 p.m. ET 11/6/18.

    Docket Numbers: ER19-122-000.
    Applicants: ISO New England Inc., The Connecticut Light and Power 
Company.
    Description: Sec.  205(d) Rate Filing: CL&P Request for Approval of 
Updated Depreciation Rates & Revisions to Sch 21-ES to be effective 5/
1/2018.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5035.
    Comments Due: 5 p.m. ET 11/7/18.

    Docket Numbers: ER19-123-000.

[[Page 53471]]

    Applicants: ISO New England Inc., NSTAR Electric Company.
    Description: Sec.  205(d) Rate Filing: NSTAR Electric Company 
Request for Approval of Updated Depreciation Rates to be effective 7/1/
2018.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5036.
    Comments Due: 5 p.m. ET 11/7/18.

    Docket Numbers: ER19-124-000.
    Applicants: PECO Energy Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: PECO Energy submits 
revisions to OATT, Att. H-7A re: Stipulation in ER17-1519 to be 
effective 12/1/2017.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5037.
    Comments Due: 5 p.m. ET 11/7/18.

    Docket Numbers: ER19-125-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Tariff Cancellation: DEF-US EcoGen Notice of 
Termination SA-180 (LGIA) to be effective 12/17/2018.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5075.
    Comments Due: 5 p.m. ET 11/7/18.

    Docket Numbers: ER19-126-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-10-17_SA 3179 Long 
Branch Solar-Cooperative Energy GIA (J709) to be effective 10/2/2018.
    Filed Date: 10/17/18.
    Accession Number: 20181017-5105.
    Comments Due: 5 p.m. ET 11/7/18.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR19-1-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Petition of the North American Electric Reliability 
Corporation for Approval of Proposed Revisions to Appendix 4E to the 
Rules of Procedure.
    Filed Date: 10/16/18.
    Accession Number: 20181016-5192.
    Comments Due: 5 p.m. ET 11/6/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-23130 Filed 10-22-18; 8:45 am]
 BILLING CODE 6717-01-P