EnLink Delaware Crude Pipeline, LLC; Notice of Petition for Declaratory Order, 53466-53467 [2018-23120]

Download as PDF 53466 Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices khammond on DSK30JT082PROD with NOTICES also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Pyrites Hydro, LLC as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. Pyrites Hydro, LLC filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 6115–015. Pursuant to 18 CFR 16.8, 16.9, and 16.10, each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by August 31, 2021. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: October 17, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–23117 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 20:20 Oct 22, 2018 Jkt 247001 FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–119–000] Techren Solar I LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Techren Solar I LLC‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is November 7, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Dated: October 18, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–23204 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR19–3–000] EnLink Delaware Crude Pipeline, LLC; Notice of Petition for Declaratory Order Take notice that on October 11, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2018), EnLink Delaware Crude Pipeline, LLC, (EnLink) filed a petition for declaratory order seeking approval of the overall tariff and rate structure for EnLink’s new pipeline system in the Delaware Basin in New Mexico and Texas, that will gather and transport crude oil from origin points located in Lea and Eddy Counties, New Mexico, to destinations in Eddy County, New Mexico and Loving County, Texas, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. E:\FR\FM\23OCN1.SGM 23OCN1 Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on November 16, 2018. Dated: October 16, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–23120 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR19–4–000] Phillips 66 Company v. Colonial Pipeline Company; Notice of Complaint khammond on DSK30JT082PROD with NOTICES October 17, 2018. Take notice that on October 16, 2018, pursuant to sections 1(5), 6, 8, 9, 13, 15 and 16 of the Interstate Commerce Act, 49 U.S.C. App. 1(5), 6, 8, 9, 13, 15 and 16; section 1803 of the Energy Policy Act of 1992 (Pub. L. 102–486, 106 Stat. 2772 (1992); Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission’s (Commission), 18 CFR 385.206 (2018); and Rules 343.1(a) and 343.2(c) of the Commission’s Procedural Rules Applicable to Oil Pipeline Proceedings, 18 CFR 343.1(a) and 343.2(c) (2018), Phillips 66 Company (Complainant) filed a formal complaint against Colonial Pipeline Company (Respondent), challenging the just and reasonableness of (1) Respondent’s costbased transportation rates in Tariff FERC No. 99.41.0 and predecessor tariffs; (2) Respondent’s market-based rate authority and rates charged pursuant to that authority; and (3) Respondent’s charges relating to product loss allocation and transmix, as more fully explained in the complaint. The Complainants certify that copies of the complaint were served on the contacts for Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will VerDate Sep<11>2014 20:20 Oct 22, 2018 Jkt 247001 not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 15, 2018. Dated: October 17, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–23116 Filed 10–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–538–000] Sendero Carlsbad Gateway, LLC; Notice of Schedule for Environmental Review of the Gateway Project On August 9, 2018, Sendero Carlsbad Gateway, LLC (Gateway) filed an application in Docket No. CP18–538– 000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. The proposed project is known as the Gateway Project (Project), and would provide about 400 million standard cubic feet of natural gas per day from Gateway’s newly expanded Carlsbad Plant (a cryogenic gas processing plant) to the Agua Blanca intrastate pipeline owned by White PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 53467 Water Midstream, LLC. According to Gateway, the Project would help alleviate natural gas supply delivery constraints in southeast New Mexico and satisfy overall demand in the western region of the United States. On August 22, 2018, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA—January 11, 2019 90-day Federal Authorization Decision Deadline—April 11, 2019 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description The Gateway Project would consist of the following facilities: • Approximately 23 miles of 24-inchdiameter natural gas transmission pipeline in Eddy County, New Mexico and Culberson County, Texas; • a new meter station (including a mainline block valve and pig 1 launcher) within the existing Carlsbad Plant in Eddy County; • a mainline block valve at milepost 15.0 in Eddy County; and • a pig receiver and mainline block valve at milepost 23.3 near a White Water Midstream, LLC meter station in Culberson County. Background On August 29, 2018, the Commission issued a Notice of Intent to Prepare An Environmental Assessment for the Proposed Gateway Project, And Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from 1 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. E:\FR\FM\23OCN1.SGM 23OCN1

Agencies

[Federal Register Volume 83, Number 205 (Tuesday, October 23, 2018)]
[Notices]
[Pages 53466-53467]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23120]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR19-3-000]


EnLink Delaware Crude Pipeline, LLC; Notice of Petition for 
Declaratory Order

    Take notice that on October 11, 2018, pursuant to Rule 207(a)(2) of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.207(a)(2) (2018), EnLink Delaware 
Crude Pipeline, LLC, (EnLink) filed a petition for declaratory order 
seeking approval of the overall tariff and rate structure for EnLink's 
new pipeline system in the Delaware Basin in New Mexico and Texas, that 
will gather and transport crude oil from origin points located in Lea 
and Eddy Counties, New Mexico, to destinations in Eddy County, New 
Mexico and Loving County, Texas, all as more fully explained in the 
petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC.

[[Page 53467]]

There is an ``eSubscription'' link on the website that enables 
subscribers to receive email notification when a document is added to a 
subscribed docket(s). For assistance with any FERC Online service, 
please email [email protected], or call (866) 208-3676 (toll 
free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern time on November 16, 2018.

    Dated: October 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-23120 Filed 10-22-18; 8:45 am]