EnLink Delaware Crude Pipeline, LLC; Notice of Petition for Declaratory Order, 53466-53467 [2018-23120]
Download as PDF
53466
Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices
khammond on DSK30JT082PROD with NOTICES
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Pyrites Hydro, LLC as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 106 of the National Historic
Preservation Act.
m. Pyrites Hydro, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 6115–015.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by August 31,
2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23117 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:20 Oct 22, 2018
Jkt 247001
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–119–000]
Techren Solar I LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Techren
Solar I LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 7,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Dated: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23204 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–3–000]
EnLink Delaware Crude Pipeline, LLC;
Notice of Petition for Declaratory Order
Take notice that on October 11, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2018),
EnLink Delaware Crude Pipeline, LLC,
(EnLink) filed a petition for declaratory
order seeking approval of the overall
tariff and rate structure for EnLink’s
new pipeline system in the Delaware
Basin in New Mexico and Texas, that
will gather and transport crude oil from
origin points located in Lea and Eddy
Counties, New Mexico, to destinations
in Eddy County, New Mexico and
Loving County, Texas, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\23OCN1.SGM
23OCN1
Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on November 16, 2018.
Dated: October 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23120 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–4–000]
Phillips 66 Company v. Colonial
Pipeline Company; Notice of
Complaint
khammond on DSK30JT082PROD with NOTICES
October 17, 2018.
Take notice that on October 16, 2018,
pursuant to sections 1(5), 6, 8, 9, 13, 15
and 16 of the Interstate Commerce Act,
49 U.S.C. App. 1(5), 6, 8, 9, 13, 15 and
16; section 1803 of the Energy Policy
Act of 1992 (Pub. L. 102–486, 106 Stat.
2772 (1992); Rule 206 of the Rules of
Practice and Procedure of the Federal
Energy Regulatory Commission’s
(Commission), 18 CFR 385.206 (2018);
and Rules 343.1(a) and 343.2(c) of the
Commission’s Procedural Rules
Applicable to Oil Pipeline Proceedings,
18 CFR 343.1(a) and 343.2(c) (2018),
Phillips 66 Company (Complainant)
filed a formal complaint against
Colonial Pipeline Company
(Respondent), challenging the just and
reasonableness of (1) Respondent’s costbased transportation rates in Tariff
FERC No. 99.41.0 and predecessor
tariffs; (2) Respondent’s market-based
rate authority and rates charged
pursuant to that authority; and (3)
Respondent’s charges relating to
product loss allocation and transmix, as
more fully explained in the complaint.
The Complainants certify that copies
of the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
VerDate Sep<11>2014
20:20 Oct 22, 2018
Jkt 247001
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 15, 2018.
Dated: October 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23116 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–538–000]
Sendero Carlsbad Gateway, LLC;
Notice of Schedule for Environmental
Review of the Gateway Project
On August 9, 2018, Sendero Carlsbad
Gateway, LLC (Gateway) filed an
application in Docket No. CP18–538–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the Gateway Project
(Project), and would provide about 400
million standard cubic feet of natural
gas per day from Gateway’s newly
expanded Carlsbad Plant (a cryogenic
gas processing plant) to the Agua Blanca
intrastate pipeline owned by White
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
53467
Water Midstream, LLC. According to
Gateway, the Project would help
alleviate natural gas supply delivery
constraints in southeast New Mexico
and satisfy overall demand in the
western region of the United States.
On August 22, 2018, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—January 11, 2019
90-day Federal Authorization Decision
Deadline—April 11, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Gateway Project would consist of
the following facilities:
• Approximately 23 miles of 24-inchdiameter natural gas transmission
pipeline in Eddy County, New Mexico
and Culberson County, Texas;
• a new meter station (including a
mainline block valve and pig 1 launcher)
within the existing Carlsbad Plant in
Eddy County;
• a mainline block valve at milepost
15.0 in Eddy County; and
• a pig receiver and mainline block
valve at milepost 23.3 near a White
Water Midstream, LLC meter station in
Culberson County.
Background
On August 29, 2018, the Commission
issued a Notice of Intent to Prepare An
Environmental Assessment for the
Proposed Gateway Project, And Request
for Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers.
In response to the NOI, the
Commission received comments from
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
E:\FR\FM\23OCN1.SGM
23OCN1
Agencies
[Federal Register Volume 83, Number 205 (Tuesday, October 23, 2018)]
[Notices]
[Pages 53466-53467]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23120]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR19-3-000]
EnLink Delaware Crude Pipeline, LLC; Notice of Petition for
Declaratory Order
Take notice that on October 11, 2018, pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2018), EnLink Delaware
Crude Pipeline, LLC, (EnLink) filed a petition for declaratory order
seeking approval of the overall tariff and rate structure for EnLink's
new pipeline system in the Delaware Basin in New Mexico and Texas, that
will gather and transport crude oil from origin points located in Lea
and Eddy Counties, New Mexico, to destinations in Eddy County, New
Mexico and Loving County, Texas, all as more fully explained in the
petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC.
[[Page 53467]]
There is an ``eSubscription'' link on the website that enables
subscribers to receive email notification when a document is added to a
subscribed docket(s). For assistance with any FERC Online service,
please email [email protected], or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on November 16, 2018.
Dated: October 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-23120 Filed 10-22-18; 8:45 am]
BILLING CODE 6717-01-P