Pyrites Hydroelectric Project; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 53465-53466 [2018-23117]
Download as PDF
khammond on DSK30JT082PROD with NOTICES
Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2018),
EPIC Crude Pipeline, LP (EPIC Crude),
filed a petition for declaratory order
seeking approval of the overall tariff and
rate structure, terms of service, and
open season procedures for a new 730mile pipeline system that will originate
in Orla, Texas and transport crude
petroleum produced in the Permian
Basin to points of interconnection with
terminals located in Orla, Saragosa,
Crane, Wink, Midland, Helen, and
Gardendale, Texas as well as the Port of
Corpus Christi, which will provide
export access, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on November 16, 2018.
Dated: October 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23119 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:20 Oct 22, 2018
Jkt 247001
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–117–000]
Innovative Solar 54, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced Innovative Solar 54,
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 6,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
53465
Dated: October 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23129 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6115–015]
Pyrites Hydroelectric Project; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 6115–015.
c. Date Filed: August 31, 2018.
d. Submitted By: Pyrites Hydro, LLC.
e. Name of Project: Pyrites
Hydroelectric Project.
f. Location: On the Grass River, a
tributary to the St. Lawrence River, near
the Town of Canton in St. Lawrence
County, New York. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Kevin M. Webb, Hydro Licensing
Manager, Pyrites Hydro, LLC, 100
Brickstone Square, Suite 300, Andover,
MA 01810, (978) 935–6039; email—
kevin.webb@enel.com.
i. FERC Contact: Chris Millard at
(202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Pyrites Hydro, LLC filed a request
to use the Traditional Licensing Process
on August 31, 2018 and provided public
notice of the request on August 31,
2018. In a letter dated October 17, 2018,
the Director of the Division of
Hydropower Licensing approved Pyrites
Hydro, LLC’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
E:\FR\FM\23OCN1.SGM
23OCN1
53466
Federal Register / Vol. 83, No. 205 / Tuesday, October 23, 2018 / Notices
khammond on DSK30JT082PROD with NOTICES
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Pyrites Hydro, LLC as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 106 of the National Historic
Preservation Act.
m. Pyrites Hydro, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 6115–015.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by August 31,
2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–23117 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:20 Oct 22, 2018
Jkt 247001
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–119–000]
Techren Solar I LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Techren
Solar I LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 7,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Dated: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–23204 Filed 10–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–3–000]
EnLink Delaware Crude Pipeline, LLC;
Notice of Petition for Declaratory Order
Take notice that on October 11, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2018),
EnLink Delaware Crude Pipeline, LLC,
(EnLink) filed a petition for declaratory
order seeking approval of the overall
tariff and rate structure for EnLink’s
new pipeline system in the Delaware
Basin in New Mexico and Texas, that
will gather and transport crude oil from
origin points located in Lea and Eddy
Counties, New Mexico, to destinations
in Eddy County, New Mexico and
Loving County, Texas, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\23OCN1.SGM
23OCN1
Agencies
[Federal Register Volume 83, Number 205 (Tuesday, October 23, 2018)]
[Notices]
[Pages 53465-53466]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23117]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6115-015]
Pyrites Hydroelectric Project; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 6115-015.
c. Date Filed: August 31, 2018.
d. Submitted By: Pyrites Hydro, LLC.
e. Name of Project: Pyrites Hydroelectric Project.
f. Location: On the Grass River, a tributary to the St. Lawrence
River, near the Town of Canton in St. Lawrence County, New York. No
federal lands are occupied by the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Mr. Kevin M. Webb, Hydro Licensing
Manager, Pyrites Hydro, LLC, 100 Brickstone Square, Suite 300, Andover,
MA 01810, (978) 935-6039; [email protected]
i. FERC Contact: Chris Millard at (202) 502-8256; or email at
[email protected].
j. Pyrites Hydro, LLC filed a request to use the Traditional
Licensing Process on August 31, 2018 and provided public notice of the
request on August 31, 2018. In a letter dated October 17, 2018, the
Director of the Division of Hydropower Licensing approved Pyrites
Hydro, LLC's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are
[[Page 53466]]
also initiating consultation with the New York State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Pyrites Hydro, LLC as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 106 of the National Historic Preservation Act.
m. Pyrites Hydro, LLC filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 6115-015. Pursuant to 18
CFR 16.8, 16.9, and 16.10, each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by August 31,
2021.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: October 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-23117 Filed 10-22-18; 8:45 am]